OpenViolations
/

330 East 100 Street

ManhattanBIN 1091032
11 open Class C$92,285.00 recorded as dueHPD registration valid
Export CSV
OverviewHealth scoreTimelineFinesOwner
Open Class C
11
Immediately hazardous
Open Class B
11
Hazardous
Open Class A
0
Non-hazardous
Fines due
$92,285.00
Balance on OATH/ECB summonses
Permits on file
0
DOB permit records
Last activity
Jul 10, 2026
DOB record

Building health score

A composite of public indicators. Every input is a public record. See the full methodology.

F
Health score · Jul 29, 2026
Scored from all 64 public records for this building
Open Class C violations
Immediately hazardous, uncertified
This building 11
Open Class B violations
Hazardous
This building 11
Heat & hot water records
Violations and complaints, last 24 months
This building 0
Unpaid penalties
OATH/ECB summonses with balance due
This building $92,285
Bedbug filings with infestations
Annual LL69 filings on record
This building 4
Tenant litigation
Open HP actions in Housing Court
This building 0
Active vacate order
HPD or FDNY order to vacate, still in effect
This building No

Unified timeline

Every record from every agency, interleaved. 64 records on file.

Download this timeline (CSV) →
Jul 10, 2026
Jul 9, 2026
Jul 1, 2026
Jun 17, 2026
Jun 17, 2026
Jun 17, 2026
Jun 17, 2026
Jun 17, 2026
Jun 17, 2026
Jun 17, 2026
Jun 17, 2026
Jun 17, 2026
May 28, 2026
May 28, 2026
May 28, 2026
May 28, 2026
Apr 20, 2026
Apr 20, 2026
Apr 18, 2026
Feb 11, 2026
Feb 9, 2026
Jan 22, 2026
Dec 19, 2025
Nov 19, 2025
Nov 13, 2025
Oct 23, 2025
Aug 11, 2025
Jun 28, 2025
Dec 16, 2024
Oct 15, 2024

OATH / ECB summonses & fines

$92,285.00 is recorded as due across the 22 summonses below, out of $92,285.00 in penalties imposed. The city’s published records do not show whether a penalty was paid, reduced, or written off.

OATH and ECB summonses for 330 East 100 Street
1834984Jul 9, 2026AT TIME OF INSPECTION NEWLY INSTALLED GAS PIPING AND FITTINGS WERE OBSSep 17, 2026PENDING$2,500.00
1126025Jun 17, 2026VF... R T S... ELEVATOR IN BUILDING OUT OF SERVICE , UPON INSPECTION TAug 27, 2026PENDING$1,250.00
1804161Jun 17, 2026ATOI OBSERVED GAS LINES RUNNING THROUGH APT 2A. NOT PROPERLY SECURED. Aug 27, 2026PENDING$2,500.00
1680198Jun 17, 2026FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. ATOI I OBSERVEDAug 27, 2026PENDING$2,500.00
1804105Jun 17, 2026UNAPPROVED/UNSAFE/UNSUITABLE ELECTRICAL EQUIPMENT, APPARATUS, MATERIALAug 27, 2026PENDING$1,600.00
1804102Jun 17, 2026ATOI OBSERVED IN BASMENT NEW GAS LINES FEEDING 24 APTS. NO PERMIT ON FAug 27, 2026PENDING$2,500.00
1680045Jun 17, 2026WORK WITHOUT A PERMIT. ATOI I I ALSO OBSERVED AT EXPOSURE 3 WINDOW WASAug 27, 2026PENDING$2,500.00
1804181May 28, 2026AT TIME OF INSPECTION OBSERVED TO CONTINUATION OF THE DEMO WORK AN ALTAug 6, 2026PENDING$10,000.00
1804182May 28, 2026ATOI, IT WAS OBSERVED THAT PLUMBING WORK IS ONGOING INSIDE THE UNIT 6CAug 6, 2026PENDING$2,500.00
1830407Apr 20, 2026DURING THE INSPECTION, ALTERATION WORK WAS OBSERVED INSIDE UNIT 6C ON Jun 25, 2026DEFAULT$2,530.00
1830416Apr 20, 2026DURING THE INSPECTION, DEMOLITION ACTIVITIES WERE OBSERVED INSIDE UNITJun 25, 2026DEFAULT$2,530.00
1800666Aug 14, 2024OBSERVED WINDOW A/C UNITS ARE ERECTED INADEQUATE MANNER ON VARIOUS FLOOct 24, 2024DEFAULT$6,250.00
852455Jun 11, 2024ATOI ON A 6 STORY BLDG, OBSERVED ELECTRICAL WORK WAS PERFORM THROUGHOUAug 22, 2024DEFAULT$6,250.00
853068Jun 11, 2024ATOI OF A 6-STORY BUILDING IT WAS OBSERVED ATEXPOSURE:#1,6TH FL PARAPEAug 22, 2024DEFAULT$3,125.00
1796684Jun 11, 2024ATOI ON A 6 STORY BLDG. PLUMBING WORK/WAS DONE THROUGHOUT THE ENTIRE PAug 29, 2024DEFAULT$6,250.00
851988Jun 11, 2024ATOI ON A 6 STORY BLDG,GENERAL CONSTRUCTION /OR ALTERATION WORK AT APTAug 22, 2024DEFAULT$6,250.00
851398Jun 11, 2024ATOI ON A 6 STORY BLDG. PLUMBING WORK/WAS DONE THROUGHOUT THE ENTIRE PAug 22, 2024DEFAULT$6,250.00
851930Jun 11, 2024ATOI ON A 6 STORY BLDG,GENERAL CONSTRUCTION /OR ALTERATION WORK AT APTAug 22, 2024DEFAULT$6,250.00
852476Apr 18, 2024ATOI ON A 6 STORY BLDG, OBSERVED ELECTRICAL WORK WAS PERFORM THROUGHOUAug 22, 2024DEFAULT$6,250.00
1795731Apr 18, 2024ATOI ON A 6 STORY BLDG,GENERAL CONSTRUCTION /OR ALTERATION WORK AT APTAug 22, 2024DEFAULT$6,250.00
1813665Jan 31, 2024OBSERVED ON FIRST FLOOR OPEN WASTE LINE FOR APARTMENT 2A WHICH CONTRARFeb 6, 2025DEFAULT$3,125.00
1162144Jul 3, 2023FAILURE TO MAINTAIN BUILDING CODE COMPLIANT. NOTED: AT THE CENTER COURSep 7, 2023DEFAULT$3,125.00