| 1804070 | Jun 17, 2026 | HB SMITH BOILER HAS DEFECTIVE FRONT FLAME SIGHT GLASS+1/2 CLOGGED FRES | Aug 27, 2026 | PENDING | $1,250.00 |
| 497552 | May 12, 2026 | AT TIME OF INSPECTION OBSERVED BUILDING IS BEING OCCUPIED W/O A VALID | Jul 16, 2026 | DEFAULT | $1,280.00 |
| 1832111 | Apr 29, 2026 | FAILURE TO MAINTAIN BUILDING EXTERIOR IN A CODE-COMPLIANT MANNER; AT T | Jul 9, 2026 | DEFAULT | $6,280.00 |
| 1832113 | Apr 29, 2026 | FAILURE TO MAINTAIN BUILDING IN A CODE-COMPLIANT MANNER; AT TIME OF IN | Jul 9, 2026 | DEFAULT | $6,280.00 |
| 1511967 | Mar 16, 2026 | I OBSERVED IN APT 2E, INSTALLATION OF ELECTRICAL STOVE OUTLET WITHOUT | May 21, 2026 | ADMIT/IN-VIO | — |
| 1511827 | Mar 16, 2026 | I OBSERVED IN APT 2E,UNSAFE UNSUITABLE ELECTRICAL CONDITIONS, UNDERSIZ | May 21, 2026 | ADMIT/IN-VIO | — |
| 1720449 | Dec 22, 2025 | ATOI, UNABLE TO GAIN ACCESS TO BUILDING, HOWEVER, OBSERVED ON THE 4TH | Mar 16, 2027 | DEFAULT | $6,250.00 |
| 1124265 | Oct 3, 2025 | FAILURE TO CERTIFY CORRECTION. FAILURE TO COMPLY WITH COMMISSIONER'S O | Dec 11, 2025 | DEFAULT | $6,250.00 |
| 799269 | Jul 17, 2025 | OBSERVED SLAYTON CLEANERS SIGN INSTALLED WITHOUT PERMIT AT EXPOSURE#1. | Sep 25, 2025 | DEFAULT | $6,250.00 |
| 1792374 | Jun 23, 2025 | FAILURE TO MAINTAIN THE BUILDING IN A CODE-COMPLIANT MANNER. AT TIME O | Jul 9, 2026 | ADMIT/IN-VIO | — |
| 1790439 | May 8, 2025 | AT TIME OF INSPECTION OBSERVED FAILURE TO CONDUCT A FINAL INSPECTION O | Jul 17, 2025 | DEFAULT | $6,250.00 |
| 1751103 | Mar 4, 2025 | FAILURE TO CLOSE ELECTRICAL PANEL BOX AT TIME OF INSPECTION OBSERVED I | May 8, 2025 | IN VIOLATION | $150.00 |
| 1765706 | Oct 2, 2024 | AN ECB VIOLATION ISSUED FOR FAILURE TO MAINTAIN BUILDING EXTERIOR IN C | Dec 12, 2024 | DEFAULT | $6,250.00 |
| 1788193 | Jun 10, 2024 | FAILURE TO MAINTAIN BUILDING. OBSERVED AT EXPOSURE#1,2 AND 4 VARIOUS L | Sep 4, 2025 | DEFAULT | $3,125.00 |
| 1685575 | Dec 9, 2021 | FAILURE TO INSTITUTE SAFETY EQUIPMENT MEASURES.AT THE TIME OF INSPECTI | Jul 21, 2022 | IN VIOLATION | $5,000.00 |
| 1398023 | Mar 27, 2020 | OPENING IN FLUE PIPE CAUSING LEAKAGE OF FUMES. MISSING HANDLE ON GAUGE | Dec 23, 2021 | IN VIOLATION | — |
| 1397980 | Jan 27, 2020 | FRESH AIR 1/2 CLOGGED-REAR FLAME SIGHT GLASS DEFECTIVE-HW MIXING VALVE | Mar 12, 2020 | DEFAULT | — |
| 1194135 | May 10, 2017 | FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER. LACK OF A SYSTEM OF | Jun 29, 2017 | IN VIOLATION | — |
| 1191096 | May 10, 2017 | SEC. 907.2.8 FAILUR TO PROVIDE FIRE ALARM SYSTEM FOR TRANSIENT USE FOR | Jun 29, 2017 | IN VIOLATION | — |
| 1191080 | May 10, 2017 | FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER. FAILURE TO PROVIDE | Jun 29, 2017 | IN VIOLATION | — |
| 1255213 | May 10, 2017 | ALTERED/CHARGED BLDG OCCUPIED W/O A VALID C OF O AS PER 28-118.3.1;28- | Jun 29, 2017 | IN VIOLATION | — |
| 1191075 | May 10, 2017 | PERMANENT DWELLING USED/CONVERTED FOR OTHER THAN PERMANENT-RESIDENTIAL | Jun 29, 2017 | IN VIOLATION | — |
| 518009 | May 22, 2009 | VIOLATING CONDITIONS 50A,50B,36,50C,50D 50A-OPENINGS IN WALLS, MUST BE | Jul 9, 2009 | STIPULATION/IN-VIO | — |
| 641188 | Nov 3, 2007 | 50A,B.COLUMBIA VT BOILER,10HP,NB 118041,OIL.50A-EVIDENCE OF OVERHEATIN | Dec 27, 2007 | STIPULATION/IN-VIO | — |
| 196199 | Oct 7, 1998 | 8A 18A 18B 49 WATER BLOW DOWN PLUMBING CORRODED AND LEAKING | Dec 3, 1998 | IN VIOLATION | — |