| 1549056 | May 3, 2021 | BOILER SAFETY VALVE DISCHARGE NOT PIPED TO A SAFE LOCATION MC1006.6 MI | Jul 18, 2022 | IN VIOLATION | — |
| 1298621 | Feb 10, 2021 | UNSAFE UNSUITABLE UNAPPROVED ELECTRICAL EQUIPMENT DEVICES APPARATUS AP | Jun 6, 2022 | IN VIOLATION | — |
| 1400471 | Feb 3, 2021 | FAIL TO PROVIDE EFFECTIVE ELECTRICAL CONTINUITY FOR METAL RACEWAYS ENC | Dec 8, 2021 | IN VIOLATION | — |
| 1401292 | Jun 12, 2018 | FAILURE TO PROVIDE ADEQUATE GROUNDINGS OF (ELECTRICAL) SYSTEMS.OBSERVE | Dec 5, 2018 | IN VIOLATION | — |
| 822717 | May 1, 2018 | FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN SUMMONS/VIO#35321884 | Jul 2, 2018 | IN VIOLATION | — |
| 1300597 | Feb 6, 2018 | FAILURE TO PROVIDE UNOBSTRUCTED EXIT PASSAGEWAY. NOTED: @ EXP#2 GATE D | May 7, 2018 | IN VIOLATION | — |
| 1601348 | Dec 4, 2017 | 50. VIOLATING CONDITION (B254) (50)NO AIR GAP ON PRESSURE REDUCING VAL | Apr 23, 2018 | IN VIOLATION | — |
| 1796568 | Aug 16, 2017 | FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN SUM/VIO#35071045K IS | Dec 4, 2017 | WRITTEN OFF | — |
| 1796565 | Aug 16, 2017 | FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN SUM/VIO#35075433K IS | Dec 4, 2017 | WRITTEN OFF | — |
| 1795324 | Jun 16, 2017 | 50,50A,15,34B,36. WEIL MCLAIN IN CELLAR BOILER ROOM, 52,000 BTU; | Aug 14, 2017 | WRITTEN OFF | — |
| 1795325 | Jun 16, 2017 | 24B,36,50,50A,50B,50C,50D,50E. 50-SAFETY VALVE DISCHARGE PIPES NOT | Aug 14, 2017 | WRITTEN OFF | — |
| 1801874 | Apr 28, 2017 | FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER,LACK OF EMERGENCY LI | Nov 27, 2017 | WRITTEN OFF | — |
| 1653291 | Jul 11, 2015 | B154,36,24,32A,15. 50A-NO FLOOR DRAIN; 50B-EXHAUST VENTING IS TOO | Aug 31, 2015 | WRITTEN OFF | — |
| 1653290 | Jul 11, 2015 | B101,50A. NO WORK PERMIT FILED WITH D.O.B. FOR THE GAS FIRED BAXI | Aug 31, 2015 | WRITTEN OFF | — |
| 1653285 | Jul 11, 2015 | B154,36,24B,50A,50B,50C. 50A-NO FLOOR DRAIN; 50B-PIPE BACKFLOW PREVEN | Aug 31, 2015 | WRITTEN OFF | — |
| 1595589 | Oct 8, 2014 | B254,36,15,32A | Dec 15, 2014 | STIPULATION/IN-VIO | — |
| 1658859 | Oct 8, 2014 | B254,36,15,32A,50A. 50A-PIPE BACK FLOW PREVENTOR DISCHARGE DOWN TO TH | Dec 15, 2014 | STIPULATION/IN-VIO | — |
| 1667061 | Oct 8, 2014 | B254,36,15,32A,50A. 50A-PIPE BACK FLOW PREVENTOR DISCHARGE DOWN. | Dec 15, 2014 | STIPULATION/IN-VIO | — |
| 1638482 | Oct 8, 2014 | B254,36,15,32A,50A. 50A-PIPE BACK FLOW DISCHARGE DOWN. | Dec 15, 2014 | STIPULATION/IN-VIO | — |
| 1676979 | Aug 2, 2011 | B354,15,16,32A,36,24B,50A,B. 50A- BOILER ROOM FIRE DOOR DEFECTIVE. 50B | Jun 29, 2012 | IN VIOLATION | — |
| 1638453 | Aug 2, 2011 | B254,4A,19B,36,32A,15,16,32A,50A,B,24B. 50A- PIPE BACK FLOW DOWN. 50B- | Jun 27, 2012 | IN VIOLATION | — |
| 1236301 | Aug 2, 2011 | B254,36,4A,19B,15,16,32A,38,50A,B,C,24B. 50A- PIPE BACK FLOW DOWN. 50B | Jun 27, 2012 | IN VIOLATION | — |
| 1471489 | Aug 2, 2011 | B254,36,4A,19B,15,16,50A,B,C,D,32A. 50A- NO CHECK VALVE ON FEED WATER | Jun 27, 2012 | IN VIOLATION | — |
| 1638452 | Aug 2, 2011 | B254,4A,19B,15,16,32A,38,36,50A. 50A- NO EMERGENCE FUEL CUT OFF SWITCH | Dec 5, 2011 | IN VIOLATION | — |
| 1638454 | Aug 2, 2011 | B254,4A,19B,36,15,16,34B,24B,38,32A,50A,B. 50A- PIPE SAFETY VALVE DOWN | Jun 27, 2012 | IN VIOLATION | — |
| 1668796 | Aug 2, 2011 | B354,15,16,32A,50A,B,19B,36. 50A- BACK FLOW MISSING. 50B- NO CHECK VAL | Jun 29, 2012 | IN VIOLATION | — |
| 1595423 | Aug 2, 2011 | B254,4A,19B,36. | Jun 27, 2012 | IN VIOLATION | — |
| 1638451 | Aug 2, 2011 | B254,38,15,16,22A,19B,4A,36. 50A- BOILER ROOM NOT A STORAGE ROOM. 50B- | Dec 5, 2011 | IN VIOLATION | — |
| 854523 | Aug 2, 2011 | B101,50A,B. 50A- WORK W/O A PERMIT. 28-105.1. 50B- NO WORK PERMIT FILE | Jun 29, 2012 | IN VIOLATION | — |
| 1387126 | Apr 30, 2009 | FAILURE TO COMPLY WITH COMM-ORDER TO OBTAIN A PERMIT PER VIOLATION 347 | Jun 3, 2010 | IN VIOLATION | — |
| 855521 | Oct 29, 2008 | WORK W/O A PERMIT WORK NOTED AT 2ND FL 5 SPTS 3RD FL 5 APTS 4FL 5 APTS | Feb 24, 2010 | IN VIOLATION | — |