| 1543744 | Jun 9, 2020 | NO SUPERINTENDENT.AT THE TIME OF MY INSPECTION AT A 4STORY NEW BUILDIN | Aug 25, 2020 | DEFAULT | $12,500.00 |
| 1518349 | Mar 18, 2020 | FAILED TO ENSURE WORKER RECEIVE SITE SAFETY ORIENTATION NOTE: @THE TIM | Sep 8, 2020 | DEFAULT | $12,500.00 |
| 1466640 | Oct 25, 2019 | BC 3301.7 DOCUMENT TO BE KEPT ON SITE. AT TIME ON AN ACTIVE JOB SITE O | Jan 7, 2020 | DEFAULT | $3,125.00 |
| 1466633 | Oct 25, 2019 | FAILURE TO MAINTAIN ADEQUATE HOUSEKEEPING. AT TIME OF MY INSPECTION OF | Jan 7, 2020 | DEFAULT | $6,250.00 |
| 1466635 | Oct 25, 2019 | BC-3301.12.3 FAILURE TO MAINTAIN RECORD OF PRESHIFT SAFETY MEETING FOR | Jan 7, 2020 | DEFAULT | $6,250.00 |
| 1466631 | Oct 25, 2019 | BC-3309.10 FAILURE TO PROTECT ADJACENT PROPERTY/INADEQUATE ROOF PROTEC | Jan 7, 2020 | DEFAULT | $6,250.00 |
| 1466632 | Oct 25, 2019 | 2113.1.6.1 RESPONSIBILITY OWNER OF TALLER BUILDING. AT TIME OF INSPECT | Jan 7, 2020 | DEFAULT | $6,250.00 |
| 1075612 | Sep 16, 2019 | FAILURE TO MAINTAIN ADEQUATE HOUSEKEEPING.NOTE:AT TIME OF INSPECTIO I | Jan 28, 2020 | IN VIOLATION | $2,500.00 |
| 163473 | Jun 24, 2019 | FAILURE TO SAFEGUARD ALL PERSONS AND PROPERTY AFFECTED BY CONSTRUCTION | Sep 3, 2019 | DEFAULT | $5,000.00 |
| 1505829 | Jun 24, 2019 | FAILURE TO DESIGNATE/OR HAVE A CONSTRUCTION SUPERINTENDENT PRESENT AT | Sep 3, 2019 | DEFAULT | $12,500.00 |
| 1452961 | Mar 26, 2019 | UNLAWFULLY CONTINUED WORK WHILE ON NOTICE OF A STOP WORK ORDER.AT TIME | Nov 12, 2019 | IN VIOLATION | $5,000.00 |
| 1453033 | Mar 25, 2019 | BC3301.2.FAILURE TO MAINTAIN/INSTITUTE FALL PROTECTION AT TIME OF INSP | Nov 12, 2019 | IN VIOLATION | $2,500.00 |
| 1452963 | Mar 25, 2019 | BC3309.10.INADEQUATE ROOF PROTECTION.AT TIME OF INSPECTION ON A 4 STOR | Nov 12, 2019 | IN VIOLATION | $2,500.00 |
| 1453029 | Mar 25, 2019 | FAILURE TO COMPLY WITH MANUFACTURERS SPECIFICATIONS AT TIME OF INSPECT | Nov 12, 2019 | IN VIOLATION | $2,500.00 |
| 1536876 | Nov 8, 2018 | WORK DOES NOT CONFORM TO APPROVED PLANS/DESIGN DRAWINGS. AT TIME OF IN | Feb 25, 2020 | IN VIOLATION | $2,500.00 |
| 1536878 | Nov 8, 2018 | BC3304.7 INADEQUATE MEANS OF EGRESS. AT TIME OF INSPECTION ON AN ACTIV | Feb 25, 2020 | IN VIOLATION | $2,500.00 |
| 1536877 | Nov 8, 2018 | BC3305.2.2 FIELD CONNECTIONS/STEEL FABRICATION. AT TIME OF INSPECTION | Feb 25, 2020 | IN VIOLATION | $1,250.00 |
| 1536880 | Nov 8, 2018 | BC3301.7 DOCUMENTS TO BE KEPT ONSITE. AT TIME OF INSPECTION ON AN ACTI | Feb 25, 2020 | IN VIOLATION | $2,500.00 |
| 1536879 | Nov 8, 2018 | INADEQUATE GUARDRAILS. AT TIME OF INSPECTION ON AN ACTIVE JOBSITE OF A | Feb 25, 2020 | IN VIOLATION | $5,000.00 |
| 1536881 | Nov 8, 2018 | FAILURE TO PROVIDE SAFETY MEASURES AT CONSTRUCTION SITE (SIGNS). AT TI | Feb 25, 2020 | IN VIOLATION | $2,500.00 |
| 1436278 | Aug 21, 2018 | STANDING RAIN WATER ON SITE. @ TIME OF INSP OF 4 STORIES BLDG, OBSERVE | Oct 9, 2018 | IN VIOLATION | $2,500.00 |
| 1436277 | Aug 21, 2018 | NO FDNY PERMIT ON SITE FOR GENERATOR, @ TIME OF INSP OF THE 4 STORIES | Oct 9, 2018 | IN VIOLATION | $2,500.00 |
| 1407285 | Aug 10, 2018 | 1RCNY3319-01(G)(7)(I)MICHAEL LOMBARDO PE#090287 FAILED TO SUBMIT REQUI | Aug 13, 2019 | STIPULATION/IN-VIO | — |
| 1321279 | Jul 5, 2018 | FAILURE TO INSTITUTE/MAINTAIN SAFETY MEASURE AT JOBSITE-HANDRAILS. AT | Oct 2, 2018 | IN VIOLATION | — |
| 1472420 | Jul 5, 2018 | FAILURE TO INSTITUTE/MAINTAIN SAFETY MEASURES AT JOBSITE-GUARDRAILS. A | Dec 18, 2018 | IN VIOLATION | $2,500.00 |
| 1810849 | Jul 5, 2017 | BC3309.6 FAILURE TO MONITOR ADJOINING STRUCTURE FOR MOVEMENT IN ALL D | Nov 14, 2017 | WRITTEN OFF | — |