154 Washington Avenue at a glance
154 Washington Avenue, Brooklyn has 131 open city records on file, 51 of them Class C (immediately hazardous), and $890,284.00 recorded as due on OATH/ECB summonses. The most recent record is dated Dec 2, 2025.
Open Class C
51
Immediately hazardous — click to see them
Open Class B
71
Hazardous — click to see them
Open Class A
9
Non-hazardous — click to see them
Fines due
$890,284.00
Balance on OATH/ECB summonses
Permits on file
3
Construction permits filed with DOB
Last activity
Dec 2, 2025
HPD record
Health score for 154 Washington Avenue
A composite of the public indicators below. How it is scored.
F
Health score · Aug 5, 2026
Scored from the 300 most recent of 326 public records for this building
Open Class C violations
Immediately hazardous, uncertified
This building 51
Open Class B violations
Hazardous
This building 71
Heat & hot water records
Violations and complaints, last 24 months
This building 0
Unpaid penalties
OATH/ECB summonses with balance due
This building $890,284
Bedbug filings with infestations
Annual LL69 filings on record
This building 0
Tenant litigation
Open HP actions in Housing Court
This building 0
Active vacate order
HPD or FDNY order to vacate, still in effect
This building No
Record timeline for 154 Washington Avenue
Showing the 300 most recent of 326 records; the CSV has the full history. Class A, B and C are HPD’s hazard tiers: C is immediately hazardous, A and B explained here.
OATH / ECB summonses & fines at 154 Washington Avenue
$890,284.00 is recorded as due across the 70 summonses below, out of $974,535.00 in penalties imposed. Balances are as the city publishes them; a settlement or write-off that never reached the dataset will not show here. New to these? How an OATH summons becomes a penalty, explained.
| 1491299 | Dec 2, 2025 | REMOVED OR DEFACED A WRITTEN POSTED VACATE ORDER. NOTED: AT TIME OF IN | Aug 21, 2026 | Pending | $12,500.00 |
| 1803848 | Sep 18, 2025 | REMOVED OR DEFACED A WRITTEN POSTED VACATE ORDER.NOTED:AT THE TIME OF | Nov 6, 2026 | Pending | $12,500.00 |
| 1798544 | Aug 12, 2025 | REMOVED OR DEFACED A WRITTEN POSTED VACATE ORDER. NOTED AT TIME OF INS | Nov 6, 2026 | Defaulted (did not respond) | $25,000.00 |
| 1714098 | Jun 13, 2025 | FAILURE TO MAINTAIN BUILDING WALL(S) OR APPURTENANCES. AT THE TIME OF | Nov 6, 2026 | Defaulted (did not respond) | $25,000.00 |
| 1527200 | Jun 13, 2025 | REMOVED OR DEFACED A WRITTEN POSTED VACATE ORDER. NOTED: AT TIME OF IN | Feb 17, 2026 | Found in violation | $12,500.00 |
| 1233270 | Mar 31, 2025 | REMOVED OR DEFACED A WRITTEN VACATE ORDER NOTED: AT TIME OF INSPECTION | Nov 6, 2026 | Defaulted (did not respond) | $25,000.00 |
| 1071824 | Mar 14, 2023 | SIDEWALK SHED PERMIT EXPIRED ON 06/11/2022. ON A 3 STORY BUILDING OBSE | May 24, 2023 | Found in violation | $625.00 |
| 1645317 | Nov 18, 2022 | SIDEWALK SHED PERMIT EXPIRED ON 06/11/21. ON 3 STORY BUILDING I OBSERV | Oct 16, 2023 | Defaulted (did not respond) | $6,250.00 |
| 973308 | Apr 5, 2022 | FAILURE TO PROVIDE PROJECT INFO PANEL ON SWS PARAPET.ATOI CONST SITE C | Aug 24, 2022 | Found in violation | — |
| 1579579 | Aug 6, 2021 | FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/V | Apr 29, 2022 | Dismissed | — |
| 1580550 | Aug 6, 2021 | FAILURE TO MAINTAIN BUILDING WALLS OR APPURTENANCES.AT THE TIME OF INS | Apr 29, 2022 | Found in violation | — |
| 1645924 | Jun 3, 2021 | FAILURE TO MAINTAIN BLDG WALLS OR APPURTENANCES ATOI&OBSERVED@EXP1 FRO | Oct 13, 2021 | Defaulted (did not respond) | $203.00 |
| 1086009 | Feb 25, 2021 | AT FACADE OF BUILDING, PARAPET LEANS INWARD AND CRACKS AND SEPARATION | Aug 5, 2021 | Defaulted (did not respond) | $12,500.00 |
| 1724563 | Feb 19, 2021 | FAILURE TO COMPLY W/COMMISSIONER'S ORDER CONTAINED IN SUMMONS/V3544303 | Jun 30, 2021 | Found in violation | $3,125.00 |
| 1728038 | Dec 29, 2020 | FAILURE TO COMPLY W/ COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATI | Jul 12, 2021 | Defaulted (did not respond) | $3,125.00 |
| 1634150 | Oct 7, 2020 | FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN SUMMONS/VIO#35443033 | Mar 9, 2022 | Defaulted (did not respond) | $3,125.00 |
| 1759884 | Jan 11, 2020 | FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN SUMMONS/VIO#35443033 | Dec 17, 2020 | Defaulted (did not respond) | $3,125.00 |
| 1629483 | Jan 11, 2020 | FAILURE TO MAINTAIN BLDG NO CODE COMPLIANT MANNER. NOTED: OBSERVED AT | Jul 28, 2021 | Defaulted (did not respond) | $50.00 |
| 1629448 | Nov 27, 2019 | REMOVED OR DEFACED A WRITTEN POSTED VACATE ORDER #B190 ISSUED 04/18/19 | Jul 28, 2021 | Defaulted (did not respond) | $101.00 |
| 1622484 | Nov 27, 2019 | BC907.2.8/FAILURE TO PROVIDE THE REQUIRED FIRE ALARM SYSTEM FOR TRANSI | May 10, 2021 | Found in violation | $20.00 |
| 1622485 | Nov 27, 2019 | FAILURE TO OBEY A VACATE ORDER FROM THE COMMISSIONER PER 28-207.4 NOTE | May 10, 2021 | Found in violation | $39.00 |
| 1622481 | Nov 27, 2019 | PERMANENT DWELLING USED CONVERTED FOR OTHER THAN PERMANENT RESIDENTIAL | May 10, 2021 | Found in violation | $10.00 |
| 1622483 | Nov 27, 2019 | FAILURE TO PROVIDE A SYSTEM OF AUTOMATIC SPRINKLER WHERE REQUIRED PER | May 10, 2021 | Found in violation | $10.00 |
| 701551 | Nov 22, 2019 | FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER: AT TIME OF INSPECTI | Aug 13, 2021 | Defaulted (did not respond) | $101.00 |
| 1270832 | Nov 18, 2019 | FAILURE TO COMPLY WITH THE COMMISSIONERS ORDER CONATINED IN SUMMONS/VI | Jul 24, 2020 | Defaulted (did not respond) | $3,125.00 |
| 1384896 | Oct 10, 2019 | FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER. AT FRONT OF B | Nov 5, 2020 | Defaulted (did not respond) | $6,250.00 |
| 1758045 | Sep 23, 2019 | FAILURE TO COMPLY WITH THE COMMISSIONERS ORDER CONTAINED IN SUMMONS/VI | Jan 29, 2020 | Defaulted (did not respond) | $3,125.00 |
| 993376 | Aug 10, 2019 | FAILURE TO MAINTAIN AN UNOBSTRUCTED EXIT PASSAGEWAY. NOTED: REAR CELLA | Nov 5, 2021 | Defaulted (did not respond) | $12,500.00 |
| 1757099 | Jul 15, 2019 | FAILURE TO COMPLY WITH THE COMMISSIONERS ORDER CONTAIEND IN SUMMONS/VI | Jul 18, 2019 | Defaulted (did not respond) | $3,125.00 |
| 1629037 | Jun 7, 2019 | FAILURE TO COMPLY WITH THE COMMISSIONERS ORDER CONTAINED IN SUMMONS/VI | Sep 23, 2019 | Defaulted (did not respond) | $3,125.00 |
| 1488451 | May 24, 2019 | REMOVED OR DEFACED A WRITTEN POSTED VACATE ORDER. NOTED: VACATE # | Sep 9, 2019 | Defaulted (did not respond) | $25,000.00 |
| 1488431 | May 22, 2019 | PERMNAENT DWELLING USED/CONVERTED FOR OTHER THAN PERMANENT RESIDENTIAL | Sep 9, 2019 | Defaulted (did not respond) | $70,000.00 |
| 1488439 | May 22, 2019 | FAILURE TO MAINTAIN BUILDING IN CODE COMPLAINT MANNER LACK OF REQUIRED | Sep 9, 2019 | Defaulted (did not respond) | $25,000.00 |
| 1488447 | May 22, 2019 | 907.2.8;FAILURE TO PROVIDE FIRE ALARM SYSTEM FOR TRANSIENT USE AT FIRS | Sep 9, 2019 | Defaulted (did not respond) | $25,000.00 |
| 1488427 | May 22, 2019 | REMOVED OR DEFACED A WRITTEN POSTED VACATE ORDER.VACATE #B190119 WAS I | Sep 9, 2019 | Defaulted (did not respond) | $25,000.00 |
| 1488448 | May 22, 2019 | FAILURE TO MAINTAIN BUILDING IN CODE COMPLAINT MANNER LACK OF A SYSTEM | Sep 9, 2019 | Defaulted (did not respond) | $12,500.00 |
| 1373107 | May 4, 2019 | FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.NOTE:THE BUILD- | Aug 19, 2019 | Defaulted (did not respond) | $25,000.00 |
| 1266263 | Apr 22, 2019 | FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.FAILURE TO PROVI | Aug 5, 2019 | Defaulted (did not respond) | $25,000.00 |
| 1266144 | Apr 22, 2019 | PERMANENT DWELLING USED/CONVERTED FOR OTHER THAN PERMANENT RESIDENTIAL | Aug 5, 2019 | Defaulted (did not respond) | $70,000.00 |
| 1266199 | Apr 22, 2019 | FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.LACK OF SYSTEM O | Aug 5, 2019 | Defaulted (did not respond) | $12,500.00 |
| 1266271 | Apr 22, 2019 | REMOVED OR DEFACED A WRITTEN POSTED VACATE ORDER.NOTED:REMOVED VACATE | Aug 5, 2019 | Defaulted (did not respond) | $25,000.00 |
| 1266189 | Apr 22, 2019 | BC907.2.8 FAILURE TO PROVIDE FIRE ALARM SYSTEM FOR TRANSIENT USE.(CLAS | Aug 5, 2019 | Defaulted (did not respond) | $25,000.00 |
| 1558568 | Apr 18, 2019 | PERMANENT DWELING USED/CONVERTED FOR OTHER THAN PERMANENT -RESINDETIAL | Oct 24, 2019 | Found in violation | $6,000.00 |
| 1558572 | Apr 18, 2019 | WORK WITHOUT A PERMIT.WORK NOTED.AT CELLAR LEVEL ERECTED FULL HEIGHT P | Feb 7, 2020 | Found in violation | $2,500.00 |
| 1558569 | Apr 18, 2019 | FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANCE MANNER.FAILURE TO COMP | Oct 24, 2019 | Found in violation | $1,250.00 |
| 1190601 | Apr 18, 2019 | DWELLING CONVERTED,MAINTAINED OR OCCUPIED WITH 3 OR MORE ADDITIONAL DW | Oct 24, 2019 | Found in violation | $60,000.00 |
| 1558576 | Apr 18, 2019 | REMOVED OR DEFACED A WRITTEN POSTED VACATE ORDER.NOTED:REMOVED VACATE | Oct 24, 2019 | Found in violation | $2,500.00 |
| 1558570 | Apr 18, 2019 | FAILURE TO PROVIDE UNOBSTRUCTED EXIT PASSAGEWAY.NOTED:AT 2ND FLOOR BED | Oct 24, 2019 | Found in violation | $1,250.00 |
| 1190067 | Apr 18, 2019 | DWELLING CONVERTED,MAINTAINED OR OCCUPIED WITH 3 OR MORE ADDITIONAL DW | Oct 24, 2019 | Found in violation | $60,000.00 |
| 1190497 | Apr 18, 2019 | DWELLING CONVERTED,MAINTAINED OR OCCUPIED WITH 3 OR MORE ADDITIONAL DW | Oct 24, 2019 | Found in violation | $60,000.00 |
| 1190172 | Apr 18, 2019 | DWELLING CONVERTED,MAINTAINED OR OCCUPIED WITH 3 OR MORE ADDITIONAL DW | Oct 24, 2019 | Found in violation | $60,000.00 |
| 1190213 | Apr 18, 2019 | DWELLING CONVERTED,MAINTAINED OR OCCUPIED WITH 3 OR MORE ADDITIONAL DW | Oct 24, 2019 | Found in violation | $60,000.00 |
| 1625468 | Mar 26, 2019 | FAILURE TO COMPLY W/ THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIO | Oct 28, 2019 | Defaulted (did not respond) | $3,125.00 |
| 1623113 | Jan 24, 2019 | FAILURE TO COMPLY W/ THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIO | Jun 17, 2019 | Defaulted (did not respond) | $3,125.00 |
| 1621051 | Dec 10, 2018 | FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/V | Feb 7, 2020 | Defaulted (did not respond) | $3,125.00 |
| 1624951 | Nov 3, 2018 | FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN SUMMONS/VIO#35343949 | Feb 4, 2019 | Defaulted (did not respond) | $5,000.00 |
| 1064481 | Sep 20, 2018 | 28-210.1 RESIDENCE CONVERTED, MAINTAINED, OR OCCUPIED AS A DWELLING FO | Feb 7, 2020 | Found in violation | $1,250.00 |
| 1468714 | Sep 20, 2018 | WORK WITHOUT A PERMIT. NOTED: AT REAR, CELLAR DOOR LEADING TO YARD HAS | Dec 10, 2018 | Defaulted (did not respond) | $6,250.00 |
| 1057152 | Sep 20, 2018 | FAILURE TO MAINTAIN AN UNOBSTRUCTED EXIT PASSAGEWAY. NOTED:AT CELLAR L | Feb 7, 2020 | Found in violation | $1,250.00 |
| 777264 | Jun 1, 2018 | WORK WITHOUT A PERMIT.NOTED:AT TIME OF INSPECTION A SIDEWALK SHED INST | Dec 19, 2018 | Defaulted (did not respond) | $6,250.00 |
| 1452264 | Mar 27, 2018 | TEMPORARY CONSTRUCTION EQUIPMENT ON SITE.EXPIRED PERMIT.NOTE:AT TIME O | Oct 17, 2018 | Defaulted (did not respond) | $6,250.00 |
| 1588818 | Oct 20, 2016 | FAILURE TO MAINTAIN BLDG WALLS OR APPURTENANCES. NOTED: AT TIME OF INS | Mar 27, 2017 | Written off | — |
| 1583801 | Feb 10, 2013 | OCCUPANCY CONTRARY TO THAT ALLOWED BY C/O AND DOB RECORDS, BASEMENT DU | Jul 22, 2013 | Written off | — |
| 1141051 | May 18, 2006 | WORK W/O A PERMIT: WORK AS NOTED: AT A 4-STORIED BRICK FRAMED STRUCTUR | Jan 7, 2008 | Written off | — |
| 494779 | Mar 25, 2005 | FAILURE TO MAINTAIN BUILDING NOTE SECOND FLOOR CORRIDOR WOOD FLOOR IS | May 9, 2005 | Settled by stipulation | — |
| 294006 | Mar 16, 2005 | WORK W/OUT A PERMIT.WORK NOTED:THE ACCESS WAY TO THE ROOF SCUTTLE HAS | May 2, 2005 | Found in violation | — |
| 293993 | Mar 16, 2005 | EXIT PASSAGEWAY OR CORRIDOR:TOTAL OBSTRUCTION.NOTED:THE ACCESSWAY TO T | Aug 10, 2005 | Found in violation | — |
| 542580 | Jan 15, 1999 | WORK WITHOUT A PERMIT, WORK NOTED. REMOVAL ERECTION OF PARTITION AND | Mar 29, 1999 | Written off | — |
| 542595 | Jan 15, 1999 | FAILURE TO MAINTAIN DEFECT IS STAIRS FROM FIRST 1ST FL LOADING TO SECO | Mar 29, 1999 | Written off | — |
| 542583 | Jan 15, 1999 | FAILURE TO DO ADEQUATE HOUSEKEEPING DEMO DEBRIS AND OTHER GARAGE STORE | Mar 29, 1999 | Written off | — |