| 1652651 | Apr 26, 2023 | 23 STORY NB OBSERVED APPROXIMATELY 20 LINEAR FEET OF SWS REMOVED FROM | Jul 25, 2023 | ADMIT/IN-VIO | — |
| 1618722 | Feb 2, 2023 | NEW BUILDING OCCUPIED W/O A VALID C OF O, NOTED AT 10TH FLOOR APT 10 D | Apr 11, 2023 | ADMIT/IN-VIO | — |
| 1580155 | Nov 24, 2021 | BC3314.4.8 FAILURE TO MAINTAIN SCAFFOLD AS PER CODE SUBSECTION.AT TIME | Feb 22, 2022 | IN VIOLATION | — |
| 1560771 | Nov 24, 2021 | WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND/OR APPROV | Feb 22, 2022 | IN VIOLATION | — |
| 1618475 | Aug 31, 2021 | FAILURE TO MAINTAIN ADEQUATE HOUSEKEEPING AS PER SECTION REQUIREMENTS. | Nov 30, 2021 | IN VIOLATION | — |
| 1513798 | Jul 21, 2021 | MIRROR BLINDSPOT MISSING.AT THE TIME OF INSPECTION PROPOSED 23 STORY B | Oct 12, 2021 | IN VIOLATION | — |
| 1578767 | Jul 7, 2021 | BC33086-MISSING HORIZONTAL SAFETY NETTING.NOTE:AT THE TIME OF COMPLAIN | Feb 22, 2022 | IN VIOLATION | — |
| 1578779 | Jul 7, 2021 | WORK CONTRARY TO SITE SAFETY PLAN.NOTE:AT THE TIME OF INSPECITON OBSER | Feb 22, 2022 | IN VIOLATION | — |
| 1578765 | Jul 7, 2021 | INADEQUATE HOUSEKEEPING.NOTE:AT THE TIME OF COMPLAINT TYPE INSPECTION, | Feb 22, 2022 | IN VIOLATION | — |
| 1515103 | Jul 7, 2021 | FAILURE TO SAFEGUARD PUBLIC AND PROPERTY.NOTE:AT THE TIME OF COMPLAINT | Sep 28, 2021 | IN VIOLATION | — |
| 1423954 | Mar 2, 2020 | BC 3307.2 FAILURE TO COMPLY W/ DOT STIPULATIONS. AT TIME OF INSPECTION | Feb 23, 2021 | IN VIOLATION | — |
| 1577594 | Mar 2, 2020 | WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS-FENCE DETAIL | Feb 23, 2021 | IN VIOLATION | — |
| 732822 | Feb 29, 2020 | BC 3301.2 FENCE NOT MAINTAINED IN AN UPRIGHT POSITION IN RESPONSE TO A | Jun 15, 2021 | IN VIOLATION | — |
| 732975 | Feb 29, 2020 | FAILURE TO FULLY ENCLOSE ENTIRE OPERATION(EXPOSURE#2)IN RESPONSE TO AB | Jun 15, 2021 | IN VIOLATION | — |
| 732487 | Feb 29, 2020 | BC 3307.2 FAILURE TO COMPLY TO DOT PERMITS.AT TIME OF INSPECTION ON PR | Jun 15, 2021 | IN VIOLATION | — |
| 734643 | Feb 21, 2020 | 3307.2.1 FAILURE TO COMPLY W/ DOT REGULATIONS. AT TIME OF INSPECTION O | Jan 5, 2021 | DEFAULT | — |
| 1549256 | Feb 21, 2020 | WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND/OR APPROV | Jun 29, 2021 | IN VIOLATION | — |
| 1455120 | Nov 7, 2019 | 3301.7 DESIGN DRAWING NOTE: @THE TIME OF MY INSPECTION OF ACTIVE JOB-S | Jan 22, 2020 | IN VIOLATION | — |
| 1466076 | Oct 15, 2019 | BC3304.4.4/GUARDRAIL SYSTEM.AT TIME OF INSPECTION ON A PROPOSD 24 STOR | Dec 31, 2019 | IN VIOLATION | — |
| 1466074 | Oct 15, 2019 | FAILURE TO PROVIDE PROTECTION AT SIDES OF EXCAVATION AT TIME OF INSPEC | Dec 31, 2019 | IN VIOLATION | — |
| 1466075 | Oct 15, 2019 | BC3304.4.5/PLACING OF SOIL OR FOUNDATION WORK EQUIPMENT EXCAVATED MATE | Dec 31, 2019 | IN VIOLATION | — |