OpenViolations
/

172 East 79 Street

ManhattanBIN 1043252
HPD registration valid
Export CSV
OverviewHealth scoreTimelineFinesOwner
Open Class C
0
Immediately hazardous
Open Class B
15
Hazardous
Open Class A
0
Non-hazardous
Fines due
$0.00
Balance on OATH/ECB summonses
Permits on file
174
DOB permit records
Last activity
Nov 14, 2025
Bedbugs record

Building health score

A composite of public indicators. Every input is a public record. See the full methodology.

B
Health score · Jul 29, 2026
Scored from the 300 most recent of 337 public records for this building
Open Class C violations
Immediately hazardous, uncertified
This building 0
Open Class B violations
Hazardous
This building 15
Heat & hot water records
Violations and complaints, last 24 months
This building 0
Unpaid penalties
OATH/ECB summonses with balance due
This building $0
Bedbug filings with infestations
Annual LL69 filings on record
This building 0
Tenant litigation
Open HP actions in Housing Court
This building 0
Active vacate order
HPD or FDNY order to vacate, still in effect
This building No

Unified timeline

Records from every agency, interleaved. Showing the 300 most recent of 337 records on file; the CSV below has the full history.

Download this timeline (CSV) →
Dec 1, 2025
Nov 14, 2025
Dec 3, 2024
Jun 19, 2024
Feb 21, 2024
Dec 27, 2023
Sep 3, 2023
Jun 30, 2023
Jun 20, 2023
Jun 20, 2023
Jun 20, 2023
Jun 20, 2023
Jun 20, 2023
Jun 20, 2023
Jun 20, 2023
Jun 20, 2023
Dec 8, 2022
Dec 9, 2021
Jul 27, 2021
Nov 17, 2020
Sep 16, 2020
Sep 16, 2020
Sep 16, 2020
Jun 17, 2020
Jun 17, 2020
Jun 17, 2020
Jun 17, 2020
Dec 23, 2019
Apr 5, 2019
Apr 5, 2019

OATH / ECB summonses & fines

No balance is recorded as due across the 17 summonses below, out of $46,625.00 in penalties imposed. The city’s published records do not show whether a penalty was paid, reduced, or written off.

OATH and ECB summonses for 172 East 79 Street
1474238Jun 17, 2020NO DOOR LOCK MONITORING INSTALLED IN THIS CONTROLLER AS PER 3.10.12 OFDec 10, 2020IN VIOLATION
1474242Jun 17, 2020NO DOOR LOCK MONITORING INSTALLED IN THIS CONTROLLER AS PER 3.10.12 OFDec 10, 2020IN VIOLATION
1474263Jun 17, 2020NO DOOR LOCK MONITORING INSTALLED IN THIS CONTROLLER AS PER 3.10.12 OFDec 10, 2020IN VIOLATION
1035098Nov 15, 2015FILED A CERT FORM,APPLICATION (ERC),CONTAINING A MATERIAL FALSE STATEMFeb 11, 2016IN VIOLATION
1047096Dec 22, 2014FAILURE TO FILE AN ACCEPTABLE CYCLE 7 TECHNICAL REPORT IN COMPLIANCE WSep 3, 2015IN VIOLATION
1166076Sep 18, 2013LICENSED RIGGER FAILED TO ENSURE SCAFFOLD WORKER MET MINIMUM REQUIREMENov 7, 2013DEFAULT
1166075Sep 18, 2013INADEQUATE SAFETY MEASURES: OPERATION OF HOUSING EQUIPMENT IN UNSAFE MNov 7, 2013DEFAULT
1018554Aug 14, 2013FAILED TO NOTIFY DEPT/OBTAIN PERMIT PRIOR TO USE/INST OF OUTRIGGER BEAOct 3, 2013ADMIT/IN-VIO
1018555Aug 14, 2013SEC. 3314.6.3 LIFE LINES & TIE BACKS & SUSPENSION ROPES SHALL EACH BE Oct 3, 2013ADMIT/IN-VIO
1018553Aug 14, 2013SEC. 3310.5 FAILURE TO HAVE A SITE SAFETY MANAGER PRESENT AS REQUIRED.Oct 3, 2013ADMIT/IN-VIO
932014Oct 25, 2012WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND/OR APPROVDec 14, 2012IN VIOLATION
927052Aug 1, 2011WORK IS CONTRAST TO APPROVED DOB CONSTRUCTION DOC.NOTED:@ CEILING OF ESep 15, 2011IN VIOLATION
203329Mar 21, 200559Q03/59L10/32#07.(59)OVERHEAD ELEVATOR MACHINE ROOM LIGHTING IS WITHOJul 14, 2011IN VIOLATION
812056Aug 21, 200139H08-35O02-74O02-73O02-15D06-30I11-03X11. 935-O-02) REMOVE OILY RAGS.Oct 11, 2001WRITTEN OFF
812054Aug 21, 200139H08-57D06-07I11-48L11-74O02-09H11-52Y10-57O02. 57-D-06 PROPERLY SECUOct 11, 2001WRITTEN OFF
812061Aug 21, 200139H08-73O02. (39-H-08) REGROOVE TRADION SHEAUE. (73-O-02) CLEAN ENIRE Oct 11, 2001WRITTEN OFF
22535Sep 7, 1990WORK WITHOUT A PERMIT. INSTALLED 4 NEW STEEL LOLLY COLUMNS UNDER Oct 25, 1990STIPULATION/IN-VIO