OpenViolations
/

5 Tudor City Place

ManhattanBIN 1038647
HPD registration valid
Export CSV
OverviewHealth scoreTimelineFinesOwner
Open Class C
0
Immediately hazardous
Open Class B
22
Hazardous
Open Class A
1
Non-hazardous
Fines due
$0.00
Balance on OATH/ECB summonses
Permits on file
183
DOB permit records
Last activity
Oct 3, 2025
Bedbugs record

Building health score

A composite of public indicators. Every input is a public record. See the full methodology.

C
Health score · Jul 29, 2026
Scored from the 300 most recent of 570 public records for this building
Open Class C violations
Immediately hazardous, uncertified
This building 0
Open Class B violations
Hazardous
This building 22
Heat & hot water records
Violations and complaints, last 24 months
This building 0
Unpaid penalties
OATH/ECB summonses with balance due
This building $0
Bedbug filings with infestations
Annual LL69 filings on record
This building 5
Tenant litigation
Open HP actions in Housing Court
This building 0
Active vacate order
HPD or FDNY order to vacate, still in effect
This building No

Unified timeline

Records from every agency, interleaved. Showing the 300 most recent of 570 records on file; the CSV below has the full history.

Download this timeline (CSV) →
Dec 17, 2025
Oct 3, 2025
Dec 17, 2024
Aug 6, 2024
Aug 6, 2024
Aug 6, 2024
Aug 6, 2024
Aug 6, 2024
Aug 6, 2024
Aug 6, 2024
Aug 5, 2024
Aug 5, 2024
Aug 5, 2024
Aug 5, 2024
Jul 25, 2024
Jun 26, 2024
Jun 26, 2024
Jun 26, 2024
Jun 26, 2024
Jun 26, 2024
Jun 3, 2024
Jun 3, 2024
May 3, 2024
Apr 3, 2024
Apr 1, 2024
Mar 18, 2024
Mar 13, 2024
Jan 29, 2024
Oct 8, 2023
Jul 14, 2023

OATH / ECB summonses & fines

No balance is recorded as due across the 35 summonses below, out of $39,755.00 in penalties imposed. The city’s published records do not show whether a penalty was paid, reduced, or written off.

OATH and ECB summonses for 5 Tudor City Place
1500139Nov 25, 2019WORK DOES NOT CONFORM TO APPOVED CONSTRUCTION DOCUMENTS AND OR APPROVEDec 9, 2021IN VIOLATION
1500110Nov 25, 20193314.1=FAILURE TO MAINTAIN SUPPROTED SCAFFOLD IN CODE COMPLIANT AT TIMDec 9, 2021IN VIOLATION
1499895Nov 25, 2019WORK DOES NOT CON FORM TO APPROVED CONSTRUCTION DOCUMENTS AND OR APPRODec 9, 2021IN VIOLATION
1500293Nov 25, 20193301.2=FAILURE TO NSTISTUTE.MAINTAIN SFATEY MEASURES AT TIME OF INSPECDec 9, 2021IN VIOLATION
1499888Nov 25, 2019WORK DOES NOT COFNORM TO APPROVED CONSTRUCTION DOCUMENST AND OR APPROVDec 9, 2021IN VIOLATION
1310949Aug 19, 2019HOUSEKEEPING NOTE AT TIME OF INSPECTION AT A 26 STROY BUILDING ON AN ASep 24, 2020IN VIOLATION
1098713Aug 19, 2019NO STORAGE ON SHED NOTE AT TIME OF INSPECTION I OBSERVED SITE WALK SHESep 24, 2020IN VIOLATION
1239662Jul 5, 2016FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN NOV'S 35159070H;3515Jan 26, 2017IN VIOLATION
1239603Mar 16, 2016UNLAWFUL ACTS. FAILURE TO COMPLY W/AN ORDER OF THE COMMISSIONER. ON 10Jan 26, 2017IN VIOLATION
1244481Oct 30, 2015ELECTRICAL WORK W/O A PERMIT. CELLAR BOILER ROOM CO. GENERATION SYSTEMJan 26, 2017IN VIOLATION
638338Feb 6, 2013FAILURE TO PROVIDE SITE SAFETY MANAGER.NOTED: AT TIME OF INSPECTION THMay 23, 2013IN VIOLATION
826528Mar 21, 2011SEC. BC3310.6. FAILURE TO PROVIDE DESIGNATED SITE - SAFETY MANAGER. ATAug 11, 2011IN VIOLATION
923751Mar 21, 2011PARTIAL SWO - ISSUED PURSUANT TO 28-207.2 AND POSTED AT PREMISES. WORKAug 11, 2011IN VIOLATION
293471Jul 21, 2009UNLAWFULLY CONTINUED WORK WHILE ON NOTICE OF A STOP WORK ORDER. (SUSPEJan 21, 2010IN VIOLATION
571570Jul 8, 2009FAILED TO NOTIFY DEPT/OBTAIN PERMIT PRIOR TO USE/INST OF C-HOOKS IN COOct 28, 2010IN VIOLATION
293649Jul 8, 2009LICENSED RIGGER FAILED TO ENSURE SCAFFOLD WORKER MET MINIMUM REQUIREMEOct 28, 2010IN VIOLATION
510786Sep 25, 2008FAILURE TO MAINTAIN BUILDING WALL(S) OR APPURTENANCES. NOTED: @ APT 17Nov 13, 2008IN VIOLATION
706635Apr 8, 2008SEC. 27-1020. FAILURE TO POST DOT PERMIT FOR STREET/SIDEWALK CLOSING (May 29, 2008IN VIOLATION
675237Apr 8, 2008SEC. 27-146. APPROVED PLANS NOT AVAILABLE FOR INSPECTION. AT TIME OF IMay 29, 2008IN VIOLATION
281059Mar 27, 2007WORK CONTRARY TO APPROVED DOB PLANS & APPLICATION. OBSERVED HOISTING ENov 1, 2007IN VIOLATION
617618Oct 16, 2006FAILURE TO POST SIGN ON SHED AS REQUIRED BY LOCAL LAW 33/91.AS NOTED:SJul 12, 2007IN VIOLATION
730223Apr 28, 2006FAILURE TO HAVE SITE SAFETY MANAGER PRESENT AS REQUIRED. NOTED:AT Jun 20, 2007IN VIOLATION
703827Feb 8, 2006NO DESIGN DRAWING AT TIME OF INSP. ALT 2 #101902292. AT INSP. OUT RIGGJun 7, 2007IN VIOLATION
610463Feb 7, 2006NO SITE SAFETY PLAN. UPON INSPECTION AT THE ABOVE PROPERTY 26 STORIES Mar 30, 2006IN VIOLATION
742422Feb 7, 2006NO PERMIT FOR SIDEWALK SHED. UPON INSPECTION AT THE ABOVE PROPERTY. SIMar 30, 2006IN VIOLATION
610436Feb 7, 2006NO SITE SAFETY MANAGER. UPON INSPECTION AT THE ABOVE PROPERTY BLDG UNDMar 30, 2006IN VIOLATION
610501Feb 3, 2006CERTIFICATE OF APPROVAL NOT AVAILABEL FOR INSP. ALT 2 #101902292. AT IMay 18, 2006IN VIOLATION
703793Feb 3, 2006FAILURE TO SAFEGUARD PUBLIC & PROPERTY AFFECTED BY CONSTR. OPERATIONS May 18, 2006IN VIOLATION
741571Jan 24, 2005OCCUPANCY CONTRARY TO THAT ALLOWED BY THE CERTIFICATE OF OCCUPANCY: NOMar 10, 2005STIPULATION/IN-VIO
964682Oct 13, 1999OPERATION OF HOISTING EQUIPMENT IN AN UNSAFE MANNER "C" HOOKS NOT Jan 13, 2000IN VIOLATION
598258Jul 26, 1999FAILURE TO PROVIDE APPROVED SET OF PLANS AT TIME OF INSPECTION. NOTED:Jan 6, 2000IN VIOLATION
27553Jul 5, 1989WORK BEING DONE WITHOUT A PERMIT AND APPROVALS AT THE 21 FLOOR WORK NOOct 5, 1989STIPULATION/IN-VIO
8530Apr 14, 1989WORK WITHOUT A PERMIT WORK NOTED PENATRATED CONCRETE FLOOR IN LOBBY APJul 6, 1989IN VIOLATION
33324Mar 20, 1989USE OF ILLEGAL HARDWARE AT D LEVEL NORTH EXIT PADLOCK ON EXIT DOOR T OMay 4, 1989IN VIOLATION
915Jun 28, 1988OCCUPANCY CONTRARY TO THAT ALLOWED BY THE C OF O. Dec 1, 1988STIPULATION/IN-VIO