| 1513331 | Apr 11, 2024 | FAILURE TO SUBMIT AN ACCEPTABLE REQUIRED CYCLE 9B REPORT OF CRITICAL E | Nov 6, 2025 | DEFAULT | $6,250.00 |
| 1604225 | Oct 20, 2020 | NO DOOR LOCK MONITORING INSTALLED IN THIS CONTROLLER AS MANDATED BY 3. | May 6, 2021 | IN VIOLATION | $1,250.00 |
| 1601320 | Jul 15, 2020 | NO DOOR LOCK MONITORING INSTALLED IN THIS CONTROLLER AS MANDATED BY 3. | Sep 16, 2021 | DEFAULT | $6,250.00 |
| 1409535 | Jul 6, 2017 | FAILURE TO TAKE AND PROVIDE SAFETY MEASURES WHERE REQUIRED TO THE PROT | Apr 26, 2018 | IN VIOLATION | $2,400.00 |
| 1144460 | Mar 31, 2014 | 215.2 FEEDER CONDUCORS SHALL BE SIZED SO THAT THE MAXIMUM VOLTAGE DROP | Jul 31, 2014 | WRITTEN OFF | — |
| 1144803 | Mar 31, 2014 | 250.64(D)THE EXOTHERMIC WELDING PROCESS.TOP CONDUCTORS SHALL BE CONNEC | Jul 31, 2014 | WRITTEN OFF | — |
| 1144730 | Mar 31, 2014 | FAILURE TO PROPERLY BOND ELECTRICAL SYSTEMS.BSMT SERVICE EQUIPMENT:2.4 | Jul 31, 2014 | WRITTEN OFF | — |
| 1144238 | Mar 31, 2014 | ELECTRICAL WORK W/O A PERMIT.THE ENTIRE APT9C & APT9B ONLY SUB PANEL:S | Jul 31, 2014 | WRITTEN OFF | — |
| 1637253 | Mar 31, 2014 | FAILURE TO HAVE NEW OR ALTERED PLUMBING SYSTEM TESTED.DURING PHYSICAL | Jun 26, 2014 | WRITTEN OFF | — |
| 1725825 | Mar 31, 2014 | 110.25 ELECTRICAL CLOSETS:ELECTRICAL CLOSETS OR ROOMS SHALL BE DEDICAT | May 22, 2014 | WRITTEN OFF | — |
| 1144819 | Mar 31, 2014 | FAILURE TO INSTALL GROUND-FRUIT CIRCUIT INTERRUPTION (GFCI)PROTECTION | Jul 31, 2014 | WRITTEN OFF | — |
| 1637252 | Mar 31, 2014 | OCCUPANCY CONTRARY TO THAT ALLOWED BY THE CERTIFICATE OF OCCUPANCY OR | Jul 24, 2014 | WRITTEN OFF | — |
| 1344612 | Mar 31, 2014 | WORK W/O A PERMIT ON 03/31/14 @ 2:00 P.M DURING PHYSICAL INSPECTION I | Jun 26, 2014 | WRITTEN OFF | — |
| 960703 | Dec 15, 2011 | FAILURE TO FILE AN ACCEPTABLE 6TH ROUND TECHNICAL REPORT IN COMPLIANCE | Apr 12, 2012 | IN VIOLATION | — |
| 979401 | Jan 25, 2011 | FAILURE TO FILE AN ACCEPTABLE 6TH ROUND TECHNICAL REPORT IN COMPLIANCE | Jul 14, 2011 | DEFAULT | — |
| 635076 | Mar 11, 2002 | 14M07/31Q07/62Q07/62K07/48R13/02L11/09H11/03I11/46R13/74D06/39H08/54T0 | Apr 25, 2002 | WRITTEN OFF | — |
| 635091 | Mar 11, 2002 | 73X07/ 73-RESTORE DEVICE TO SERVICE SO A COMPLETE INSP CAN BE DONE BY | Apr 25, 2002 | WRITTEN OFF | — |
| 423464 | Feb 7, 2002 | (1)B11/ (3)I11/ (3)M7/ (9)H12/ 15L11/ (16)H12/ (17)A12/ (17)Q3/ | Mar 28, 2002 | WRITTEN OFF | — |
| 423453 | Feb 7, 2002 | 73X11/ 75U5/ 73X11 = MAKE REPAIRS & RESTORE TO SERVICE FOR A FULL IN | Mar 28, 2002 | WRITTEN OFF | — |
| 812204 | Sep 26, 2001 | 73D11/ 73L11/ 73X11 / 75B05 | Nov 15, 2001 | WRITTEN OFF | — |
| 812202 | Sep 26, 2001 | 9H12/ 17A12/ 17Q3/ 17I12/ 1B11/ 22I11/ <<<< SECONG OFFENCE 14I07/ | Nov 15, 2001 | WRITTEN OFF | — |
| 812128 | Aug 28, 2001 | 1B11-9H12-17A12-17Q3-22I11-22Y2-23U16-31Q3-32Q3-35I11-3M7-16H12-53X11- | Oct 18, 2001 | WRITTEN OFF | — |
| 634927 | Jul 24, 2001 | 50Y11-73X11-75U5 73X11=MAKE REPAIRS & RESTORE TO SERVICE FOR A FULL IN | Apr 18, 2002 | WRITTEN OFF | — |
| 634924 | Jul 24, 2001 | 7H12-17A12-17Q3-17I12-1B11-22I11-22Y2-25Q3-31Q3-35I11-23U16-50Y11-47B1 | Apr 18, 2002 | WRITTEN OFF | — |
| 272795 | Mar 16, 1999 | FAILURE TO SUBMIT A FOURTH ROUND TECHNICAL REPORT: PERIODIC INSPECTION | May 6, 1999 | WRITTEN OFF | — |
| 137736 | Dec 3, 1997 | 46L50Y50F06M57Z25D22D57O#M 46-CHANGE HOIST ROPES (50) SEAL MACHINE #50 | Mar 12, 1998 | WRITTEN OFF | — |
| 234822 | Apr 28, 1997 | FAILRURE TO SUBMIT A THIRD ROUND TECHNICAL REPORT: PERIODIC | Jun 3, 1999 | WRITTEN OFF | — |
| 590738 | Apr 26, 1996 | FAILURE TO SUBMIT A THIRD ROUND TECHNICAL REPORT PERIODIC INSPECTION O | Jul 25, 1996 | WRITTEN OFF | — |
| 224706 | Jan 26, 1996 | FAILURE TO SUBMIT A THRID ROUND TECHNICAL REPORT PERIODIE INSPECTION O | Jun 3, 1999 | WRITTEN OFF | — |
| 222290 | May 13, 1994 | FAILURE TO SUBMIT A THIRD ROUND TECHNICAL REPORT: PERIODIC INSPECTION | Jun 3, 1999 | WRITTEN OFF | — |
| 103075 | Jan 29, 1993 | 14M,17I,0757O, 17. CAR PANEL CRACKED. | Apr 8, 1993 | WRITTEN OFF | — |