| 049769014J | May 7, 2026 | IMPROPER RECEPTACLE FAILURE TO CONTAINERIZE - RESIDENTIAL 1ST | Aug 6, 2026 | Pending | — |
| 049557582N | Apr 27, 2026 | FAIL TO RECYCLE ORGANIC WASTE 9 OR MORE DWELLING UNITS 1ST | Jul 27, 2026 | Pending | — |
| 014181692L | Apr 12, 2025 | INSPECTION AND TESTING | Jun 3, 2025 | Found in violation | — |
| 014181687R | Apr 12, 2025 | INSPECTION AND TESTING | Jun 3, 2025 | Found in violation | — |
| 039026313J | Aug 3, 2020 | FAILURE TO MAINTAIN ELEVATOR OR CONVEYING SYSTEM | Jul 14, 2021 | Found in violation | — |
| 672329 | Aug 3, 2020 | CLASS 1 ITEM: MISSING DLM AS NOW REQUIRED BY CODE CLASS 2 ITEMS: PHONE DOES NOT CONNECT. MISALIGNED CAB MIRROR. MISSING BRAKE MAINT TAG. MISSING MAINT LOG. MAIN LINE MISSING CONTRACTOR STICKER | Jul 14, 2021 | Found in violation | — |
| 035179208J | Dec 6, 2016 | WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AMENDMENTS | Jan 23, 2017 | Settled by stipulation | — |
| 785681 | Dec 6, 2016 | WORK DOESN'T CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND/OR APPROVED AMENDMENTS. JOB # 320597047 ON AN ENERGY (1ST FL THROUGH 7TH FL)ALL CONTRARY TO APPROVED CONST. DOCUMENTS. INSTALLED BOILERS ARE LAARS,MOD | Jan 23, 2017 | Settled by stipulation | — |
| 035165316J | May 25, 2016 | MISCELLANEOUS VIOLATIONS | Sep 26, 2016 | Pending | — |
| 768170 | May 25, 2016 | SEC. 3308.6 NO HORRIZONTAL NETTING PROVIDED AS PER CODE WORKING ON THEFLOOR ERECTED DECK. NO HORRIZONTAL NETTING PROVIDED AS PER CODE. STOP ALL WORK 6TH FL & ABOVE PIPE SCAFFOLDING W/NETTING. PIPE SCAFFOLDING | Sep 26, 2016 | Admitted the violation | — |
| 950037 | Mar 31, 2016 | SEC. 3301.6 DESIGN SIZES & CAPACITY OF MATERIALS,STRUCTURES,TEMPORARY CONSTRUCTION & EQUIPMENT. NOTE: AT THE TIME OF MY INSPECTION OF A 7 STY BLDG AT 5TH FL LEVEL,I OBSERVED TEMPORARY CONSTRUCTION PLATFORM MADE | May 18, 2016 | Found in violation | — |
| 949783 | Mar 31, 2016 | SEC. 3301.7 DESIGN DOCUMENTS TO BE KEPT ON SITE. NOTE: AT THE TIME OF MY INSPECTION OF A 7 STY BLDG UP TO 5TH FL LEVEL,CONSTRUCITON WORK IN PROGRESS. I OBSERVED SAFETY EMBEDDED STRAPS INSTALLED ON 3RD & 4TH FLR | May 16, 2016 | Found in violation | — |
| 035183256X | Mar 31, 2016 | MISCELLANEOUS VIOLATIONS | May 18, 2016 | Found in violation | — |
| 035183255Y | Mar 31, 2016 | MISCELLANEOUS VIOLATIONS | May 16, 2016 | Found in violation | — |
| 1131697 | Jan 21, 2016 | FAILURE TO SAFEGUARD ALL PERSONS AND PROPERTY AFFECTED BY CONSTRUCTION OPERATIONS.NOTE:AT THE TIME OF MY INSP.CONSTRUCTION WORK IN PROGRESS OF A 7 STORY BLSG UP TO 2ND FLOOR LEVEL.(FORMWORK)WITH REBAR TO 3RD FL | Mar 7, 2016 | Found in violation | — |
| 035166504L | Jan 21, 2016 | FAILURE TO SAFEGUARD ALL PERSONS AND PROPERTY AFFECTED BY CONSTRUCTION | Mar 8, 2016 | Found in violation | — |
| 035166502H | Jan 21, 2016 | FAILURE TO SAFEGUARD ALL PERSONS AND PROP AFFECTED BY CONST OPERATIONS | Mar 7, 2016 | Found in violation | — |
| 035166503J | Jan 21, 2016 | MISCELLANEOUS VIOLATIONS | Mar 7, 2016 | Found in violation | — |
| 1131700 | Jan 21, 2016 | 3301.1.1 RESPONSIBILITY FOR SAFETY.NOTE:AT THE TIME OF MY INSP.OF A 7 STORY BLDG OF 2ND FLOOR LEVEL(FORMWORK)WITH REBAR UP TO 3RD FLOOR LEVEL APPROX.18'IN HEIGHT I OBERVED THAT THERE WERE NO SAFETY MEASURES IN | Mar 7, 2016 | Found in violation | — |
| 1131704 | Jan 21, 2016 | FAILURE TO SAFEGUARD ALL PERSONS AND PROPERTY AFFECTED BY CONSTRUCTION OPERATIONS.NOTE:AT THE TIME OF MY INSP.OF A 7 STORY BLDG UP TP 2ND FL LEVEL(FORMWORK)WITH REBAR UP TP 3RD FLOORLEVEL APPROX.18'.I OBERVED T | Mar 8, 2016 | Found in violation | — |
| 040402591L | Jun 9, 2008 | RECYCLABLES PLACED FOR COLLECTION WITH NON-RECYCLABLES | Jul 10, 2008 | Defaulted (did not respond) | — |