| 1122810 | Dec 1, 2025 | 5/L/10 DOOR & GATE DEFECTIVE REPAIR, 2/X/10 OUT SIDE COMM INOPERATIVE | Feb 5, 2026 | ADMIT/IN-VIO | — |
| 1829673 | Oct 6, 2025 | FAILURE TO MAINTAIN BUILDING WALL (S) OR APPURTENANCES. STUCCO MISSING | Feb 11, 2027 | PENDING | $12,500.00 |
| 1538483 | Jun 11, 2025 | AIR CONDITIONING UNITS INSTALLED IN WINDOWS BLOCKING EGRESS TO FIRE ES | Aug 21, 2025 | IN VIOLATION | $625.00 |
| 1710452 | Jun 11, 2025 | NO SECTION SEEN THAT ARE FALLING, AREAS THAT HAVE BEEN PATCHED STARTIN | Jun 22, 2026 | IN VIOLATION | $5,000.00 |
| 1241120 | Dec 12, 2018 | 52B12,55B12,53U07,52U07,59D06,59B07,56Y13,61T07,57BB11,26D07,25T07,37B | Feb 7, 2019 | IN VIOLATION | — |
| 1088277 | May 9, 2018 | WORK W/O A PERMIT. NOTED: OBSERVED AT TIME OF INSPECTION IN THE APT#55 | Jun 28, 2018 | IN VIOLATION | — |
| 1290769 | Feb 28, 2018 | ELECTRICAL WORK W/OUT A PERMIT. OBSERVED THE INSTALLATION OF CIRCUIT B | Apr 20, 2018 | IN VIOLATION | — |
| 1261762 | Sep 28, 2017 | 11B07,37B07,35M07,40B07,52BB12,70B07-11B)BASEMENT LOCKOUT (COMPLY WITH | Nov 16, 2017 | STIPULATION/IN-VIO | — |
| 1059789 | Apr 26, 2014 | FAIL TO HAVE NEW OR ALTERED PLUMBING SYSTEM TESTED. ADDRESS ABOVE HAS | Jun 12, 2014 | IN VIOLATION | — |
| 1059636 | Apr 26, 2014 | WORK W/O A PERMIT ON 4/26/14 @ AROUND 3:30PM INSPECTION WAS DONE IN AP | Jun 12, 2014 | STIPULATION/IN-VIO | — |
| 825788 | Dec 29, 2009 | WORK DOES NOT CONFORM TO APPROVED PLANS. NON-CONFORMING WORK NOTED: CO | May 6, 2010 | STIPULATION/IN-VIO | — |
| 034827850N | Dec 29, 2009 | WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AMENDMENTS | May 6, 2010 | STIPULATED | — |
| 038153592R | Aug 8, 2005 | FAILURE TO MAINTAIN ELEVATOR. | Sep 22, 2005 | STIPULATED | — |
| 213019 | Aug 8, 2005 | 38Q03/51BB12/66O02/36P16/39P16 38Q03 PROPERLY INSTALL TOP OF CAR LIGHT | Sep 22, 2005 | STIPULATION/IN-VIO | — |
| 032043646H | Jan 12, 2004 | FAILURE TO MAINTAIN BOILER A . | Apr 29, 2004 | IN VIOLATION | — |
| 838647 | Jan 12, 2004 | 28B,38,48B,50A,32A,44A,50,50B. 32A) WIRE FROM ELECTRIC BOX TO BURNER 3 | Apr 29, 2004 | IN VIOLATION | — |
| 038107890H | Sep 8, 2000 | FAILURE TO MAINTAIN ELEVATOR. | Oct 26, 2000 | IN VIOLATION | — |
| 206861 | Sep 8, 2000 | 46H13,49H13. | Oct 26, 2000 | IN VIOLATION | — |
| 815398 | Aug 25, 2000 | FAILURE TO MAINTAIN BUILDING DEFECT IS FLASTER CEILING APPROX 2'X2' HA | Oct 12, 2000 | WRITTEN OFF | — |
| 034264632Z | Aug 25, 2000 | FAILURE TO MAINTAIN BUILDING: INTERIOR. | Oct 12, 2000 | WRITTEN OFF | — |
| 590964 | Jan 4, 1996 | FAILURE TO MAINTAIN. SIDE WALK SHED ERECTED WITHOUT A OPENING FOR SECO | Jul 25, 1996 | WRITTEN OFF | — |
| 128210 | Oct 11, 1995 | 14M,17I, 50Y, 61K, 73U, 30M, 61J, 50. 17WITH WIRE SLUSS 30ACCESS HOLES | Dec 14, 1995 | WRITTEN OFF | — |
| 833690 | Jan 9, 1995 | 08V, 11Q, 14M, 17I, 18I, 18Q, 21X, 28L, 31M, 37Q, 37G, 45I, 46L, 49L, | Mar 30, 1995 | WRITTEN OFF | — |
| 588405 | May 3, 1994 | FAILURE TO MAINTAIN EXTERIOR BUILDING WALL: DEFECT IS: AT FRONT WALL 1 | Jul 14, 1994 | WRITTEN OFF | — |
| 116360 | Nov 15, 1993 | 11Q,14M,22D,31L,31M,37G,54M,37Q,57O,73U,74#. 37 SELECTOR CHAIN. 74# | Apr 7, 1994 | WRITTEN OFF | — |
| 112037 | Jan 11, 1993 | 03V,09L,11Q,14M,15L,17L,18M,22D,31L,33M,35R,37G,46T,49T,51F,54M,37Q,73 | Apr 22, 1993 | WRITTEN OFF | — |
| 170947 | Apr 17, 1992 | 03U,09L,11Q,14M,15L,17L,18M,22D,28L,31L,33M,35R,37G,46T,49T,51L,54M,37 | Jun 4, 1992 | STIPULATION/IN-VIO | — |