| 1571682 | Sep 18, 2019 | 3301.4;FAILURE TO PERFORM INSPECTION AS REQUIRED ELEVATOR INSPECTION A | Jan 22, 2020 | IN VIOLATION | — |
| 1182028 | Jun 13, 2019 | FAILURE TO MAINTAIN DISPLAY ON SITE DOCUMENTS REQUIRED BY CHAPTER 33 H | Sep 30, 2019 | IN VIOLATION | — |
| 1311386 | Jun 13, 2019 | FAILURE TO INSTITUTE/MAINTAIN SAFETY EQUIPMENT MEASURES OR TEMP.CONSTR | Sep 30, 2019 | IN VIOLATION | — |
| 1368372 | Jan 9, 2019 | RESPONDENT FAILED TO MAKE THE PROPER NOTIFICATION FOR MOBILE CRANE AFT | May 13, 2019 | STIPULATION/IN-VIO | — |
| 1248547 | Oct 5, 2018 | FAILURE TO MAINTAIN AND INSTITUTE SAFETY MEASURES. AT TIME OF INSPECTI | Dec 24, 2018 | IN VIOLATION | — |
| 1211142 | Feb 3, 2018 | WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND/OR APPROV | Apr 2, 2018 | IN VIOLATION | — |
| 1211143 | Feb 3, 2018 | FAILURE TO MAINTAIN ADEQUAT HOUSEKEEPING PER SECTION.NOTE: AT THE TIME | Apr 2, 2018 | IN VIOLATION | — |
| 1284229 | Feb 3, 2018 | STORY BUIDING AT BULKHEAD LEVEL, CONTRUCION WORK IN PROGRESS. I | Apr 2, 2018 | IN VIOLATION | — |
| 1262470 | Jan 26, 2018 | WORK WITHOUT PERMIT.AT TIME OF INSPECTION,I REQUESTED ALT 2 PERMIT FOR | Mar 19, 2018 | STIPULATION/IN-VIO | — |
| 1121080 | Oct 10, 2017 | FAILURE TO FILE A COMPLETE AND ACCEPTABLE TOWER/CLIMBER INSTALLATION R | Nov 27, 2017 | ADMIT/IN-VIO | — |
| 818312 | Oct 10, 2017 | FAILURE TO FILE A COMPLETE AND ACCEPTABLE TOWER/CLIMBER INSTALLATION R | Nov 27, 2017 | Resolved | — |
| 1244799 | Aug 24, 2017 | FAILURE TO SAFEGUARD ALL PRESONS/PROPERTY AFFECTED BY CONSTRUCITON OPE | Oct 20, 2017 | IN VIOLATION | — |
| 1244807 | Aug 24, 2017 | FAILURE TO INSTITUTE/MAINTAIN SAFETY EQUIPMENT MEASURES OR TEMPORARY C | Oct 20, 2017 | IN VIOLATION | — |
| 1244792 | Aug 24, 2017 | BC3308.5:VERTICAL NETTING MISSING/INADEQUATE.NOTE:AT TIME OF INSPECION | Oct 20, 2017 | IN VIOLATION | — |
| 618254 | Jan 6, 2017 | WORKING AFTER HOURS W/OUT A VARIANCE CONTRARY TO 28-105.12.5. NOTED @ | Feb 27, 2017 | IN VIOLATION | — |
| 480216 | May 9, 2016 | BC 3303.2.1 FAILURE TO TAKE ADEQUATE MEASURES TO SAFEGAURD EXISTING UT | Jun 27, 2016 | IN VIOLATION | — |
| 1111429 | May 9, 2016 | FAILURE TO NOTIFY DOB 24-48 HOURS OF THE START OF EXCAVATION CONTRACTO | Oct 3, 2016 | ADMIT/IN-VIO | — |
| 626896 | Aug 27, 2015 | 3307.2.1 TEMP WALKING DOES NOT MEET BLDG CODE @TIME OF INSP OF PROPOSE | Feb 29, 2016 | IN VIOLATION | — |
| 786492 | Aug 1, 2015 | FAILURE TO SAFEGUARD ALL PERSONS & PROPERTY AFFECTED BY CONSTRUCTION O | Jan 25, 2016 | ADMIT/IN-VIO | — |
| 648180 | Sep 17, 2009 | FAILURE TO PROVIDE PROTECTION AT SIDES OF EXCAVATION. NOTED: EXCAVATIO | Nov 12, 2009 | IN VIOLATION | — |
| 1140945 | Mar 13, 2006 | WORK WITHOUT A PERMIT. DURING INSPECTION EXISTING BUILDING DEMOLITION | Jun 5, 2006 | WRITTEN OFF | — |
| 1140947 | Mar 13, 2006 | FAILURE TO CARRY OUT DEMOLITION OPERATIONS IN A SAFE AND PROPER MANNER | Jun 5, 2006 | WRITTEN OFF | — |
| 382674 | Sep 25, 2000 | 4A 19D NO LOW WATS CUTOFF NO MANUAL RESET A QUASTAT | Dec 30, 2002 | IN VIOLATION | — |
| 226663 | Sep 25, 2000 | 4A NO LOW WATH CUT OFF POOR VENTERLATION | Dec 30, 2002 | IN VIOLATION | — |
| 226607 | Sep 25, 2000 | 4A 19D NO HOW WATS CUT OFF NO MANUAL HESETA QUASTAT | Dec 30, 2002 | IN VIOLATION | — |
| 226212 | Sep 25, 2000 | 4A 19B 4A NO HOW WATP CUTOFF 19B NO MANUAL RESETA QUASTAT | Dec 30, 2002 | IN VIOLATION | — |