| 1154230 | Mar 14, 2016 | WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS (DESIGN DRAWI | May 6, 2016 | Settled by stipulation | — |
| 159850 | Feb 2, 2016 | WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND/OR APPROV | Mar 18, 2016 | Found in violation | — |
| 159843 | Feb 2, 2016 | FAILURE TO SAFEGUARD ALL PERSONS AND PROPERTY AFFECTED BY CONSTRUCTION | Mar 18, 2016 | Found in violation | — |
| 159885 | Feb 2, 2016 | 3307.2.2 TEMPORARY PUBLIC WALKWAYS IN STREET NOTE:AT TIME OF INSPECTIO | Mar 18, 2016 | Found in violation | — |
| 835032 | Sep 22, 2015 | HOLES/OPENINGS NOT COVERED UPON INSPECTION AS NOTED AT ACTIVE CONSTRUC | Nov 6, 2015 | Found in violation | — |
| 1078632 | Sep 22, 2015 | ADEQUATE MEANS OF EGRESS.UPON INSPECTION AS NOTED @ ACTIVE CONSTRUCTIO | Dec 18, 2015 | Found in violation | — |
| 834435 | Sep 22, 2015 | SIDEWALK SHED DOES NOT MEET CODE SPECIFICATIONS."PARTIAL STOP WORK ORD | Nov 6, 2015 | Found in violation | — |
| 834307 | Sep 22, 2015 | FAILURE TO PROTECT ADJOINING PROPERTY "PARTIAL STOP WORK ORDER" ON ALL | Nov 6, 2015 | Found in violation | — |
| 834473 | Sep 22, 2015 | FAILURE TO INSTITUTE/MAINTAIN SAFETY EQUIPMENT MEASURES OR TEMPORARY C | Nov 6, 2015 | Found in violation | — |
| 1126780 | Sep 22, 2015 | MATERIALS STORED/STACKED WITHIN 10FT FROM BUILDING PERIMETER."PARTIAL | Nov 6, 2015 | Found in violation | — |
| 834487 | Sep 22, 2015 | FAILURE TO INSTITUTE/MAINTAIN SAFETY EQUIPMENT MEASURES OR TEMPORARY C | Nov 6, 2015 | Found in violation | — |
| 835038 | Sep 22, 2015 | REQUIRED (LIGHTED) STAIRWAY & TEMPORARY LIGHTING.UPON INSPECTION AS N0 | Nov 6, 2015 | Found in violation | — |
| 834464 | Sep 22, 2015 | FAILURE TO PROVIDE DESIGN DRAWING "PARTIAL STOP WORK ORDER" ON ALL TEM | Nov 6, 2015 | Found in violation | — |
| 1127389 | Sep 22, 2015 | FAILURE TO PROVIDE FENCE AS REQUIRED. "PARTIAL STOP WORK ORDER" ON ALL | Nov 6, 2015 | Found in violation | — |
| 834529 | Sep 22, 2015 | VERTICAL SAFETY NETTING NOT PROVIDED UPON INSPECTION AS NOTED AT ACTIV | Nov 6, 2015 | Found in violation | — |
| 585107 | Dec 2, 2014 | FAILURE TO PROVIDE SITE SAFETY PLAN & PROGRAM."FULL STOP WORK ORDER"IS | Feb 5, 2015 | Found in violation | — |
| 1079722 | Jul 9, 2014 | FAILURE TO NOTIFY THE DOB'S BEFORE COMMENCEMENT OF DEMOLITION - UPON I | Aug 29, 2014 | Found in violation | — |
| 338087 | Jul 9, 2014 | SEC. 3307.1 JOB SITE FENCE NOT PAINTED AS PER CODE - UPON INSPECTION O | Sep 3, 2014 | Found in violation | — |
| 62081 | Mar 25, 2004 | WORK WITHOUT A PERMIT WORK NOTED SECOND AND THRID FLOORS ERECTED FULL | Sep 24, 2004 | Written off | — |
| 995834 | Mar 25, 2004 | RESIDENCE ALTERED FOR OCCUPANCY AS A DWELLING FOR MORE THAN THE LEGALL | Sep 24, 2004 | Written off | — |
| 56699 | Sep 9, 2003 | RESIDENCE ALTERED FOR OCCUPANCY AS A DWELLING FOR MORE THAN THE LEGALL | Jul 23, 2004 | Written off | — |
| 995828 | Sep 9, 2003 | WORK W/O PERMITS:CONSTRUCTED PARTITION THRUOUT 2ND AND 3RD FLR.TO CREA | Jul 23, 2004 | Written off | — |