OpenViolations
/

333 Lenox Road

BrooklynBIN 3425521
HPD registration valid
Export CSV
OverviewHealth scoreTimelineFinesOwner
Open Class C
0
Immediately hazardous
Open Class B
0
Hazardous
Open Class A
0
Non-hazardous
Fines due
$0.00
Balance on OATH/ECB summonses
Permits on file
18
DOB permit records
Last activity
May 24, 2024
Bedbugs record

Building health score

A composite of public indicators. Every input is a public record. See the full methodology.

A
Health score · Jul 29, 2026
Scored from all 116 public records for this building
Open Class C violations
Immediately hazardous, uncertified
This building 0
Open Class B violations
Hazardous
This building 0
Heat & hot water records
Violations and complaints, last 24 months
This building 0
Unpaid penalties
OATH/ECB summonses with balance due
This building $0
Bedbug filings with infestations
Annual LL69 filings on record
This building 5
Tenant litigation
Open HP actions in Housing Court
This building 0
Active vacate order
HPD or FDNY order to vacate, still in effect
This building No

Unified timeline

Every record from every agency, interleaved. 116 records on file.

Download this timeline (CSV) →
Dec 4, 2025
Dec 4, 2024
May 24, 2024
Apr 17, 2024
Dec 1, 2023
Jul 3, 2023
Dec 1, 2022
Aug 4, 2022
Jul 31, 2022
Jul 31, 2022
Feb 7, 2022
Dec 8, 2021
Apr 28, 2021
Sep 2, 2020
Sep 2, 2020
Mar 26, 2020
Mar 26, 2020
Mar 26, 2020
Jan 9, 2020
Jul 1, 2019
Feb 21, 2019
Feb 21, 2019
Feb 21, 2019
Feb 21, 2019
Feb 21, 2019
Feb 21, 2019
Jan 7, 2019
Jan 6, 2019
Jan 5, 2019
Dec 27, 2017

OATH / ECB summonses & fines

No balance is recorded as due across the 31 summonses below, out of $66,675.00 in penalties imposed. The city’s published records do not show whether a penalty was paid, reduced, or written off.

OATH and ECB summonses for 333 Lenox Road
1520010Mar 26, 2020MISSING DLM TAG ON THE CONTROLLER.Oct 1, 2020IN VIOLATION
1408854Mar 26, 2020DLM TAG MISSING FROM CONTROLLEROct 1, 2020IN VIOLATION
1350719Jan 7, 2019THERE IS A BANGING NOISE IN HEAT PIPES OF THE SOUTH FRONT ZONE-THERE IFeb 25, 2019ADMIT/IN-VIO
1264635Aug 23, 20173301.2 HOIST IN READINESS -FAILURE TO MAINTAIN AT TIME OF INSPECTION ONov 1, 2017IN VIOLATION
1235128Aug 23, 20178D6,16D7,16M7,16Q3,61B7,97P7,100A1,16Q3,16I6,8B10,26N10,6B11,16T7,16O2Mar 5, 2018IN VIOLATION
1022156Jun 6, 2017BC3318.3,100M07.HEIGHT OF TRAVEL OF PERSONNEL HOIST INCREASED WITH OUTNov 8, 2017IN VIOLATION
1186448May 18, 2017SEC. 3301.4 INSPECTION. AT TIME OF INSPECTION OF 13 STY NEW BLDG UNDERAug 24, 2017IN VIOLATION
1099421May 18, 2017SEC. 3303.8.1 AIR PRESSURIZED ALARM SYSTEM FOR DRY STANDPIPE SYSTEMS DAug 14, 2017IN VIOLATION
1081136Mar 23, 2017SEC. 2104.6 FAILURE TO PROVIDE MASONRY CONSTRUCTION BRACING. AS NOTED:Jul 26, 2017IN VIOLATION
1084425Mar 22, 2017FAILURE TO SAFEGUARD.NOTICED AT TIME OF INSPECTION INCIDENT.WORKER ON Jul 17, 2017IN VIOLATION
1084496Mar 22, 2017BC3307.7.7/JOB SITE FENCE NOT TO CODE.NOTICED AT TIME OF INSPECTION JOMay 8, 2017IN VIOLATION
1179778Oct 11, 2016SEC. 3313.1 COMBUSTIBLE LIQUID-FUEL. NOTED: 2 CANISTERS OF FUEL STOREDNov 28, 2016IN VIOLATION
1179785Oct 11, 2016SEC. 3318.5 OPERATIONS. NOTED: ACTIVE JOB SITE. FRAMERS ON SITE,WORKINNov 28, 2016IN VIOLATION
958430Sep 16, 2016RESPONSIBILITY FOR SAFETY. NOTE: RESPONDING TO COMPLAINT# 3574329 WHEROct 31, 2016IN VIOLATION
958433Sep 16, 2016SEC: BC3308.6.1.4. SUPPORTED SCAFFOLD ALTERNATIVE. NOTE: @ TIME OF INSOct 31, 2016IN VIOLATION
636502Sep 16, 2016FAILURE TO SAFEGUARD ALL PERSONS & PROPERTY AFFECTED BY CONSTRUCTION OOct 31, 2016IN VIOLATION
636503Sep 16, 2016INADEQUATE SAFETY MEASURES OPERATION OF CRANE IN AN UNSAFE MANNER- OVEOct 31, 2016IN VIOLATION
1065119Apr 4, 2016PARTIAL STOP WORK ORDER. CLASS 1. DESIGNM SIZES AND CAPACITY OF MATERIAug 1, 2016IN VIOLATION
1117365Mar 11, 20163307.2.5 FAIL TO PROVIDE WHEELCHAIR RAMP FOR TEMP WALKWAY.NOTE:OBS FULMay 2, 2016IN VIOLATION
1117350Mar 11, 2016*PSWO* INADEQUATE SAFETY MEASURE:OPER'N CRANE/DERRICK/HOISTING.NOTE:OBMay 2, 2016IN VIOLATION
1117359Mar 11, 2016SMOKING AT CONSTRUCTION SITE.NOTE:OBS CRANE OPERATOR SMOKING ON SITE WMay 2, 2016IN VIOLATION
1117375Mar 11, 20163309.11 FAIL TO PROTECT TREES IN THE PUBLIC WALKWAY.NOTE:OBS A SIDEWA May 2, 2016IN VIOLATION
1127626Mar 11, 20163301.9.4 FAIL TO PROVIDE SIDEWALK SHED SIGNS.NOTE:OBS A SIDEWALK SHED May 2, 2016STIPULATION/IN-VIO
84315Mar 11, 20163307.6.4.4 FAIL TO ADEQUATELY PROTECT SIDEWALK SHED UPRIGHT ERECTED INMay 2, 2016IN VIOLATION
1133735Oct 31, 2015FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN NOV #35109691P ISSUEDec 21, 2015IN VIOLATION
1131812Aug 26, 2015WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND/OR APPROVOct 19, 2015IN VIOLATION
701383Aug 26, 2015FAILURE TO MAINTAIN: GUARDRAILS.NOTE: 13 STORY BUILDING UNDER CONSTRUCOct 19, 2015IN VIOLATION
683434Jul 20, 2015BC3303.4.1.1 FAILURE TO MAINTAIN AREA USED BY THE PUBLIC. AT THE TIME Dec 2, 2015IN VIOLATION
683430Jul 20, 2015BC3310.4 FAILURE TO HAVE SITE SAFETY MONITORING PROGRAM AT SITE AS Dec 2, 2015IN VIOLATION
683418Jul 20, 2015FAILURE TO HAVE SITE SAFETY MANAGER AT SITE WHILE WORK IN PROGRESS.AT Dec 2, 2015IN VIOLATION
1000159Jul 20, 2015I OBSERVED EVIDENCE OF SMOKING REFUSE AT THE CONSTRUCTION SITE.AT THE Nov 23, 2015IN VIOLATION