| 955684 | Apr 4, 2022 | WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND/OR APPROV | Aug 24, 2022 | ADMIT/IN-VIO | — |
| 1579871 | Nov 9, 2021 | CONSTRUCTION SUPERINTENDENT FAILED TO IMMEDIATELY NOTIFY THE DEPARTMEN | Mar 23, 2022 | ADMIT/IN-VIO | — |
| 1605871 | Nov 9, 2021 | BC3301135-PERMIT HOLDER FIALED TO NOTIFY THE DEPARTMENT WONT ALTERNTE | Aug 9, 2022 | IN VIOLATION | — |
| 423688 | Aug 19, 2021 | BC21046-FAILURE TO PROVIDE MASONRY CMU BLOCK WALL CONSTRUCTION RACING | Jan 26, 2022 | IN VIOLATION | — |
| 1323497 | Aug 4, 2021 | CONNOLLY AND SON WAS USING ARTICULATING BOOM CRANE(LIC#18262SM/24/7 LI | Apr 4, 2024 | IN VIOLATION | — |
| 1458579 | Aug 4, 2021 | OPERATING ARTICULATING BOOM CRANE OUT OF ITS EXEMPTION TO HOIST AND SE | Apr 4, 2024 | IN VIOLATION | — |
| 1323545 | Aug 4, 2021 | PAUL ANTHONY FITZPATRICK (NYS -DL#182 027 218 CLASS B)WAS OPERATING A | Apr 4, 2024 | IN VIOLATION | — |
| 1458849 | Aug 4, 2021 | CRANE USER FAILED TO NOTIFY THE DEPARTMENT PROPERLY OF THE CRANES ARRI | Apr 4, 2024 | IN VIOLATION | — |
| 1458443 | Aug 4, 2021 | OPERATING A ARTICULATING BOOM CRANE(NYS LIC PL#18262SM-24/7 LIFTING IN | Apr 4, 2024 | IN VIOLATION | — |
| 1621451 | Aug 4, 2021 | CRANE USER VALLEY DESIGNS DID NOT DESIGNATE A LIFT DIRECTOR,NO LIFT DI | Apr 7, 2022 | IN VIOLATION | — |
| 1371157 | Aug 4, 2021 | USING A CRANE TO HOIST AND SET IN PLACE LINTELS WITHOUT A CERTIFICATE | Apr 7, 2022 | IN VIOLATION | — |
| 914293 | Jul 16, 2021 | FAILURE TO INSTITUTE/MAINTAIN SAFETY EQUIPMENT MEASURES OR TEMP CONST | Nov 24, 2021 | IN VIOLATION | — |
| 1532683 | Jul 16, 2021 | 3301.2 OBSTRUCTED MEANS OF EGRESS.NOTE:ATOI OF 9STYNB,CURRENTLY@2FL LE | Nov 24, 2021 | IN VIOLATION | — |
| 595932 | Jul 6, 2021 | WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND/OR APPROV | Dec 20, 2021 | IN VIOLATION | — |
| 1598449 | Jun 8, 2021 | GUARDRAILS MISSING AT THE TIME OF INSPECTION OF 9 STORY PROPOSED NEW | Oct 20, 2021 | IN VIOLATION | — |
| 1521534 | Nov 23, 2020 | 3304.4.4 FAILURE TO PROVIDE 3'6" GUARDRAILS SYSTEM OR SOLID ENCLOSURE | Apr 7, 2021 | IN VIOLATION | — |
| 966293 | Nov 23, 2020 | CONSTRUCTION SUPERINTENDENT FAIL TO PERFORM DUTIES AS PER RULE.AT TIME | Jun 27, 2022 | IN VIOLATION | — |
| 959903 | Nov 23, 2020 | SOE WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND/OR AP | Apr 7, 2021 | IN VIOLATION | — |
| 1130655 | Nov 20, 2020 | SEC. 3304.7 FAILURE TO PROVIDE ONE SAFE MEANS OF EGRESS. AT THE TIME O | Apr 28, 2021 | IN VIOLATION | — |
| 1035374 | Nov 12, 2020 | WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND OR APPOVE | Apr 21, 2021 | IN VIOLATION | — |