| 1651299 | May 12, 2023 | FAILURE TO NOTIFY THE DEPT OF AN ACCIDENT INCIDENT THAT RESULTED IN A | Apr 25, 2024 | IN VIOLATION | — |
| 1151476 | Apr 11, 2023 | IN CONTRARY WITH CODE 3301.11.5 RECORDS. A RECORD OF ALL ORIENTATIONS | Mar 7, 2024 | IN VIOLATION | — |
| 1632247 | Feb 24, 2023 | SUSPENDED SCAFFOLD NOT BUILT IN ACCORDANCE WITH THE DRAWINGS.OBSERVED | Jun 1, 2023 | IN VIOLATION | — |
| 1632270 | Feb 24, 2023 | FAILURE TO PROVIDE UNOBSTRUCTED EXIT PASSAGEWAY.OBSERVED AT TIME OF IN | Jun 1, 2023 | IN VIOLATION | — |
| 1146737 | Jul 1, 2022 | AT TIME OF INSPECTION I OBSERVED WORK AND STORAGE ZONE AREA ADJACENT | Feb 2, 2023 | IN VIOLATION | — |
| 1637417 | Mar 31, 2022 | SEC. 28-105.12.8 WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUME | Jun 30, 2022 | STIPULATION/IN-VIO | — |
| 1528237 | Mar 31, 2022 | SEC. 1RCNY-1510(L) EGRESS FROM FIRE ESCAPE BALCONIES MUST NOT BE OBSTR | Jun 30, 2022 | IN VIOLATION | — |
| 1528243 | Mar 31, 2022 | SEC. BC 3307.6.4.2.2 PEDESTRIAN PROTECTION DOES NOT MEET CODE SPECIFIC | Jun 30, 2022 | IN VIOLATION | — |
| 1528161 | Mar 31, 2022 | FAILURE TO PERFORM REQUIRED FORMWORK OBSERVTIONS: AT THE TIME OF AN IN | Jun 30, 2022 | IN VIOLATION | — |
| 1656616 | Dec 10, 2021 | UNLAWFULLY CONTINUED WORK WHILE ON NOTICE OF A STOP WORK ORDER.NOTE:AT | Mar 10, 2022 | ADMIT/IN-VIO | — |
| 950498 | Jul 6, 2021 | AT TIME OF INSPECTION OF PROPOSED 7 STORY ALT 1 OBSERVED GUARDRAIL SYS | Sep 23, 2021 | DEFAULT | — |
| 1271903 | Jun 2, 2021 | PERMIT HOLDER FAILED TO ENSURE WORKER. ATTEND PRESHIFT SAFETY MEETING. | Aug 19, 2021 | IN VIOLATION | — |
| 1522638 | Sep 8, 2020 | WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND/OR APPROV | Feb 11, 2021 | IN VIOLATION | — |
| 1429823 | Sep 8, 2020 | WORK DOES CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND/OR APPROVED A | Feb 11, 2021 | IN VIOLATION | — |
| 739851 | Aug 21, 2020 | WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND/OR AMENDM | Oct 29, 2020 | IN VIOLATION | — |
| 1521221 | Aug 21, 2020 | BC 3309.10 NO ROOF PROTECTION.NOTED:AT TIME OF MY INSPECION OF AN ALTE | Oct 29, 2020 | IN VIOLATION | — |
| 1351645 | Sep 9, 2019 | OWNER: FAILED TO ENSURE EACH CONSTRUCTION OR DEMOLITION WORKER SUCCESS | Oct 24, 2019 | IN VIOLATION | — |
| 1420438 | Sep 9, 2019 | PERMIT HOLDER: FAILED TO ENSURE EACH CONSTRUCTION OR DEMOLITION WORKER | Oct 24, 2019 | IN VIOLATION | — |
| 1591842 | May 9, 2019 | 3301.6 NO DESIGN DRAWINGS. NOTED: AT TIME OF MY INSPECTION OF A ALTER | Jul 11, 2019 | IN VIOLATION | — |
| 1591849 | May 9, 2019 | WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND /OR | Jul 11, 2019 | IN VIOLATION | — |
| 1591844 | May 9, 2019 | FAILURE TO FILE EVIDENCE OF COMPLIANCE WITH WORKERS COMPENSATION LAW | Jul 11, 2019 | IN VIOLATION | — |
| 1373319 | May 2, 2019 | THE OWNER FAILED TO ENSURE THAT EACH CONSTRUCTION OR DEMOLITION WORKER | Jan 28, 2021 | IN VIOLATION | — |
| 1444818 | May 2, 2019 | THE PERMIT HOLDER FAILED TO ENSURE THAT EACH CONSTRUCTION OR DEMOLITIO | Jan 28, 2021 | IN VIOLATION | — |
| 1444823 | May 2, 2019 | THE PERMIT HOLDER FAILED TO ENSURE THAT EACH CONSTRUCTION OR DEMOLITIO | Jan 28, 2021 | IN VIOLATION | — |
| 1444825 | May 2, 2019 | THE PERMIT FAILED TO PRODUCE FOR INSPECTION THE DAILY LOG THAT IS REQU | Jan 28, 2021 | IN VIOLATION | — |
| 1444803 | May 2, 2019 | THE OWNER FAILED TO ENSURE THAT EACH CONSTRUCTION OR DEMOLITION WORKER | Jan 28, 2021 | IN VIOLATION | — |
| 1444811 | May 2, 2019 | THE PERMIT HOLDER FAILED TO ENSURE THAT EACH CONSTRUCTION OR DEMOLITIO | Jan 28, 2021 | IN VIOLATION | — |
| 1444806 | May 2, 2019 | THE OWNER FAILED TO ENSURE THAT EACH CONSTRUCTION OR DEMOLITION WORKER | Jan 28, 2021 | IN VIOLATION | — |
| 1362263 | Sep 24, 2018 | FAILURE TO NOTIFY THE DEPARTMENT PRIOR TO COMMENCEMENT OF EARTHWORK (E | Nov 8, 2018 | IN VIOLATION | — |
| 1409891 | Sep 24, 2018 | BC3301.13.13 CONSTRUCTION SUPERINTENDENT FAILS TO MAINTAIN AND MAKE JO | Nov 8, 2018 | STIPULATION/IN-VIO | — |
| 1132437 | Nov 11, 2015 | WORK W/OUT A PERMIT:NOTED @TIME OF INSP @REAR UARD @ENTIRE PERIMETER(C | Dec 31, 2015 | ADMIT/IN-VIO | — |
| 483656 | Feb 10, 2009 | 100D06, 100K10, 64M07, 52H11, 09K10. 100D- SECURE HAP WOOD. 100- REPAI | Apr 2, 2009 | STIPULATION/IN-VIO | — |