| 1795141 | Apr 1, 2026 | PEDESTRIAN PROTECTION INADEQUATE. BC 3307.1. AT TIME OF INSPECTION OBS | Feb 11, 2027 | Resolved | $5,000.00 |
| 1795140 | Apr 1, 2026 | WORK OR STORAGE ZONES: MATERIAL STORED ON SIDEWALK/ROADWAY: BC 3307.4. | Feb 11, 2027 | Resolved | $5,000.00 |
| 1772261 | Nov 11, 2025 | AT TIME OF INSPECTION OBSERVED 20 STORY BUILDING 177FT IN HEIGHT. OBSE | Jan 15, 2026 | DEFAULT | $10,000.00 |
| 1773895 | Sep 9, 2025 | ALTERATION OF A 20 STORY BUILDING. OBSERVED ACTIVE GARBAGE DISPOSAL HO | Oct 6, 2026 | DEFAULT | $1,280.00 |
| 1764735 | Sep 8, 2025 | I OBSERVED APPROXIMATELY 32-JOCO CHARGING STATIONS WITH NO ELECTRICAL | Nov 13, 2025 | IN VIOLATION | — |
| 1520199 | Sep 8, 2025 | ATOI OBSERVED THAT THE PARKING GARAGE, OPERATED BY ICON PARKING, CONTA | Nov 13, 2025 | IN VIOLATION | — |
| 900211 | Mar 25, 2021 | FAILURE TO PROVIDE NOTIFICATION OF ADJUSTABLE SUSPENDED SCAFFOLD INSTA | Sep 9, 2021 | IN VIOLATION | — |
| 900490 | Mar 25, 2021 | BUILT CONTRARY TO APPROVED PLAN.AN EQUIPMENT MUST BE INSTALLED AS PER | Sep 9, 2021 | IN VIOLATION | — |
| 1326076 | Feb 26, 2021 | PERMIT HOLDER FAILED TO WORKERS RECEIVE SITE SAFETY ORIENTATION. STOP | Jun 30, 2022 | IN VIOLATION | — |
| 1326110 | Feb 26, 2021 | PERMIT HOLDER FAILED TO ENSURE WORKERS ATTEND PRE-SHIFT SAFETY MEETING | Jun 30, 2022 | IN VIOLATION | — |
| 1326271 | Feb 26, 2021 | SEC. 3307.6.5.8 PERIODIC INSPECTION,6 MONTHS INSPECTION OF SIDEWALK SH | Jun 30, 2022 | IN VIOLATION | — |
| 1326135 | Feb 26, 2021 | WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS. NOTE: AT THE | Jun 30, 2022 | IN VIOLATION | — |
| 1315733 | Feb 10, 2021 | PEDESTRIAN PROTECTION DOES NOT MEET CODE SPECIFICATIONS. AT TIME OF IN | Apr 29, 2021 | IN VIOLATION | — |
| 877637 | Jan 6, 2021 | WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND/OR APPROV | Aug 5, 2021 | IN VIOLATION | — |
| 877645 | Jan 6, 2021 | INADEQUATE STORAGE ZONE.AT TIME RESPONDING COMP#1561773 ACTIVE JOBSITE | Mar 25, 2021 | IN VIOLATION | — |
| 611533 | Mar 18, 2020 | FAILURE TO PROVIDE REQUIRED WORKER SAFETY INFORMATION SIGN AS PER RCNY | Dec 3, 2020 | IN VIOLATION | — |
| 1579569 | Mar 18, 2020 | FAILURE TO MAINTAIN SIDEWALK SHED IN CODE COMPLIANCE.AT THE TIME OF IN | Dec 3, 2020 | IN VIOLATION | $2,400.00 |
| 611529 | Mar 18, 2020 | NO STORAGE ON SIDEWALK SHED.AT THE TIME OF INSPECTION ON AN ACTIVE JOB | Nov 13, 2020 | IN VIOLATION | — |
| 1470264 | Jul 2, 2019 | FAILURE TO MAINTAIN/DISPLAY ON SITE DOCS.REQUIRED BY CHAPTER 33.AT TIM | Nov 14, 2019 | IN VIOLATION | — |
| 1520470 | Jul 2, 2019 | FAILURE TO DESIGNATE AND/OR HAVE SITE SAFETY MANAGER OR SITE SAFETY CO | May 27, 2021 | IN VIOLATION | — |
| 1520504 | Jul 2, 2019 | NO SIDEWALK SHED WHERE REQUIRED.AT TIME OF MY INSPECTION,I OBSERVED OU | May 27, 2021 | IN VIOLATION | — |
| 1293736 | Jul 2, 2019 | WORK W/O A PERMIT.AT TIME OF INSPECTION OF A 20-STORY RESIDENTIAL BLD, | Nov 14, 2019 | IN VIOLATION | — |
| 1272967 | Jun 22, 2017 | FAILURE TO FILE ANNUAL CERT. THAT COOLING TOWER 1000001606 HAS BEEN IN | Mar 8, 2018 | IN VIOLATION | — |
| 959634 | Oct 19, 2009 | 50SA.48A.B 16 FULTON VT BOILER 15HP NB 105073 OIL FD 2004 50A CORROSIO | Dec 17, 2009 | IN VIOLATION | — |
| 1265501 | Nov 7, 2008 | FAIL TO FILE AN AMENDED SIXTH ROUND REPORT ACCEPTABLE TO THIS DEPT IND | Apr 9, 2009 | WRITTEN OFF | — |
| 959625 | Sep 7, 2007 | 50A,B,C,D. FULTON V.T. BOILER, 15HP, NB81282, OIL, 1998. 50A. DETERIOR | Oct 25, 2007 | STIPULATION/IN-VIO | — |
| 699777 | Jul 25, 2003 | DANGEROUS BUILDING, THINGS AND NUISANCE. NOTED: 205 3 AV HAS. RAILING | Jan 8, 2004 | DEFAULT | — |
| 762412 | Dec 16, 2002 | PLUMBING WORK WITHOUT A PERMIT.REMEDY:OBTAIN A PERMIT IF FEISIBLE OR R | Aug 14, 2003 | IN VIOLATION | — |
| 378243 | Mar 20, 2002 | 36 ROCKMILLS BOILER. | Jun 20, 2002 | IN VIOLATION | — |
| 381071 | Mar 29, 2000 | FAILURE TO POST PERMIT FOR WORK AT PREMISES NOTED:SIDEWALK SHED INSTAL | May 25, 2000 | IN VIOLATION | — |