OpenViolations
/

702 Grand Concourse

BronxBIN 2129467
$3,120.00 recorded as dueHPD registration valid
Export CSV
OverviewHealth scoreTimelineFinesOwner
Open Class C
0
Immediately hazardous
Open Class B
1
Hazardous
Open Class A
0
Non-hazardous
Fines due
$3,120.00
Balance on OATH/ECB summonses
Permits on file
9
DOB permit records
Last activity
Jan 12, 2026
ECB/OATH record

Building health score

A composite of public indicators. Every input is a public record. See the full methodology.

A
Health score · Jul 29, 2026
Scored from all 86 public records for this building
Open Class C violations
Immediately hazardous, uncertified
This building 0
Open Class B violations
Hazardous
This building 1
Heat & hot water records
Violations and complaints, last 24 months
This building 1
Unpaid penalties
OATH/ECB summonses with balance due
This building $3,120
Bedbug filings with infestations
Annual LL69 filings on record
This building 0
Tenant litigation
Open HP actions in Housing Court
This building 0
Active vacate order
HPD or FDNY order to vacate, still in effect
This building No

Unified timeline

Every record from every agency, interleaved. 86 records on file.

Download this timeline (CSV) →
Jan 12, 2026
Jan 12, 2026
Dec 12, 2025
Feb 18, 2025
Feb 18, 2025
Dec 28, 2024
Dec 27, 2024
Oct 30, 2024
Oct 1, 2024
Sep 23, 2024
Sep 23, 2024
May 20, 2024
Apr 22, 2024
Apr 17, 2024
Mar 28, 2024
Mar 28, 2024
Mar 28, 2024
Feb 27, 2024
Feb 27, 2024
Feb 15, 2024
Jan 22, 2024
Dec 8, 2023
Sep 1, 2023
Aug 14, 2023
Jun 21, 2023
May 25, 2023
Apr 5, 2023
Sep 16, 2022
Aug 5, 2022
Mar 7, 2022

OATH / ECB summonses & fines

$3,120.00 is recorded as due across the 13 summonses below, out of $23,520.00 in penalties imposed. The city’s published records do not show whether a penalty was paid, reduced, or written off.

OATH and ECB summonses for 702 Grand Concourse
867078Jan 12, 2026I FOUND RBI CB-1750 BOILER WITH THE VALVES CLOSE WATER LEAKING OUT OF Mar 20, 2026STIPULATION/IN-VIO$620.00
1735303Feb 18, 2025FAILURE TO MAINTAIN BUILDING WALL(S) OR APPURTENANCES. NOTED: AT TIME Oct 9, 2026Resolved$2,500.00
1589771Jul 17, 2019SEC. 3301.6 DESIGN DRAWINGS. NOTE: AT THE TIME OF INSPECTION OF A 14THSep 12, 2019IN VIOLATION
1375174Jul 17, 2019SEC. 3314.1 SCAFFOLD. NOTE: AT THE TIME OF INSPECTION OF 14TH STY BLDGSep 6, 2019DEFAULT
1459035Jul 17, 2019NO HANDRAILS. NOTE: AT THE TIME OF INSPECTION OF 14TH STY BLDG AT 4TH Sep 12, 2019IN VIOLATION
70906Jul 13, 2019DRAINAGE SYSTEM AT THE TIME OF MY INSPECTION PLANNED 14 STY NB 3 STY LFeb 14, 2020IN VIOLATION
1589770Jul 13, 20193307.6.5.7:SWS INSTALLATION REPORT AT THE TIME OF MY INSPECTION PLANNEFeb 14, 2020IN VIOLATION
1479684Jul 13, 2019WORK DOES NOT CONFORM APPROVED/ACCEPTED PLANS AT THE TIME OF MY INSPECFeb 14, 2020IN VIOLATION
70095Jul 13, 2019JOB SITE FENCE NOT AS PER CODE AT THE TIME OF MY INSPECTION PLANNED 14Feb 14, 2020IN VIOLATION
70125Jul 13, 2019SIDEWALK SHED PARAPET PANEL AT THE TIME OF MY INSPECTION PLANED 14 STYFeb 14, 2020IN VIOLATION
1216017Jul 17, 2018PROTECTION OF SIDES AT EXCAVATION. AT THE TIME OF INSPECTION IT WAS OBAug 31, 2018IN VIOLATION
1215925Jul 17, 2018SEC. 3307.6.5 INSTALLATION,ADJUSTMENT,MAINTENANCE,REPAIR USE,INSPECTIOAug 31, 2018IN VIOLATION
1336672Jun 26, 2018WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION PLANS. AT TIME OF INSPEAug 17, 2018IN VIOLATION