OpenViolations
/

553 3 Avenue

ManhattanBIN 1020211
4 open Class C$2,584.00 recorded as dueHPD registration valid
Export CSV
OverviewHealth scoreTimelineFinesOwner
Open Class C
4
Immediately hazardous
Open Class B
10
Hazardous
Open Class A
0
Non-hazardous
Fines due
$2,584.00
Balance on OATH/ECB summonses
Permits on file
17
DOB permit records
Last activity
Aug 5, 2025
ECB/OATH record

Building health score

A composite of public indicators. Every input is a public record. See the full methodology.

D
Health score · Jul 29, 2026
Scored from all 179 public records for this building
Open Class C violations
Immediately hazardous, uncertified
This building 4
Open Class B violations
Hazardous
This building 10
Heat & hot water records
Violations and complaints, last 24 months
This building 0
Unpaid penalties
OATH/ECB summonses with balance due
This building $2,584
Bedbug filings with infestations
Annual LL69 filings on record
This building 0
Tenant litigation
Open HP actions in Housing Court
This building 0
Active vacate order
HPD or FDNY order to vacate, still in effect
This building No

Unified timeline

Every record from every agency, interleaved. 179 records on file.

Download this timeline (CSV) →
Aug 5, 2025
Jul 21, 2025
May 30, 2025
Aug 22, 2024
Jun 3, 2024
Apr 1, 2024
Oct 4, 2023
Oct 4, 2023
Oct 4, 2023
Oct 4, 2023
Apr 24, 2023
Apr 24, 2023
Apr 24, 2023
Apr 24, 2023
Apr 17, 2023
Apr 17, 2023
Apr 17, 2023
Apr 17, 2023
Mar 17, 2023
Feb 23, 2023
Feb 23, 2023
Dec 9, 2022
Dec 9, 2022
Dec 2, 2022
Nov 28, 2022
Nov 27, 2022
Nov 26, 2022
Nov 23, 2022
Nov 22, 2022
Nov 19, 2022

OATH / ECB summonses & fines

$2,584.00 is recorded as due across the 34 summonses below, out of $39,440.00 in penalties imposed. The city’s published records do not show whether a penalty was paid, reduced, or written off.

OATH and ECB summonses for 553 3 Avenue
952372Aug 5, 2025OWNER OF PROPERTY HAS FAILED TO COMPLY TO CORRECT ECB VIOLATION 390839Aug 31, 2026DEFAULT$2,530.00
1687360Apr 17, 2023I OBSERVED GAS VALVE INSTALLED BEHIND GAS STOVE FOR APT 51, WITH OUT ANov 2, 2023IN VIOLATION
1687361Apr 17, 2023I OBSERVED GAS VALVE INSTALLED FOR STOVE IN APT 51 WITH OUT ANY PERMITNov 2, 2023IN VIOLATION
1687355Apr 17, 2023I OBSERVED GAS VALVE INSTALLED FOR STOVE AT APT 51 WITH OUT ANY PERMITNov 2, 2023IN VIOLATION
1406196Nov 17, 2022FAILURE TO PROVIDE ACCESS TO BOILER FOR INSPECTION;I CALLED SUPER HE SJan 5, 2023IN VIOLATION
1690900Nov 10, 2022FAILURE TO POST & DISTRIBUTE TENANT PROTECTION PLAN.NOTE:AT TIME OF INFeb 16, 2023IN VIOLATION
1687852Nov 10, 2022FAILURE TO POST OR DISTRIBUTE SAFE CONSTRUCTION BILL OF RIGHTS.NOTE:ATFeb 16, 2023IN VIOLATION$27.00
1692678Nov 4, 2022FAILURE TO POST&DISTRIBUTE TENANT PROTECTION PLAN.NOTE:ATOI UNDER AFORFeb 9, 2023IN VIOLATION$27.00
1690885Nov 4, 2022FAILURE TO POST OR DISTRIBUTE SAFE CONSTRUCTION BILL OF RIGHTS.NOTE ATFeb 9, 2023IN VIOLATION
1708935Jan 24, 2022FOUND WEIL MCLAIN SERIES 80-7 BOILER OPERATING ONLY FOR HW DUE TO LEAKJul 14, 2022IN VIOLATION
040267152KNov 10, 2014SIDEWALK OBSTRUCTIONDec 30, 2014IN VIOLATION
547165Jan 12, 2008SEC.26-123. FAILURE TO COMPLY WITH COMMISSIONERS ORDER TO PROVIDE TWO Feb 28, 2008IN VIOLATION
034618248JJan 12, 2008MISCELLANEOUS CONSTRUCTION VIOLATION - MISCELLANEOUSFeb 28, 2008IN VIOLATION
034617554NJan 11, 2008MISCELLANEOUS CONSTRUCTION VIOLATION - MISCELLANEOUSFeb 28, 2008Pending
819644Jan 11, 2008SEC.26-123 FAILURE TO COMPLY WITH THE COMMISSIONERS ORDER TO PROVIDE TFeb 28, 2008WRITTEN OFF
040310056LJun 28, 2006FAILURE TO SWEEP 18 INCHES FROM CURBJul 31, 2006Pending
034115531KSep 7, 1994OCCUPANCY CONTRARY TO THAT ALLOWED BY C. OF O. DOB RECORDS - HAZARDOUSJan 5, 1995WRITTEN OFF
607553Sep 7, 1994OCCUPANCY CONTRARY TO THAT ALLOWED BY BUILDING DEPT. RECORDS. CREATINGJan 5, 1995WRITTEN OFF
223089Sep 7, 1994WORK WITHO UT PERMIT CREATING A HAZARDOUS CONDITION -FLOOR/CEILING Feb 15, 1996IN VIOLATION
215275Sep 7, 1994FAILURE TO PROVIDE TWO MEANS OF EGRESS FROM SPACE(SECOND MEANS OF EGREFeb 15, 1996IN VIOLATION
223041Jul 14, 1994WORK WITHOUT A PERMIT.WORK NOTED.AT 1ST STY STORE-FRONT AND 1ST STORY Mar 2, 1995DEFAULT
222936Apr 1, 1994WORK WITHOUT A PERMIT-CREATING A HAZARDOUS CONDITION-NOTED: (1) THE F-Aug 4, 1994IN VIOLATION
607541Apr 1, 1994OCCUPANCY CONTRARY TO THAT ALLOWED BY BUILDING DEPARTMENT RECORDS. -C-Aug 4, 1994IN VIOLATION
215203Apr 1, 1994FAILURE TO PROVIDE REQUIRED MEANS OF EGRESS FROM SPACE {SECOND MEANS Aug 4, 1994IN VIOLATION
034107675JApr 1, 1994OCCUPANCY CONTRARY TO THAT ALLOWED BY C. OF O. DOB RECORDS - HAZARDOUSAug 4, 1994IN VIOLATION
220300Mar 10, 1993WORK WITHOUT A PERMIT AT FIRST STORY FRON AND REAR APARTMENT NOTE CEILOct 29, 1998WRITTEN OFF
214858Feb 14, 1990WORK WITHOUT A PERMIT. REMEDY: OBTAIN A PERMIT. Oct 11, 1990IN VIOLATION
214653Feb 5, 1990WORK WITHOUT A PERMIT. REMEDY: OBTAIN A PERMIT. Aug 16, 1990IN VIOLATION
214323Jan 4, 1990WORK WITHOUT A PERMIT. DEMOLISHTION OF ALL INTERIOR PARTITIONS Mar 22, 1990STIPULATION/IN-VIO
227023Jan 4, 1990FAILURE TO PROVIDE APPROVED PLANS FOR ALTERATION 707/88 AT PREMISES Mar 22, 1990IN VIOLATION
214170Oct 28, 1988FAILURE TO PROVIDE APPROVED PLANS ON PREMISES FOR INSPECTION ALT 707/8Apr 6, 1989IN VIOLATION
577730Jul 5, 1988WORK WITHOUT A PERMIT WORK NOTED AT 1STY STORE FRONT AND 1 STY APTS RENov 3, 1988WRITTEN OFF
577269Jun 14, 1988WORK WITHOUT A PERMIT AT FIRST STORY FRONT AND REAR APARTMENT. Aug 4, 1988WRITTEN OFF
214034Jun 14, 1988FAILURE TO PROVIDE APPROVED PLAN AT JOB SITE UNDER APPROVED BN 1182/88Nov 3, 1989IN VIOLATION