| 049750066L | Apr 22, 2026 | DIRTY SIDEWALK | Jul 21, 2026 | Pending | — |
| 047926909Y | Jul 27, 2023 | STORAGE OF RECEPTACLES PLACED OUT PRIOR TO 8PM WITHOUT A RECEPTACLE | Oct 20, 2023 | Pending | — |
| 047926811X | Jun 6, 2023 | LOOSE RUBBISH 1ST OCCURRENCE | Aug 28, 2023 | Pending | — |
| 047765204J | Apr 11, 2023 | LOOSE RUBBISH 1ST OCCURRENCE | Jul 10, 2023 | Pending | — |
| 047031699H | Jan 26, 2021 | LOOSE RUBBISH | Apr 26, 2021 | Pending | — |
| 035421407P | May 7, 2019 | MISCELLANEOUS VIOLATIONS | Aug 19, 2019 | Settled by stipulation | — |
| 1172240 | May 7, 2019 | 3301.13.13 SUPERINTENDENT MUST MAINTAIN LOG BOOK. AT TIME OF INSPECTION AT 4 STORY EXISTING BUILDING ACTIVE JOB SITE I OBSERVED WORKERS UNLOADING CEMENT BAGS AND STORING THEM AT CELLAR,UPON REQUEST FOR SUPERINT | Aug 19, 2019 | Settled by stipulation | — |
| 035407994H | Apr 24, 2019 | WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AMENDMENTS | Aug 5, 2019 | Admitted the violation | — |
| 1282753 | Apr 24, 2019 | WORK DOES NOT CONFIRM TO APPROVED CONSTRUCTION DOCS.AND/OR APPROVED AMENDMENTS.NOTED:PREMISES 4-STORY ATTACHED NFP MASONRY FRAME BLD.AT THE TIME OF INSPECTION,I OBSERVED CONSTRUCTION WORK IN PROGRESS IN CELLAR | Aug 5, 2019 | Admitted the violation | — |
| 1249865 | Jun 12, 2017 | FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN SUMMONS/VIO#35209709M ISSUED ON 04/13/17 & TO FILE A C OF C PURSUANT TO 28-201.1 & 1RCNY 102-01. FOR C OF C. REMEDY: COMPLY W/COMM'S ORDER &/OR FILE A C OF C. | Jul 31, 2017 | Found in violation | — |
| 035234494Z | Jun 12, 2017 | FAIL TO COMPLY W COMMISSIONER ORDER TO FILE CERT OF CORRECTION W DOB | Jul 31, 2017 | Found in violation | — |
| 035209709M | Apr 13, 2017 | FAILURE TO PROTECT ADJOINING STRUCTURES DURING EXCAVATION OPERATIONS | Jul 10, 2017 | Found in violation | — |
| 1355417 | Apr 13, 2017 | FAILURE TO PROTECT ADJOINING STRUCTURES DURING EXCAVATION OPERATIONS. OBSERVED:EXCAVATION @REAR YARD OF PREMISES HAS EXPOSED & UNDERMINED FOUNDATION OF ADJACENT PREMISES.700 MANHATTAN AVE &706 MANHATTAN AVE.REM | Jul 10, 2017 | Found in violation | — |
| 044760681K | Nov 28, 2016 | FAILURE TO PROPERLY PUT RECYCS OUT FOR COLLECTION 1TO8DWELLING UNITS | Dec 29, 2016 | Pending | — |
| 1416643 | Oct 19, 2016 | FAILURE TO PROVIDE APPROVED/ACCEPTED PLAN @JOBSITE @TIME OF INSPECTION.NOTED@TIME OF INSPECTION CONTRACTOR IS INSTALLING A TEMPORARY STEEL BRACING &NO PLANS ON SITE FOR THIS WORK WAS PROVIDED BRACING IS LOCATED | Jun 7, 2017 | Written off | — |
| 035139242R | Oct 19, 2016 | FAIL TO PROVIDE APPROVED OR ACCEPTED CONSTRUCTION DOCS AT JOB SITE | Jun 7, 2017 | Written off | — |
| 035156253R | Aug 26, 2016 | FAILURE TO PROVIDE PROTECTION AT SIDES OF EXCAVATION | Mar 1, 2017 | Written off | — |
| 1228850 | Aug 26, 2016 | FAILURE TO FILE A SPECIAL INSP STATEMENT OF RESPONSIBILTY PRIOR TO PERMIT ISSUANCE & PRIOR TO START OF WORK UNDER SPECIAL INSP REQUIREMENT. @ TIME OF INSP IT OBSERVED THAT EXCAVATION WAS ONGOING & THERE WAS NO | Oct 17, 2016 | Settled by stipulation | — |
| 1705974 | Aug 26, 2016 | FAILURE TO PROVIDE PROTECTION @ SIDES OF EXCAVATION. @ TIME OF INSP IT WAS OBSERVED THAT THERE WAS NO PROTECTION FOR THE EXCAVATION WHICH WAS GREATER THAN 5 FT. REM: PROVIDE PROTECTION. | Mar 1, 2017 | Written off | — |
| 1705999 | Aug 26, 2016 | FAILURE TO NOTIFY DOB W/IN 24-48 HOURS OF THE START OF EXCAVATION. @ TIME OF INSP IT WAS OBSERVED THAT EXCAVATION OPERATION WAS ONGOING & THERE WAS NO NOTIFICATION ON FILE. REM: OFFICIALLY NOTIFY DOB BY CALLING | Mar 6, 2017 | Written off | — |
| 035156254Z | Aug 26, 2016 | FAILURE TO SAFEGUARD ALL PERSONS AND PROP AFFECTED BY CONST OPERATIONS | Jan 30, 2017 | Written off | — |
| 035156252P | Aug 26, 2016 | MISCELLANEOUS VIOLATIONS | Oct 17, 2016 | Settled by stipulation | — |
| 035156255K | Aug 26, 2016 | FAILURE TO NOTIFY THE DEPT PRIOR TO THE COMMENCEMENT OF EARTHWORK | Mar 6, 2017 | Written off | — |
| 430417 | Aug 26, 2016 | FAILURE TO SAFEGUARD ALL PERSONS & PROPERTY AFFECTED BY CONSTRUCTION OPERATION. @ TIME OF INSP IT WAS OBSERVED THAT EXCAVATION OPERATION OVER 5FT WAS NOT SHORE UP & THERE WAS A WORKER IN THE UNSAFE AREA. REM: S | Jan 30, 2017 | Written off | — |
| 043983213L | Oct 16, 2015 | LOOSE RUBBISH | Nov 17, 2015 | Pending | — |
| 044451311Y | Aug 10, 2015 | FAILURE TO PROPERLY PUT RECYCS OUT FOR COLLECTION 1TO8DWELLING UNITS | Sep 10, 2015 | Pending | — |
| 042145350Z | Jun 9, 2015 | STORAGE OF RECEPTACLES - 3RD OFFENSE | Jun 30, 2015 | Found in violation | — |
| 041609082H | Apr 27, 2015 | FAILURE TO PROPERLY PUT RECYCS OUT FOR COLLECTION 1TO8DWELLING UNITS | May 28, 2015 | Defaulted (did not respond) | — |
| 0186190190 | Dec 2, 2014 | STORAGE OF RECEPTACLES | Jan 6, 2015 | SETTL IN-VIO | — |
| 041399404Z | Aug 21, 2014 | FAILURE TO BUNDLE NEWSPAPES MAGAZINES CARDBOARD 1 TO 8 DWELLING UNITS | Sep 23, 2014 | Pending | — |
| 0184844184 | Jun 26, 2014 | STORAGE OF RECEPTACLES | Jul 29, 2014 | Pending | — |
| 0172782886 | Feb 9, 2009 | IMPROPER MISUSED MECHANIZED RECYCLING CONTAINER | Apr 7, 2009 | Pending | — |
| 793526 | Oct 20, 2006 | EXIT PASSAGEWAY OR CORRIDOR:TOTAL OBSTRUCTION. OBSTRUCTION NOTED:AT REAR YARD,1 FL LEVEL,ILLEGAL STEEL STORAGE BOX ERECTED 10'W X 10'D X 8'HSTEEL STORAGE BOX OBSTRUCTS TENANTS FROM THE ABOVE 2,3,4 FLOORS | Dec 4, 2006 | Found in violation | — |
| 034542059M | Oct 20, 2006 | WORK WITHOUT A PERMIT: HAZARDOUS. | Dec 4, 2006 | Found in violation | — |
| 0156327261 | Oct 20, 2006 | SIDEWALK OBSTRUCTION | Dec 1, 2006 | Pending | — |
| 034542381K | Oct 20, 2006 | EXIT PASSAGEWAY OR CORRIDOR: TOTAL OBSTRUCTION. | Dec 4, 2006 | Found in violation | — |
| 793514 | Oct 20, 2006 | WORK W/O A PERMIT. ILLEGAL WORK NOTED:AT FIRST FLR REAR YARD A STORAGESTEEL BOX MEASURING LOFT LONG BY LOFT WIDE & 8FT HIGH SETTING ON CONCRETE BASE CREATING HAZ. FOR SECONDARY MEANS OF EGRESS. | Dec 4, 2006 | Found in violation | — |
| 0130387813 | Jun 18, 2003 | SIDEWALK OBSTRUCTION | Jul 23, 2003 | Written off | — |