| 1711548 | Jun 23, 2026 | VF... HOIST WAY DOOR MISALIGNED ADJUST...8.6.4.13......COMMUNICATION I | Aug 27, 2026 | PENDING | $625.00 |
| 1828870 | May 1, 2026 | ALTERED/CHANGED BUILDING OCCUPIED WITHOUT A VALID CERTIFICATE OF OCCUP | Jan 21, 2027 | PENDING | $1,250.00 |
| 1764536 | Apr 8, 2025 | FAILURE TO SUBMIT AN ACCEPTABLE REQUIRED CYCLE 8C AND 9C REPORT OF CRI | Dec 11, 2025 | IN VIOLATION | $1,250.00 |
| 1716690 | Mar 3, 2025 | OBSERVED SIDEWALK SHED ERECTED AT EXPOSURES# 1, UPON REVIEWING DEPARTM | Nov 20, 2025 | IN VIOLATION | — |
| 1808009 | Mar 3, 2025 | I OBSERVED A SWS ERECTED AT EXPO# 1 WITH MISSING INFORMATION PANEL AS | Nov 20, 2025 | IN VIOLATION | $1,250.00 |
| 1808010 | Mar 3, 2025 | I OBSERVED SIDEWALK SHED ERECTED AT EXPOSURE# 1 WITH DISPLACED MUDSILL | Nov 20, 2025 | IN VIOLATION | $2,400.00 |
| 1805724 | Dec 6, 2024 | OCCUPANCY CONTRARY TO THAT ALLOWED BY C OF O AND DEPARTMENT OF BUILDIN | Jul 17, 2025 | IN VIOLATION | $1,250.00 |
| 1824167 | Jan 10, 2024 | FAILURE TO MAINTAIN EXTERIOR BUILDING FACADE & APPURTENANCES.NOTE:OBSE | Aug 22, 2024 | IN VIOLATION | $1,147.00 |
| 1764141 | Dec 6, 2023 | FAILURE TO MAINTAIN BUILDING WALLS AND APPURTENANCES. AT TIME OF INSPE | Feb 15, 2024 | IN VIOLATION | $2,500.00 |
| 1824584 | Dec 28, 2022 | OBSERVED IN APT 3N LIGHTING FIXTURES WERE REPLACED WITH NEW FIXTURES D | Oct 19, 2023 | DEFAULT | — |
| 1677856 | Dec 28, 2022 | OBSERVED AT THE TIME OF INSPECTION ROOF TOP BULK HEAD AT EXPO #2 AND E | Mar 9, 2023 | DEFAULT | — |
| 1677842 | Dec 28, 2022 | OBSERVED AT THE TIME OF INSPECTION A DEFECTIVE LIGHTING FIXTURE IN THE | Mar 9, 2023 | DEFAULT | — |
| 1677705 | Oct 19, 2022 | FAILURE TO SUBMIT AN ACCEPTABLE REQUIRED CYCLE 8C REPORT OF CRITICAL E | Feb 2, 2023 | DEFAULT | — |
| 1677815 | Oct 18, 2022 | CLASS 2: 25.M.7 REQUIRED FIRE SIGNAGE MISSING. PROVIDE SIGNAGE AT EACH | May 11, 2023 | IN VIOLATION | — |
| 1478564 | May 17, 2022 | WORK WITH A PERMIT NOTE:AT TIME OF INSPECTION AT AN OCCUPIED FAMILY DW | Aug 18, 2022 | ADMIT/IN-VIO | — |
| 1547608 | Feb 13, 2020 | FAILURE TO SUBMIT AN ACCEPTABLE REQUIRED CYCLE 8C REPORT OF CRITICAL | Dec 21, 2020 | IN VIOLATION | — |
| 1550147 | Feb 3, 2020 | FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.DEFECTS NOTED:RE | Oct 29, 2020 | IN VIOLATION | — |
| 1088773 | Apr 12, 2016 | FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER. DEFECTS NOTED: REAR | Jun 2, 2016 | IN VIOLATION | — |
| 719396 | Jul 28, 2015 | OCCUPANCY CONTRARY TO THAT ALLOWED BY THE CERTIFICATE OF OCCUPANCY #10 | Dec 3, 2015 | IN VIOLATION | — |
| 1178565 | Jun 20, 2015 | ALTERED/CHANGED BLDG OCCUPIED W/O A VALID C OF O. NOTE: BLDG ALTERED U | Aug 6, 2015 | STIPULATION/IN-VIO | — |
| 1011278 | Jul 13, 2012 | FAILURE TO FILE AN ACCEPTABLE 6 ROUND TECH REPORT IN COMPLIANCE W/ ART | Sep 13, 2012 | DEFAULT | — |
| 1011268 | Dec 15, 2011 | FAILURE TO FILE AN ACCEPTABLE 6TH ROUND TECHNICAL REPORT IN COMPLIANCE | Apr 12, 2012 | DEFAULT | — |
| 1011259 | Jan 25, 2011 | FAILURE TO FILE AN ACCEPTABLE 6TH ROUND TECHNICAL REPORT IN COMPLIANCE | Jul 14, 2011 | DEFAULT | — |
| 1011258 | Jul 6, 2010 | FAILURE TO FILE AN ACCEPTABLE SIXTH ROUND TECHNICAL REPORT IN COMPLIAN | Aug 26, 2010 | DEFAULT | — |
| 1011254 | Jun 4, 2010 | FAILURE TO FILE AN ACCEPTABLE 6TH ROUND TECHNICAL REPORT IN COMPLIANCE | Aug 12, 2010 | DEFAULT | — |
| 1011222 | Jan 9, 2009 | FAILURE TO SUMMIT AN ACCEPTABLE 6TH ROUND TECHNICAL REPORT IN COMPLIAN | Jun 11, 2009 | DEFAULT | — |
| 740159 | Apr 18, 2003 | FAILURE TO SUBMIT A FIFTH ROUND TECHNICAL REPORT: PERIODIC INSPECTION | May 12, 2005 | IN VIOLATION | — |
| 194642 | Jun 4, 2002 | 75#05/ 31Q07/ 14M07/ 57O02/ 57Z02/ 75 - 5YR TAG DATES 7-96, 31 RI | Apr 17, 2003 | IN VIOLATION | — |
| 84792 | Jan 30, 1990 | BREECHING NOT PROPERLY SUPPORTED. ADJUSTE OIL BURNER FLAME. CLEAN | Feb 15, 1990 | IN VIOLATION | — |
| 84797 | Jan 3, 1990 | RETURNS CORRODED. IMPROPER REPAIRS. FROM 1/3/90 NON-HAZARDOUS | Mar 1, 1990 | DEFAULT | — |
| 60734 | May 15, 1989 | BULLEYE NEED IN REAR OF BOILER | Nov 9, 1989 | IN VIOLATION | — |