Open ViolationsA public record project
/

330 East 100 Street, Manhattan

11 open Class C — see them ↓$92,285.00 recorded as dueHPD registration valid
Export CSV
OverviewHealth scoreTimelineFinesOwner

330 East 100 Street at a glance

330 East 100 Street, Manhattan has 22 open city records on file, 11 of them Class C (immediately hazardous), and $92,285.00 recorded as due on OATH/ECB summonses. The most recent record is dated Jul 10, 2026.

Open Class C
11
Immediately hazardous — click to see them
Open Class B
11
Hazardous — click to see them
Open Class A
0
Non-hazardous — click to see them
Fines due
$92,285.00
Balance on OATH/ECB summonses
Permits on file
0
Construction permits filed with DOB
Last activity
Jul 10, 2026
DOB record

Health score for 330 East 100 Street

A composite of the public indicators below. How it is scored.

F
Health score · Aug 5, 2026
Scored from all 231 public records for this building
Open Class C violations
Immediately hazardous, uncertified
This building 11
Open Class B violations
Hazardous
This building 11
Heat & hot water records
Violations and complaints, last 24 months
This building 39
Unpaid penalties
OATH/ECB summonses with balance due
This building $92,285
Bedbug filings with infestations
Annual LL69 filings on record
This building 4
Tenant litigation
Open HP actions in Housing Court
This building 0
Active vacate order
HPD or FDNY order to vacate, still in effect
This building No

Record timeline for 330 East 100 Street

231 records on file, every agency interleaved. Class A, B and C are HPD’s hazard tiers: C is immediately hazardous, A and B explained here.

Download this timeline (CSV) →

OATH / ECB summonses & fines at 330 East 100 Street

$92,285.00 is recorded as due across the 22 summonses below, out of $92,285.00 in penalties imposed. Balances are as the city publishes them; a settlement or write-off that never reached the dataset will not show here. New to these? How an OATH summons becomes a penalty, explained.

OATH and ECB summonses for 330 East 100 Street
1834984Jul 9, 2026AT TIME OF INSPECTION NEWLY INSTALLED GAS PIPING AND FITTINGS WERE OBSSep 17, 2026Pending$2,500.00
1126025Jun 17, 2026VF... R T S... ELEVATOR IN BUILDING OUT OF SERVICE , UPON INSPECTION TAug 27, 2026Pending$1,250.00
1804161Jun 17, 2026ATOI OBSERVED GAS LINES RUNNING THROUGH APT 2A. NOT PROPERLY SECURED. Aug 27, 2026Pending$2,500.00
1680198Jun 17, 2026FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. ATOI I OBSERVEDAug 27, 2026Pending$2,500.00
1804105Jun 17, 2026UNAPPROVED/UNSAFE/UNSUITABLE ELECTRICAL EQUIPMENT, APPARATUS, MATERIALAug 27, 2026Pending$1,600.00
1804102Jun 17, 2026ATOI OBSERVED IN BASMENT NEW GAS LINES FEEDING 24 APTS. NO PERMIT ON FAug 27, 2026Pending$2,500.00
1680045Jun 17, 2026WORK WITHOUT A PERMIT. ATOI I I ALSO OBSERVED AT EXPOSURE 3 WINDOW WASAug 27, 2026Pending$2,500.00
1804181May 28, 2026AT TIME OF INSPECTION OBSERVED TO CONTINUATION OF THE DEMO WORK AN ALTAug 6, 2026Pending$10,000.00
1804182May 28, 2026ATOI, IT WAS OBSERVED THAT PLUMBING WORK IS ONGOING INSIDE THE UNIT 6CAug 6, 2026Pending$2,500.00
1830407Apr 20, 2026DURING THE INSPECTION, ALTERATION WORK WAS OBSERVED INSIDE UNIT 6C ON Jun 25, 2026Defaulted (did not respond)$2,530.00
1830416Apr 20, 2026DURING THE INSPECTION, DEMOLITION ACTIVITIES WERE OBSERVED INSIDE UNITJun 25, 2026Defaulted (did not respond)$2,530.00
1800666Aug 14, 2024OBSERVED WINDOW A/C UNITS ARE ERECTED INADEQUATE MANNER ON VARIOUS FLOOct 24, 2024Defaulted (did not respond)$6,250.00
852455Jun 11, 2024ATOI ON A 6 STORY BLDG, OBSERVED ELECTRICAL WORK WAS PERFORM THROUGHOUAug 22, 2024Defaulted (did not respond)$6,250.00
853068Jun 11, 2024ATOI OF A 6-STORY BUILDING IT WAS OBSERVED ATEXPOSURE:#1,6TH FL PARAPEAug 22, 2024Defaulted (did not respond)$3,125.00
1796684Jun 11, 2024ATOI ON A 6 STORY BLDG. PLUMBING WORK/WAS DONE THROUGHOUT THE ENTIRE PAug 29, 2024Defaulted (did not respond)$6,250.00
851988Jun 11, 2024ATOI ON A 6 STORY BLDG,GENERAL CONSTRUCTION /OR ALTERATION WORK AT APTAug 22, 2024Defaulted (did not respond)$6,250.00
851398Jun 11, 2024ATOI ON A 6 STORY BLDG. PLUMBING WORK/WAS DONE THROUGHOUT THE ENTIRE PAug 22, 2024Defaulted (did not respond)$6,250.00
851930Jun 11, 2024ATOI ON A 6 STORY BLDG,GENERAL CONSTRUCTION /OR ALTERATION WORK AT APTAug 22, 2024Defaulted (did not respond)$6,250.00
852476Apr 18, 2024ATOI ON A 6 STORY BLDG, OBSERVED ELECTRICAL WORK WAS PERFORM THROUGHOUAug 22, 2024Defaulted (did not respond)$6,250.00
1795731Apr 18, 2024ATOI ON A 6 STORY BLDG,GENERAL CONSTRUCTION /OR ALTERATION WORK AT APTAug 22, 2024Defaulted (did not respond)$6,250.00
1813665Jan 31, 2024OBSERVED ON FIRST FLOOR OPEN WASTE LINE FOR APARTMENT 2A WHICH CONTRARFeb 6, 2025Defaulted (did not respond)$3,125.00
1162144Jul 3, 2023FAILURE TO MAINTAIN BUILDING CODE COMPLIANT. NOTED: AT THE CENTER COURSep 7, 2023Defaulted (did not respond)$3,125.00