Open Class C
1
Immediately hazardous
Open Class B
4
Hazardous
Open Class A
0
Non-hazardous
Fines due
$0.00
Balance on OATH/ECB summonses
Permits on file
62
DOB permit records
Last activity
Mar 31, 2026
HPD record
Building health score
A composite of public indicators. Every input is a public record. See the full methodology.
C
Health score · Jul 29, 2026
Scored from the 300 most recent of 312 public records for this building
Open Class C violations
Immediately hazardous, uncertified
This building 1
Open Class B violations
Hazardous
This building 4
Heat & hot water records
Violations and complaints, last 24 months
This building 1
Unpaid penalties
OATH/ECB summonses with balance due
This building $0
Bedbug filings with infestations
Annual LL69 filings on record
This building 1
Tenant litigation
Open HP actions in Housing Court
This building 1
Active vacate order
HPD or FDNY order to vacate, still in effect
This building No
Unified timeline
Records from every agency, interleaved. Showing the 300 most recent of 312 records on file; the CSV below has the full history.
Mar 31, 2026
Jan 6, 2026
Dec 1, 2025
Oct 19, 2025
Jan 4, 2025
Dec 12, 2024
Dec 1, 2024
Oct 15, 2024
May 2, 2024
Feb 18, 2024
Dec 21, 2023
Nov 22, 2023
Oct 4, 2023
Oct 4, 2023
Oct 4, 2023
Jun 30, 2023
Jun 30, 2023
Jun 30, 2023
Jun 30, 2023
Jun 30, 2023
Jun 30, 2023
Jun 30, 2023
Jun 30, 2023
Jun 20, 2023
Jun 20, 2023
Jun 20, 2023
Jun 20, 2023
Jun 6, 2023
Apr 3, 2023
Apr 3, 2023
OATH / ECB summonses & fines
No balance is recorded as due across the 87 summonses below, out of $167,692.00 in penalties imposed. The city’s published records do not show whether a penalty was paid, reduced, or written off.
| 1749680 | Apr 3, 2023 | AT TIME OF INSPECTION ON A 35 STORY FACADE ALTERATION JOB SITE I OBSER | Oct 12, 2023 | IN VIOLATION | — |
| 1749681 | Apr 3, 2023 | AT TIME OF INSPECTION OBSERVED IN USE SUSPENDED SCAFFOLDING AT EXP.1 - | Oct 12, 2023 | IN VIOLATION | — |
| 1562093 | Jun 30, 2021 | FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER.NOTE:AT TIME OF INSP | Nov 10, 2021 | IN VIOLATION | — |
| 484111 | Nov 2, 2017 | UNLAWFULLY CONTINUED WORK WHILE ON NOTICE OF A STOP WORK ORDER. STOP W | Feb 26, 2018 | IN VIOLATION | — |
| 1398532 | Oct 18, 2017 | FAILURE TO PROVIDE APPROVED/ACCEPTED PLANS AT JOB SITE AT TIME OF INSP | Feb 7, 2018 | ADMIT/IN-VIO | — |
| 491320 | Feb 23, 2010 | FAILURE TO SAFEGUARD ALL PERSONS & PROPERTY AFFECTED BY CONSTRUCTION O | Apr 19, 2010 | DEFAULT | — |
| 034833559Z | Feb 23, 2010 | MISCELLANEOUS VIOLATIONS | Apr 19, 2010 | DEFAULTED | — |
| 034833560X | Feb 23, 2010 | FAILURE TO SAFEGUARD ALL PERSONS AND PROPERTY AFFECTED BY CONSTRUCTION | Apr 19, 2010 | DEFAULTED | — |
| 034833561H | Feb 23, 2010 | MISCELLANEOUS VIOLATIONS | May 17, 2010 | IN VIOLATION | — |
| 884317 | Feb 23, 2010 | SEC. BC 28-104.8.4 FAILURE TO PROVIDE TENANT PROTECTION & SAFETY PLAN | May 17, 2010 | IN VIOLATION | — |
| 574094 | Feb 23, 2010 | SEC. BC28-110-1 FAILURE TO PROVIDE OSHA CARDS FOR 10HRS COURSE COMPLET | Apr 19, 2010 | DEFAULT | — |
| 817121 | Feb 17, 2010 | FAILURE TO PROVIDE TOE BOARD - UPON INSPECTION, CONSTRUCTION OF NB IN | May 17, 2010 | IN VIOLATION | — |
| 034833399Z | Feb 17, 2010 | FAILURE TO INSTITUTE MAINTAIN SAFETY EQUIPMENT MEASURES - NO TOE BOARD | May 17, 2010 | IN VIOLATION | — |
| 707677 | Nov 14, 2009 | SIDEWALK SHED DOES NOT MEET CODE SPECIFICATIONS.OBSERVED A SIDEWALK SH | Aug 16, 2010 | IN VIOLATION | — |
| 470571 | Jun 20, 2009 | JOB SITE FENCE NOT CONSTRUCTED PURSUANT TO SUBSECTION ON INSPECTION OF | Aug 10, 2009 | DEFAULT | — |
| 474230 | May 15, 2009 | FAILURE TO SAFEGUARD PUBLIC & PROPERTY AFFECTED BY CONSTRUCTION OPERAT | Jul 9, 2009 | IN VIOLATION | — |
| 474196 | Apr 27, 2009 | FAILURE TO SAFEGUARD ALL PERSONS & PROPERTY AFFECTED BY CONSTRUCTION O | Jun 25, 2009 | IN VIOLATION | — |
| 817202 | Apr 25, 2009 | FAILURE TO POST DOT PERMIT FOR STREET/SIDEWALK CLOSING. NOTED: AT TIME | Jun 18, 2009 | IN VIOLATION | — |
| 754666 | Apr 8, 2009 | FAILURE TO MAINTAIN ADEQUATE HOUSEKEEPING PER SECTION REQUIREMENT. NOT | Jun 4, 2009 | IN VIOLATION | — |
| 754681 | Apr 8, 2009 | SEC. 3303.4.5.1 MATERIAL STORED LESS 10FT FROM PERIMETER OF BUILDING. | Jun 4, 2009 | IN VIOLATION | — |
| 814379 | Apr 8, 2009 | SEC. 1906.6.1.2 RESHORES W/I 10FT OF FACADE NOT SECURED. NOTE: AT TIME | Jun 4, 2009 | IN VIOLATION | — |
| 1091328 | Mar 30, 2009 | SEC. 1906.6.1.2 RESHORES W/I 10'FL OF FACADE SECURED FROM FALL: ON INS | Jan 14, 2010 | IN VIOLATION | — |
| 1091327 | Mar 30, 2009 | HOUSEKEEPING ON INSPECTION OF ABOVE ACTIVE SITE DEBRIS OUTSIDE VERTICA | Jan 14, 2010 | IN VIOLATION | — |
| 754696 | Mar 30, 2009 | SEC. BC3308.3 & 27-1021 VERTICAL SAFETY NETTING/DAMAGED & BROKEN ON IN | Jan 14, 2010 | IN VIOLATION | — |
| 814380 | Mar 30, 2009 | NO TOE BOAERS: ON INSPECTION OF ABOVE ACTIVE SITE,OBSERVE & NO TOE BOA | Jan 14, 2010 | IN VIOLATION | — |
| 341173 | Mar 30, 2009 | OPENING/HOLES NOT COVERED ON INSPECTION OF ABOVE ACTIVE SITE,OBSERVED | Jan 14, 2010 | IN VIOLATION | — |
| 756517 | Feb 24, 2009 | OPENINGS HOLES UNCOVERED OR INSPECTION OF ACTIVE SITE @ 74 DEKALB AVE | Apr 23, 2009 | IN VIOLATION | — |
| 756505 | Feb 24, 2009 | FAILURE TO SAFEGUARD ALL PERSONS AND PROPERTY AFFECTED BY CONST OPERAT | Apr 23, 2009 | IN VIOLATION | — |
| 756513 | Feb 24, 2009 | FAILURE TO SAFEGUARD PERSONS & PROPERTY EFFECTED BY CONST OPERATIONS O | Apr 23, 2009 | IN VIOLATION | — |
| 1091322 | Jan 24, 2009 | FAILURE TO PROVIDE HORIZONTAL SAFETY NETTING AS NOTED: AT TIME OF INSP | Jun 23, 2010 | IN VIOLATION | — |
| 753727 | Jan 20, 2009 | SEC. BC 3308.1.3 & 27-1021(A)(6) FAILURE TO PROVIDE HORIZONTAL SAFETY | Mar 19, 2009 | IN VIOLATION | — |
| 753737 | Jan 20, 2009 | SEC. 1906.6.1.2 FAILURE TO SECURE RESHORES W/I 10FT OF THE FACADE OF A | Mar 16, 2009 | IN VIOLATION | — |
| 1091318 | Jan 20, 2009 | FAILURE TO MAINTAIN ADEQUATE HOUSEKEEPING PER SECTION REQUIREMENTS AS | Jun 23, 2010 | IN VIOLATION | — |
| 1091319 | Jan 20, 2009 | FAILURE TO INSTITUTE/MAINTAIN SAFETY EQUIPMENT MEASURES OR TEMPORARY C | Jun 23, 2010 | IN VIOLATION | — |
| 1091320 | Jan 20, 2009 | OPENING/HOLES NOT COVERED. AS NOTED: UPON INSPECTION AT ABOVE ACTIVE C | Mar 16, 2009 | STIPULATION/IN-VIO | — |
| 559335 | Jan 20, 2009 | MATTERS NOT PROVIDED FOR AS NOTED: UPON INSPECTION AT ABOVE ACTIVE CON | Mar 16, 2009 | STIPULATION/IN-VIO | — |
| 467976 | Jan 20, 2009 | FAILURE TO SAFEGUARD ALL PERSONS 7 PROPERTY AFFECTED BY CONSTRUCTION O | Mar 16, 2009 | IN VIOLATION | — |
| 333242 | Jan 20, 2009 | SEC. BC3308.3 & 27-1021(G)(3) VERTICAL SAFETY NETTING DAMAGED & OR/BRO | Mar 16, 2009 | STIPULATION/IN-VIO | — |
| 466829 | Jan 8, 2009 | FAILURE TO SAFEGUARD ALL PERSONS & PROPERTY AFFECTED BY CONSTRUCTION O | Oct 28, 2009 | IN VIOLATION | — |
| 509198 | Dec 23, 2008 | FAILURE TO MAINTAIN & INSTITUTE SAFETY EQUIPMENT MEASURES OF TEMPORARY | Feb 23, 2009 | IN VIOLATION | — |
| 466665 | Dec 23, 2008 | SEC. 3309.10 - 26-230 FAILURE TO PROVIDE ROOF PROTECTION FOR ADJOINING | Jul 1, 2010 | IN VIOLATION | — |
| 466802 | Dec 23, 2008 | FAILURE TO SAFEGUARD ALL PERSONS & PROPERTY AFFECTED BY CONSTRUCTION O | Oct 28, 2009 | IN VIOLATION | — |
| 1091305 | Dec 23, 2008 | FAILURE TO SAFEGUARD ALL PERSONS & PROPERTY AFFECTED BY CONSTRUCTION O | Oct 28, 2009 | IN VIOLATION | — |
| 1091307 | Dec 23, 2008 | FAILURE TO PROVIDE REQUIRED VERTICAL NETTING UPON INSPECTION AS OBSERV | Feb 23, 2009 | STIPULATION/IN-VIO | — |
| 755871 | Dec 9, 2008 | FAILURE TO MAINTAIN ADEQUATE HOUSEKEEPING PER SECTION REQUIREMENTS. UP | Apr 23, 2009 | IN VIOLATION | — |
| 509213 | Dec 9, 2008 | FAILURE TO INSTITUTE & MAINTAIN SAFETY EQUIPMENT MEASURES OR TEMPORARY | Apr 22, 2009 | IN VIOLATION | — |
| 814213 | Dec 9, 2008 | SEC 1001.3 27-361 OBSTRUCTION OF REQUIRED WORK PLACE EXITS UPON INSP A | Mar 25, 2009 | IN VIOLATION | — |
| 882208 | Dec 9, 2008 | FAILURE TO SAFEGUARD ALL PERSONS AND PROPERTY AFFECTED BY CONSTRUCTION | Apr 22, 2009 | IN VIOLATION | — |
| 853170 | Nov 25, 2008 | FAILURE TO PROVIDE APPROVED ACCEPTED PLANS AT JOBSITE AT TIME OF INSPE | Oct 28, 2009 | IN VIOLATION | — |
| 1091304 | Nov 25, 2008 | WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS & OR APPROVED | Oct 28, 2009 | IN VIOLATION | — |
| 1091309 | Nov 25, 2008 | FAILURE TO MAINTAIN BLDG IN A CODE COMPLIANT MANOR NOTED:AT TIME OF IN | Oct 28, 2009 | IN VIOLATION | — |
| 1091310 | Nov 25, 2008 | STORAGE OF MATERIAL DURING CONSTRUCTION AS NOTED:ON ACTIVE CONSTRUCTIO | Oct 28, 2009 | IN VIOLATION | — |
| 1091282 | Nov 17, 2008 | FAILURE TO SAFEGUARD ALL PERSONS & PROPERTY AFFECTED BY CONSTRUCTION O | Jan 12, 2009 | DEFAULT | — |
| 320287 | Nov 17, 2008 | SEC. 3308.1 &27-1022 FAILURE TO PROVIDE REQUIRED VERTICAL NETTING VERT | Jul 16, 2010 | IN VIOLATION | — |
| 1091281 | Nov 17, 2008 | SEC. 28-1906.6.1.2 RESHORES ARE NOT SECURED AT EDGE OF BUILDING OF BUI | Jan 12, 2009 | DEFAULT | — |
| 1177619 | Nov 5, 2008 | FAILURE TO SAFEGUARD ALL PERSONS & PROPERTY AFFECTED BY CONSTRUCTION O | Mar 25, 2009 | IN VIOLATION | — |
| 364805 | Nov 5, 2008 | WORK W/O A PERMIT NOTED ON ACTIVE CONSTRUCTION SITE NO D.O.T. PERMIT I | Mar 25, 2009 | IN VIOLATION | — |
| 1177617 | Nov 5, 2008 | FAILURE TO SAFEGUARD ALL PERSONS & PROPERTY AFFECTED BY CONSTRUCTION O | Mar 25, 2009 | IN VIOLATION | — |
| 754185 | Nov 3, 2008 | WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND/OR APPROV | Mar 25, 2009 | IN VIOLATION | — |
| 584247 | Nov 3, 2008 | FAILURE TO MAINTAIN ADEQUATE HOUSEKEEPING PER SECTION REQUIREMENTS NOT | Mar 25, 2009 | IN VIOLATION | — |
| 754055 | Nov 3, 2008 | FAILURE TO INSTITUTE/MAINTAIN SAFETY EQUIPMENT MEASURE OR TEMPORARY CO | Mar 25, 2009 | IN VIOLATION | — |
| 754049 | Nov 3, 2008 | FAILURE TO INSTITUTE/MAINTAIN SAFETY EQUIPMENT MEASURE OR TEMPORARY CO | Mar 25, 2009 | IN VIOLATION | — |
| 813947 | Oct 30, 2008 | FAIL TO SAFEGUARD ALL PERSONS AND PROPERTY AFFECTED BY CONST OPS. AS | Sep 24, 2009 | IN VIOLATION | — |
| 813975 | Oct 30, 2008 | FAILURE TO SAFEGUARD ALL PERSONS AND PROP AFFECTED BY CONST OPERATIONS | Sep 24, 2009 | IN VIOLATION | — |
| 813976 | Oct 30, 2008 | SEC 28-103.8 MISC VIOL: MALTERS NOT PROVIDED FOR LUG BOOK ON STRAPS.AS | Sep 24, 2009 | IN VIOLATION | — |
| 816815 | Oct 30, 2008 | FAILURE TO INSTITUTE/MAINTAIN SAFETY EQUIPMENT ETC.,- NO GUARD RAILS | Sep 24, 2009 | IN VIOLATION | — |
| 816816 | Oct 30, 2008 | OPENING HOLES NOT COVER. AS NOTED: AT TIME OF INSP ON A ACTIVE CONST | Sep 24, 2009 | IN VIOLATION | — |
| 1091257 | Oct 30, 2008 | FAILURE TO SAFEGUARD ALL PERSONS AND PROP AFFECTED BY CONST OPERATIONS | Jan 27, 2010 | IN VIOLATION | — |
| 1170140 | Oct 30, 2008 | FAILURE TO SAFEGUARD ALL PERSONS AND PROP AFFECTED BY CONST OPERATIONS | Jan 27, 2010 | IN VIOLATION | — |
| 813946 | Oct 30, 2008 | FAILURE TO INSTITUTE/MAINTAIN SAFETY EQUIPMENT MEASURES - NO TOE BOARD | Sep 24, 2009 | IN VIOLATION | — |
| 460846 | Oct 23, 2008 | FAILURE TO MAINTAIN ADEQUATE HOUSEKEEPING PER SECTION REQUIREMENTS. UP | Dec 24, 2009 | IN VIOLATION | — |
| 1091256 | Oct 23, 2008 | SEC. BC3301.2 & 27-1009A. FAILURE TO INSTITUTE/MAINTAIN SAFETY EQUIPME | Dec 24, 2009 | IN VIOLATION | — |
| 1091262 | Sep 23, 2008 | FAILURE TO INSTITUTE/MAINTAIN IN SAFETY EQUIPMENT MEASURES OR TEMPORAR | Oct 28, 2009 | IN VIOLATION | — |
| 1091263 | Sep 23, 2008 | FAILURE TO INSTITUTE/MAINTAIN SAFETY EQUIPMENT MEASURES OR TEMPORARY C | Oct 28, 2009 | IN VIOLATION | — |
| 1173418 | Sep 22, 2008 | OPERATION OF A DEFECTIVE CRANE (ANTI-TWO BLOCK DEVICE DID NOT WORK @ T | May 26, 2010 | IN VIOLATION | — |
| 1091261 | Sep 18, 2008 | FAILURE TO SAFEGUARD ALL PERSON & PROPERTY AFFECTED BY CONSTRUCTION OP | Oct 28, 2009 | IN VIOLATION | — |
| 1091276 | Sep 10, 2008 | WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS OR APPROVED A | Nov 3, 2008 | STIPULATION/IN-VIO | — |
| 750645 | Sep 3, 2008 | FAILURE TO MAINTAIN ADEQUATE HOUSEKEEPING NOTED UPON INSPECTION OF THE | May 14, 2009 | IN VIOLATION | — |
| 493377 | Sep 3, 2008 | WORK DOES NOT CONFORM TO APPROVED CONST DOCUMENTS OR APPROVED AMENDMEN | May 14, 2009 | IN VIOLATION | — |
| 1091260 | Aug 18, 2008 | FAILURE TO SAFEGUARD ALL PERSONS AND PROPERTY AFFECTED BY CONSTRUCTION | Mar 25, 2009 | IN VIOLATION | — |
| 583213 | Aug 18, 2008 | FAILURE TO MAINTAIN HOUSEKEEPING PER SECTION REQUIREMENTS- UPON INSPEC | Mar 25, 2009 | IN VIOLATION | — |
| 504709 | Aug 18, 2008 | NO DESIGN DRAWING- UPON INSPECTION CONSTRUCTION OF NB IS IN PROGRESS. | Mar 25, 2009 | IN VIOLATION | — |
| 1091266 | Jul 11, 2008 | WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND OR APPROV | Sep 8, 2008 | STIPULATION/IN-VIO | — |
| 034615362J | Jan 15, 2008 | MISCELLANEOUS SITE SAFETY VIOLATIONS. | Mar 3, 2008 | DEFAULTED | — |
| 480365 | Jan 15, 2008 | FAIL TO PRVD PROTECTION @ SIDE OF EXC. UPON INSP OF THE ABOVE PLACE OF | Mar 3, 2008 | DEFAULT | — |
| 637144 | Jan 15, 2008 | DNGRS BLDGS PL & THNGS. UPON INSP OPERATOR HIT FLGMAN(EX MACHINE)CAUSI | Mar 3, 2008 | DEFAULT | — |
| 034615361H | Jan 15, 2008 | FAILURE TO PROVIDE PROTECTION AT SIDES OF EXCAVATION. | Mar 3, 2008 | DEFAULTED | — |