Provide Ready Access To Buildings Heating System Door Locked
HPD order 672 · cites NYC Housing Maintenance Code § 27-2033 · written Mar 21, 1983 – Aug 6, 2026
HPD has written 106,276 violations under order 672, "Provide Ready Access To Buildings Heating System Door Locked", citing NYC Housing Maintenance Code § 27-2033. 26,219 are open right now, 26,142 of them past the legal deadline on the notice.
Open now
26,219
Open past deadline
26,142
Closed
80,057
All time
106,276
Class C (immediately hazardous)
106,276
How order 672 is actually enforced
4,161 notices (3.9%) sit at not complied with: the deadline passed and HPD found the condition unrepaired.
1,064 certifications of repair were rejected by HPD. 331 of those are recorded as false certification: the owner certified a repair that inspection did not confirm.
1,597 repairs were certified after the deadline.
7,748 notices (7.3%) are reissues: the violation was written, not fixed, and written again.
Order 672is HPD’s standard wording for one kind of condition. The legal duty it enforces is NYC Housing Maintenance Code § 27-2033, "Access to boiler room". The section page carries the statute text, the measured cure times and the full enforcement record.