OpenViolations
/

540 West 146 Street

ManhattanBIN 1061952
15 open Class C$25,030.00 recorded as due
Export CSV
OverviewHealth scoreTimelineFinesOwner
Open Class C
15
Immediately hazardous
Open Class B
51
Hazardous
Open Class A
5
Non-hazardous
Fines due
$25,030.00
Balance on OATH/ECB summonses
Permits on file
0
DOB permit records
Last activity
Jun 3, 2026
DOB record

Building health score

A composite of public indicators. Every input is a public record. See the full methodology.

F
Health score · Jul 29, 2026
Scored from the 300 most recent of 387 public records for this building
Open Class C violations
Immediately hazardous, uncertified
This building 15
Open Class B violations
Hazardous
This building 51
Heat & hot water records
Violations and complaints, last 24 months
This building 0
Unpaid penalties
OATH/ECB summonses with balance due
This building $25,030
Bedbug filings with infestations
Annual LL69 filings on record
This building 0
Tenant litigation
Open HP actions in Housing Court
This building 0
Active vacate order
HPD or FDNY order to vacate, still in effect
This building No

Unified timeline

Records from every agency, interleaved. Showing the 300 most recent of 387 records on file; the CSV below has the full history.

Download this timeline (CSV) →
Jun 3, 2026
May 7, 2026
Apr 24, 2026
Jun 2, 2025
May 29, 2025
May 28, 2025
May 28, 2025
May 26, 2025
May 19, 2025
May 19, 2025
May 19, 2025
May 19, 2025
Jun 17, 2024
Jun 14, 2024
Jun 10, 2024
May 30, 2024
May 30, 2024
May 29, 2024
May 24, 2024
Apr 9, 2024
Apr 2, 2024
Apr 2, 2024
Nov 15, 2023
Jul 17, 2023
Jul 17, 2023
Jul 13, 2023
Jul 13, 2023
Jul 13, 2023
Jul 13, 2023
Jul 13, 2023

OATH / ECB summonses & fines

$25,030.00 is recorded as due across the 13 summonses below, out of $52,710.00 in penalties imposed. The city’s published records do not show whether a penalty was paid, reduced, or written off.

OATH and ECB summonses for 540 West 146 Street
490220May 7, 2026FAILURE TO SUBMIT CERTIFICATE OF CORRECTION OF VIOLATION #39117080L ISJul 16, 2026DEFAULT$6,280.00
1520911May 19, 2025PLUMBING WORK IN #43 NO PERMIT ON FILE.NEW PIPES ,DRAINS SHOWER ,SPOUTMar 5, 2026IN VIOLATION$2,500.00
1520731May 19, 2025ELECTRICAL WORK WITHOUT PERMIT;ATOI OBSERVED NEW BX RAN TROUGHOUT APT Mar 5, 2026IN VIOLATION$1,250.00
1520940May 19, 2025CONSTRUCTION WORK WITHOUT A PERMIT IN APT 43, DEMO OF WALLS, NEW WALLSMar 5, 2026IN VIOLATION$2,500.00
889129Jun 17, 2024ATOI OF A 6-STORY BUILDING OBSERVED EXPOSURE 1 METAL CORNICE MOLDING @Sep 19, 2024DEFAULT$6,250.00
1040895Jun 12, 2020NO DOOR LOCK MONITORING INSTALLED IN THIS CONTROLLER AS PER 3.10.12 OFJul 30, 2020DEFAULT$6,250.00
1445442Mar 31, 2020NO DOOR LOCK MONITORING INSTALLED IN THIS CONTROLLER AS MANDATED BY 3.Oct 15, 2020IN VIOLATION
1446206Apr 23, 2018PERMANENT DWELLING USED/COVERTED FOR OTHER THAN PERMANENT-RESIDENTIAL Sep 13, 2018IN VIOLATION
230492Apr 23, 2018SEC: BC 907.2.8. FAILURE TO PROVIDE FIRE ALARM SYSTEM FOR TRANSIENT USSep 13, 2018IN VIOLATION
1446207Apr 23, 2018MULTIPLE DWELLING CONVERTED,MAINTAINED OR OCCUPIED W/ 3 OR MORE ADDITISep 13, 2018IN VIOLATION
230249Apr 23, 2018FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER. LACK OF REQUIRED NUSep 13, 2018IN VIOLATION
230262Apr 23, 2018FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER LACK OF A SYSTEM OF Sep 13, 2018IN VIOLATION
240122Nov 30, 19995J,9H,15L,35O,35Y,46U,49U,50Y,51B. SLAMS 5 FLOOR, OILJan 20, 2000STIPULATION/IN-VIO