| 1726300 | Jan 30, 2025 | REMOVAL OF PUBLIC PROTECTION FROM UNSAFE FACADE WITHOUT APPROVAL FROM | May 8, 2025 | IN VIOLATION | — |
| 1661692 | May 24, 2024 | AS PER ONE WEIL MCLAIN BOILER. MODEL NO. EGH-105-S. ANSI Z21.13-2014. | Aug 1, 2024 | STIPULATION/IN-VIO | — |
| 1234540 | May 24, 2024 | AS PER ONE LAARS POTABLE HOT WATER BOILER. NATIONAL BOARD NO. 296215. | Aug 1, 2024 | STIPULATION/IN-VIO | — |
| 1223765 | Apr 11, 2024 | FAILURE TO SUBMIT AN ACCEPTABLE REQUIRED CYCLE 9B REPORT OF CRITICAL E | Aug 8, 2024 | IN VIOLATION | — |
| 1236014 | Jan 16, 2024 | FAILURE TO FILE ACCEPTABLE AMENDED CYCLE 8B REPORT INDICATING CORRECTI | Apr 18, 2024 | IN VIOLATION | — |
| 1692457 | Apr 19, 2023 | SIDEWALK SHED LIGHTING. AT TIME OF COMPLAINT INSPECTION I OBSERVED SID | Nov 21, 2023 | IN VIOLATION | — |
| 1580962 | Mar 8, 2023 | BC3303.10 FAILURE TO COMPLY WITH TENANT PROTECTION PLAN.NOTE:AT TIME O | May 18, 2023 | IN VIOLATION | $2,500.00 |
| 1687538 | Mar 8, 2023 | OBSERVED NO FRESH AIR INTAKE IN THE BOILER ROOM LOCATED IN THE CELLAR. | Nov 9, 2023 | IN VIOLATION | — |
| 1626492 | Mar 8, 2023 | I OBSERVED EXCESSIVE COMBUSTIBLE STORAGE IN THE BOILER ROOM SUCH AS PA | May 18, 2023 | IN VIOLATION | — |
| 1206392 | Feb 7, 2023 | FAILURE TO PROVIDE REQUIRED SAFETY MEASURES SUCH AS SHED NETTING,FENCE | Mar 14, 2024 | IN VIOLATION | — |
| 1235456 | Oct 8, 2021 | FAILURE TO FILE ACCEPTABLE AMENDED CYCLE8B REPORT INDICATING CORRECTIO | Feb 24, 2022 | ADMIT/IN-VIO | — |
| 1233900 | Oct 15, 2018 | FAILURE TO SUBMIT A RQUIRED CYCLE 8B REPORT OF CRITICAL EXAMINATION DO | Mar 21, 2019 | IN VIOLATION | — |
| 1507932 | Nov 12, 2004 | FAILURE TO SUBMIT A FIFTH ROUND TECHNICAL REPORT IN COMPLIANCE WITH CO | Mar 17, 2005 | IN VIOLATION | — |
| 741761 | Jun 11, 2004 | FAILURE TO SUBMIT A FIFTH ROUND TECHNICAL REPORT: PERIODIC INSPECTION | Aug 12, 2004 | IN VIOLATION | — |
| 741964 | Jan 30, 2004 | FAILURE TO SUBMIT A FIFTH ROUND TECHNICAL REPORT : PERIODIC INSPECTION | Apr 15, 2004 | IN VIOLATION | — |
| 739125 | Apr 14, 1998 | FAILURE TO SUBMIT A FOURTH A ROUND TECHNICAL REPORT: PERIODIC INSPECTI | Oct 22, 1998 | IN VIOLATION | — |
| 1569896 | Jan 28, 1998 | FAILURE TO PROVIDE FIRE RATING FOR CEILING ON THE 1ST FL & PORTION OF | Jun 25, 1998 | IN VIOLATION | — |
| 1569895 | Jan 28, 1998 | FAILURE TO PROVIDE NON-COMBUSTIBLE MATERIAL IN HANGING CEILING. | Jun 25, 1998 | IN VIOLATION | — |