Open ViolationsA public record project
/

172 India Street, Brooklyn

BIN 3425139BBL 3025417506Block 2541 · Lot 7506Built 20175 storiesGoogle Maps & Street View ↗Tax & zoning on NYC.gov ↗
HPD registration valid
Export CSV
OverviewHealth scoreTimelineFinesOwnership historyOwnerRelated

172 India Street at a glance

172 India Street, Brooklyn has 0 open city records on file, none of them Class C, and no balance recorded as due on OATH/ECB summonses. No marshal evictions are on record for this building. No recorded sale is on file for its lot. The most recent record is dated Dec 8, 2025.

Open Class C
0
Immediately hazardous — click to see them
Open Class B
0
Hazardous — click to see them
Open Class A
0
Non-hazardous — click to see them
Fines due
$0.00
Balance on OATH/ECB summonses
Open per unit
0.00
7 residential units · NYC average 0.31
Evictions
0
No marshal evictions on record
Permits on file
19
Construction permits filed with DOB
Last activity
Dec 8, 2025
Bedbugs record

Health score for 172 India Street

A composite of the public indicators below. How it is scored.

A
Health score · Sep 11, 2026
Scored from all 83 public records for this building
Scored from city records as published, which lag reality by a day or two, and closed violations rest on owner self-certification. A grade summarizes the public record, not the building itself. Full methodology · report a problem
Open Class C violations
Immediately hazardous, uncertified
This building 0
Open Class B violations
Hazardous
This building 0
Heat & hot water records
Violations and complaints, last 24 months
This building 0
Unpaid penalties
OATH/ECB summonses with balance due
This building $0
Bedbug filings with infestations
Annual LL69 filings on record
This building 0
Tenant litigation
Open HP actions in Housing Court
This building 0
Active vacate order
HPD or FDNY order to vacate, still in effect
This building No

Record timeline for 172 India Street

83 records on file, every agency interleaved. Class A, B and C are HPD’s hazard tiers: C is immediately hazardous, A and B explained here.

Download this timeline (CSV) →

OATH / ECB summonses & fines at 172 India Street

No balance is recorded as due across the 27 summonses below, out of $45,650.00 in penalties imposed. Balances are as the city publishes them; a settlement or write-off that never reached the dataset will not show here. New to these? How an OATH summons becomes a penalty, explained.

OATH and ECB summonses for 172 India Street
049134955MMay 5, 2025IMPROPER RECEPTACLE FAILURE TO CONTAINERIZE - RESIDENTIAL 1STAug 4, 2025Pending
035206368JJan 17, 2017CONSTRUCTION SUPERINTENDENT FAILED TO PERFORM DUTIES PER RULEJul 6, 2017Written off
1262004Jan 17, 2017CONSTRUCTION SUPERINTENDENT FAIL TO PERFORM DUTIES PER RULE. THE FOLLOWING HAZARDOUS CONDITIONS WERE OBSERVED & STOP WORK ORDER WAS ISSUED ON THIS DATE: 1)NO ROOF PROTECTION 2)NO OVERHEAD PROTECTION 3)NO LOGSJun 28, 2017Found in violation
1262006Jan 17, 2017LOG. NOTE: AT THE TIME OF MY INSPECTION OF A 4 STY BLDG,CONSTRUCTION WORK IN PROGRESS. UPON REQUEST FOR SUPERINTENDENT NONE WAS PROVIDED & THERE WERE NO LOGS TO VERIFY SITE VISIT OR DESIGNATED COMPETENT PERSONJun 28, 2017Found in violation
035206369LJan 17, 2017MISCELLANEOUS VIOLATIONSJun 28, 2017Written off
1625088Jan 17, 2017SEC. 3309.10(BC) PROTECTION OF ROOF/SKYLIGHTS. NOTE: AT THE TIME OF MYINSPECTION,I OBERVE THAT THERE ARE NO ROOF PROTECTION AT EXP#2. I ALSOOBSERVED THAT THERE WERE NO ROOF PROTECTION AT EXP#4 FAILURE TO PROVIDJun 28, 2017Written off
1625092Jan 17, 2017DESIGNATION OF CONSTRUCTION SUPERINTENDENT. NOTE: AT THE TIME OF MY INSPECTION OF A 4 STY BLDG AT ROOF LEVEL CONSTRUCTION WORK IN PROGRESS. UPON REQUEST FOR SUPERINTENDENT OF CONSTRUCITON ON SITE NONE WAS PROVIJul 6, 2017Written off
1625091Jan 17, 2017FAILURE TO INSTITUTE & MAINTAIN SAFETY EQUIPMENT MEASURES & TEMPORARY CONSTRUCTION. NOTE: AT THE TIME OF MY INSPECTION OF A 4 STY BLDG AT ROOF LEVEL,CONSTRUCITON WORK IN PROGRESS. I OBSERVED THAT THERE WERE NOJul 6, 2017Written off
1625115Jan 17, 2017SEC. 3301.6 DESIGN SIZES CAPACITY OF THE MATERIAL,STRUCTURE TEMPORARY CONSTRUCTION & EQUIPMENT. NOTE: AT THE TIME OF MY INSPECTION,I OBSERVED CONSTRUCTION WORK IN ORIGRESS ON A 4 STY BLDG UP TO ROOF LEVEL. I OBJun 28, 2017Written off
035206365YJan 17, 2017CONSTRUCTION SUPERINTENDENT FAILED TO PERFORM DUTIES PER RULEJun 28, 2017Found in violation
035206366XJan 17, 2017MISCELLANEOUS VIOLATIONSJun 28, 2017Written off
035206367HJan 17, 2017FAILURE TO SAFEGUARD ALL PERSONS AND PROPERTY AFFECTED BY CONSTRUCTIONJul 6, 2017Written off
035206370ZJan 17, 2017CONSTRUCTION SUPERINTENDENT FAILED TO PERFORM DUTIES PER RULEJun 28, 2017Found in violation
1129525Mar 29, 2016SEC. 3309.6 FAILRUE TO MONITOR ADJOINING STRUCTURES FOR MOVEMENT IN ALL DIRECTIONS DURING EXCAVATION. RELATED ACTIVITY THAT MAY ADVERSELY AFFECT ADJOINING STRUCTURE. AT THE TIME OF INSPECTION IT WAS OBSERVEDMay 18, 2016Found in violation
035174750RMar 29, 2016MISCELLANEOUS VIOLATIONSMay 18, 2016Found in violation
035156705ZFeb 2, 2016MISCELLANEOUS VIOLATIONSMar 21, 2016Settled by stipulation
035156706KFeb 2, 2016FAILURE TO SAFEGUARD ALL PERSONS AND PROP AFFECTED BY CONST OPERATIONSMar 22, 2016Found in violation
1132467Feb 2, 2016SEC. 3309.4 FAILURE TO PERFORM INSPECTION & DOCUMENT CONDITIONS OF EXISTING STRUCTURES ADJOINING AN EXCAVATION IN A PRE-CONSTRUCTION SURVEY.AT THE TIME OF INSPECTION IT WAS OBSERVED THAT CRACK WAS IN THE ADJOINMar 21, 2016Settled by stipulation
035156708YFeb 2, 2016FAILURE TO SAFEGUARD ALL PERSONS AND PROPERTY AFFECTED BY CONSTRUCTIONMar 22, 2016Found in violation
035156704RFeb 2, 2016MISCELLANEOUS VIOLATIONSMar 21, 2016Settled by stipulation
1402795Feb 2, 2016FAILURE TO SAFEGUARD ALL PERSONS & PROPERTY AFFECTED BY CONSTRUCTION OPERATIONS. AT THE TIME OF INSPECTION IT WAS OBSERVED THAT THEY WERE CRACK IN ADJOINING BLDG THIS WAS DUE TO THE UNDERPINNING OPERATION. THERMar 22, 2016Found in violation
1343436Feb 2, 2016FAILURE TO SAFEGUARD ALL PERSONS & PROPERTY AFFECTED BY CONSTRUCTION OPERATION. AT THE TIME OF INSPECITON IT WAS OBSERVED THAT CRACK WAS IN THE SIDE YARD OF THE ADJOINING BLDG AT EXP#2. THAT WAS CAUSE BY THEMar 22, 2016Found in violation
1137533Feb 2, 2016SEC. 3309.6 FAILURE TO MONITOR ADJOINING STRUCTURES FOR MOVEMENT IN ALL DIRECTIONS DURING EXCAVATION RELATED ACTIVITY THAT MAY ADVERSELY AFFECT ADJOINING STRUCTURES. AT THE TIME OF INSPECTION EXCAVATION OPERATIMar 21, 2016Settled by stipulation
801860Sep 22, 2015FAILURE TO PROVIDE NOTIFICATION FOR DEMO @ TIME OF INSP NOTICED DEMO OF 2STY BLDG COMPLETED NO NOTIFICATION PROVIDED.REM:PROVIDE NOTIFICATION.Feb 8, 2016Found in violation
035146005ZSep 22, 2015FAILURE TO PROVIDE REQUIRED NOTIFICATION PRIOR TO DEMOLITIONFeb 8, 2016Found in violation
1131056Sep 22, 2015BC3309.9,FAILURE TO WEATHER PROOF.NOTCIED @ TIME OF INSP DEMO OF 2 STYBLDG COMPLETED.NOTICED @ EXP4 ADJACENT BLDG NO WEATHER PROOFED CORRECTLY.WEATHER PROOFING SHEETING PEELING OFF & MISSING SPOTS.WOOD SHEETINGFeb 8, 2016Found in violation
035146004RSep 22, 2015MISCELLANEOUS VIOLATIONSFeb 8, 2016Found in violation

Ownership history for 172 India Street

Every deed the City Register has recorded against this building’s tax lot (BBL 3025417506), newest first. A price is the consideration stated on the deed; transfers between related parties, into an LLC, or by a referee often record none, shown as “—”. Each row links to the document in ACRIS.

No deed for this lot appears in ACRIS, the City Register's index of recorded documents. Condominium units are recorded on their own lots and are not matched to buildings yet.