| 1524458 | Dec 21, 2020 | 3307.6.4.5 SEAL.NOTE:AT TIME OF INSPECTION OF AN 11 STORY BUILDING,I O | May 5, 2021 | IN VIOLATION | — |
| 1552520 | Oct 14, 2020 | UNLAWFULLY CONTINUED WORK WHILE ON NOTICE OF A STOP WORK ORDER. AT THE | Jul 16, 2021 | IN VIOLATION | — |
| 1559009 | Sep 24, 2020 | FAILURE TO INSTITUTE & MAINTAIN SAFETY EQUIPMENT MEASURES & TEMPORARY | Jun 28, 2021 | IN VIOLATION | — |
| 1559014 | Sep 24, 2020 | SEC. 3308.5 FAILURE TO INSTALL OR MAINTAINED VERTICAL SAFETY NETTING S | Jun 28, 2021 | IN VIOLATION | — |
| 995588 | Aug 8, 2020 | FAILURE TO NOTIFY DEPARTMENT PRIOR TO INSTALLATION OR REMOVAL OF SUSPE | Feb 8, 2021 | IN VIOLATION | — |
| 1521102 | Aug 8, 2020 | FAILURE TO INSTITUTE AND MAINTAIN SAFETY EQUIPMENT MEASURES AND TEMPOR | Feb 8, 2021 | IN VIOLATION | — |
| 992908 | Apr 1, 2020 | FAILURE TO INSTITUTE/MAINTAIN SAFETY MEASURES NO GUARDRAIL SYSTEM AT T | Jan 22, 2021 | IN VIOLATION | — |
| 1355273 | Jan 30, 2020 | PEDESTRIAN PROTECTION DOES NOT MEET CODE SPECIFICATIONS NOTE: @TIME OF | Jun 3, 2020 | IN VIOLATION | — |
| 1510570 | Jan 18, 2020 | FAILURE TO INSTISTUTE SAFETY EQUIPMENT MEASURES NO GUARDRAIL NOTE:AT T | Dec 7, 2020 | IN VIOLATION | — |
| 1515033 | Jan 18, 2020 | BC33012-FAILURE TO MAITAIN SAFETY MEASURE EQUIPMENT AFFECTED BY CONSTR | Mar 1, 2021 | IN VIOLATION | — |
| 1510574 | Jan 18, 2020 | 3314.1-FAILURE TO MAINTAIN SCAFFOLD.NOTE:AT TIME OF MY INSPECTION OBSE | Dec 7, 2020 | IN VIOLATION | — |
| 79500 | Nov 23, 2019 | PERMIT HOLDERS FAILED TO ESNRE WORKER RECEIVE SITE SAFTEY ORINETATION | Nov 20, 2020 | IN VIOLATION | — |
| 1507860 | Nov 18, 2019 | FAILURE TO PROVIE APPROVED ACCEPTED CONSTRUCTION DOCUMENTS AT JOBSITE | Nov 9, 2020 | IN VIOLATION | — |
| 93722 | Nov 18, 2019 | FAILURE TO MAINTAIN ADEQUATE HOUSEKEEPING PER SECTION REQUIRMENTS.AT T | Nov 9, 2020 | IN VIOLATION | — |
| 1415413 | Jun 7, 2019 | BC 1905.6.5 LOW STRENGTH TEST RESULTS(CONCRETE)AS NOTED:AT TIME OF INS | Apr 5, 2021 | IN VIOLATION | — |
| 1415246 | Jun 7, 2019 | AC 28-116.2.3 FAILURE TO PROVIDE AN ADEQUATE INSPECTION PROGRAM-IR3.AS | Apr 5, 2021 | IN VIOLATION | — |
| 1212402 | Jun 7, 2019 | BC3301.7 FAIULURE TO PROVIDE PE APPROVED DESIGN DRAWINGS.AS NOTED:AT T | Apr 5, 2021 | IN VIOLATION | — |
| 1288348 | Jan 11, 2019 | BC3307.4.7.WORK AND STORAGE ZONE.NOTE:AT THE TIME OF MY INSPECTION OF | Apr 15, 2019 | IN VIOLATION | — |
| 1400205 | Jan 11, 2019 | BC3307.7.5.DESIGN OF FENCES.NOTE:AT THE TIME OF MY INSPECTION OF A 11 | Apr 17, 2019 | IN VIOLATION | — |
| 1414663 | Jan 11, 2019 | WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND OR APPROV | Apr 17, 2019 | IN VIOLATION | — |
| 168179 | Jan 11, 2019 | WORK AFTER HOURS WITHOUT VARIANCE PERMIT CONTRARY TO 28-105.12.5 AS NO | Apr 17, 2019 | IN VIOLATION | — |
| 1352739 | Jan 11, 2019 | COLLECTION AND CONTAINMENT.NOTE:AT THE TIME OF MY INSPECTION OF A 11 S | Apr 17, 2019 | IN VIOLATION | — |
| 1442586 | Jan 11, 2019 | BC3307.6.5.7.INSTALLATION INSPECTION.NOTE:AT TIME OF MY INSPECTION OF | Apr 15, 2019 | IN VIOLATION | — |