| 1809201 | Jun 3, 2025 | CEASE USE ITEM: INOPERATIVE ZONE LOCK RESTRICTOR. CLASS 2: REPALCE WOR | Aug 15, 2025 | DEFAULT | — |
| 1730781 | Sep 9, 2024 | 28-323.8 AND RCNY 103-13(5). FAILURE TO SECURE PUBLIC SAFETY AND/OR MA | Feb 7, 2025 | IN VIOLATION | — |
| 1778008 | Aug 16, 2024 | AT TIME OF INSPECTION OBSERVED SEVERAL STEEL BEAMS MISSING FIRE PROOF | Jan 5, 2026 | IN VIOLATION | — |
| 1216123 | Jan 17, 2023 | NEW BUILDING ERECTED AND OCCUPIED WITHOUT A VALID CFO. NEW 13 STORY BU | Aug 15, 2023 | IN VIOLATION | — |
| 1258536 | Feb 29, 2020 | FAILURE TO INSTITUTE/MAINTAIN SAFETY EQUIPMENT MEASURES OR TEMPORARY C | Apr 17, 2020 | IN VIOLATION | — |
| 1258549 | Feb 29, 2020 | FAILURE TO MAINTAIN ADEQUATE HOUSEKEEPING PER SECTION REQUIREMENT.AT T | Apr 17, 2020 | IN VIOLATION | — |
| 1483628 | Nov 29, 2019 | WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND/OR AMENDM | Mar 5, 2020 | IN VIOLATION | — |
| 1436931 | Nov 29, 2019 | WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND/OR AMENDM | Jan 17, 2020 | IN VIOLATION | — |
| 1436936 | Nov 29, 2019 | 3301.7 LOGS. NOTE:AT TIME OF INSPECTION AT A 13 STORY BUILDING,I OBSER | Jan 17, 2020 | IN VIOLATION | — |
| 1371893 | Oct 9, 2019 | FAILURE TO INSTITUTE AND MAINTAIN SAFETY MEASURES FOR UNLOADING OPERTI | Dec 20, 2019 | IN VIOLATION | — |
| 1371937 | Oct 9, 2019 | NO GUARD RAILS AT TIME OF INSPECTION RESPONDING TO AN INCIDENT WHER A | Dec 20, 2019 | IN VIOLATION | — |
| 1370400 | Sep 19, 2019 | FAILURE TO NOTIFY DEPT OF AN INCIDENT THAT RESULTED IN A FATALITY OF I | Dec 20, 2019 | IN VIOLATION | — |
| 1371873 | Jul 29, 2019 | FAILED TO NOTIFY THE DEPARTMENT OF AN INCIDENT THAT RESULTED IN A FATA | Dec 20, 2019 | IN VIOLATION | — |
| 1365134 | Jun 19, 2019 | FAILURE TO SAFEGUARD ALL PERONS & PROPERTY AFFECTED BY CONSTRUCTION OP | Aug 16, 2019 | IN VIOLATION | — |
| 1365144 | Jun 19, 2019 | SEC. 3308.6.1.4 FAILURE TO MAINTAIN SUPPORTED SCAFFOLD ALTERNATIVE AS | Aug 16, 2019 | IN VIOLATION | — |
| 1463870 | Jun 5, 2019 | LIFT DIRECTOR FAILED TO PERFORM DUTIES AS REQUIRED MOBILE CRANE CN# 79 | Jan 24, 2020 | IN VIOLATION | — |
| 1134645 | Apr 16, 2019 | FAILURE TO MAINTAIN SAFETY OPERATION @THE TIME OF INSPECTION AS PER SI | Jun 28, 2019 | IN VIOLATION | — |
| 1377859 | Apr 1, 2019 | FAILURE TO MAINTAIN ADEQUATE HOUSEKEEPING PER SECTION REQUIREMENTS.@TI | May 24, 2019 | IN VIOLATION | — |
| 1377862 | Apr 1, 2019 | 3301.2 NO UNCAPPED REBARS.@ TIME OF INSP,I OBSERVED AN ACTIVE CONST S | May 17, 2019 | IN VIOLATION | — |
| 1361287 | Jan 9, 2019 | FAILURE TO SAFEGUARD PERSON AFFECTED BY CONSTRUCTION OPERATION OF NEW | Mar 1, 2019 | IN VIOLATION | — |
| 1314626 | Jul 3, 2018 | FAILURE TO FILE EVIDENCE OF RENEW WORKERS DISABILITY BENEFITS INSURANC | Aug 17, 2018 | IN VIOLATION | — |
| 1325140 | Jun 15, 2018 | BC3301.1.1 RESPONSIBILITY FOR SAFETY. AT TIME OF INSPECTION, FOLLOW-UP | Aug 10, 2018 | IN VIOLATION | — |
| 954782 | Apr 13, 2018 | FAILURE TO SAFEGUARD ALL PERSONS AND PROPERTY AFFECTED BY CONSTRUCTION | Sep 28, 2018 | IN VIOLATION | — |
| 954809 | Apr 13, 2018 | BC3310.6.FAILURE TO DESIGNATE SITE SAFETY MANNER.AT TIME OF INSPECTION | Sep 28, 2018 | IN VIOLATION | — |
| 954794 | Apr 13, 2018 | FAILURE TO NOTIFY IMMEDIATELY THE DEPARTMENT OF AN ACCIDENT AT CONSTRU | Sep 28, 2018 | IN VIOLATION | — |
| 1277720 | Mar 29, 2018 | SEC: 3307.2.2. TEMPORARY WALKWAY, NOTE @ TIME IF INSP OF A PROPOSED 13 | May 18, 2018 | IN VIOLATION | — |