OpenViolations
/

76 Bowery

ManhattanBIN 1002611
Export CSV
OverviewHealth scoreTimelineFinesOwner
Open Class C
0
Immediately hazardous
Open Class B
1
Hazardous
Open Class A
0
Non-hazardous
Fines due
$0.00
Balance on OATH/ECB summonses
Permits on file
0
DOB permit records
Last activity
Jan 27, 2020
ECB/OATH record

Building health score

A composite of public indicators. Every input is a public record. See the full methodology.

A
Health score · Jul 29, 2026
Scored from all 57 public records for this building
Open Class C violations
Immediately hazardous, uncertified
This building 0
Open Class B violations
Hazardous
This building 1
Heat & hot water records
Violations and complaints, last 24 months
This building 0
Unpaid penalties
OATH/ECB summonses with balance due
This building $0
Bedbug filings with infestations
Annual LL69 filings on record
This building 0
Tenant litigation
Open HP actions in Housing Court
This building 0
Active vacate order
HPD or FDNY order to vacate, still in effect
This building No

Unified timeline

Every record from every agency, interleaved. 57 records on file.

Download this timeline (CSV) →
Jan 27, 2020
Nov 13, 2019
Oct 24, 2019
Oct 22, 2019
Oct 22, 2019
Aug 14, 2019
Aug 14, 2019
Aug 14, 2019
Aug 14, 2019
Aug 14, 2019
Aug 14, 2019
Aug 14, 2019
Aug 14, 2019
Aug 14, 2019
Aug 14, 2019
Aug 14, 2019
Aug 5, 2019
Jul 5, 2019
Jul 3, 2019
Jun 6, 2019
Jun 6, 2019
May 7, 2019
May 7, 2019
Apr 16, 2019
Apr 11, 2019
Apr 4, 2019
Apr 3, 2019
Nov 27, 2018
Nov 27, 2018
Nov 27, 2018

OATH / ECB summonses & fines

No balance is recorded as due across the 24 summonses below, out of $47,525.00 in penalties imposed. The city’s published records do not show whether a penalty was paid, reduced, or written off.

OATH and ECB summonses for 76 Bowery
734380Oct 22, 2019BC3301.1.3.TRAFFIC BARRIER NOT AS PER MANUFACTURER SPECIFICATION.NOTE:Oct 1, 2020IN VIOLATION
1375584Aug 14, 2019BC 3314.3.3 C-HOOK DESIGN DRAWINGS @TIME OF INSPECTION OF A ACTIVE PRJun 25, 2020IN VIOLATION
605441Aug 14, 2019BC 3303.8 STANDPIPE NOT ON STATE OF READYNESS. @TIME OF INSPECTION OF Jun 25, 2020IN VIOLATION
605381Aug 14, 2019FAILURE TO MAINTAIN/DISPLAY ON SITE DOCUMENTS @TIME OF INSPECTION OF AJun 25, 2020IN VIOLATION
605883Aug 14, 2019BC 3301.1.3 MANUFACTURER SPECIFICATIONS @TIME OF INSPECTION OF A ACTIVJun 25, 2020IN VIOLATION
606003Aug 14, 2019HOUSKEEPING @TIME OF INSP OF A ACTIVE 8 STY NB @ROOF LVL I OBSERVED INJun 25, 2020IN VIOLATION
605769Aug 14, 2019BC 3303.7.2 FIRE EXTINGUISHER @TIME OF INSPECTION OF A ACTIVE PROPOSEDJun 25, 2020IN VIOLATION
1375575Aug 14, 2019BC 3314.4.3.1 PRE. INSTALLATION LETTER @TIME OF INSPECTION OF A ACTIVEJun 25, 2020IN VIOLATION
605748Aug 14, 2019BC 3301.2 INADEQUATE GUARDRAILS @TIME OF INSPECTION OF A ACTIVE PROPOSJun 25, 2020IN VIOLATION
605732Aug 14, 2019BC 3309.10 ADJACENT ROOF PROTECTION @TIME OF INSPECTION OF A PROPOSED Jun 25, 2020IN VIOLATION
1375576Aug 14, 2019BC 3314.4.3.2 INSTALLATION LETTER @TIME OF INSPECTION OF A ACTIVE PROPJun 25, 2020IN VIOLATION
799431Aug 5, 2019INSULATION PLACEMENT DOES NOT MEET MIN REQ. ON AN ENERGY COMPLIANCE INOct 1, 2020IN VIOLATION
1158706Jul 3, 2019FAILURE TO INSTITUTE/MAINTAIN SAFETY EQUIPMENT MEASURES FOR TEMPORARY Feb 6, 2020IN VIOLATION
1431111May 7, 2019AT TIME OF INSPECTION,NB 8 STORY ACTIVE JOBSITE,I OBSERVED MEN WORKINGJul 11, 2019IN VIOLATION
798387Apr 16, 2019INSULATION PLACEMENT DOES NOT MEET MIN. REQ. ON AN ENERGY COMPLIANCE IOct 1, 2020IN VIOLATION
995508Apr 4, 2019REQIURED SIDEWALK SHED AT TIME OF INSPECTION IN RESPONSE TO COMPLAINT#Sep 26, 2019IN VIOLATION
1402520Nov 27, 2018FAILURE TO MAINTAIN ADEQUATE HOUSEKEEPING PER SECTION REQUIRED. 8 STORJun 20, 2019IN VIOLATION
1402521Nov 27, 2018BC3301.5.UNSAFE CONDITION AND EQUIPMENT-GRINDER WITHOUT SAFETY GUARD IJun 20, 2019IN VIOLATION
1402522Nov 27, 2018BC3309.1 FAILURE TO PROTECT ADJOINING PROPERTIES DURING DEMO OR CONSTRJun 20, 2019IN VIOLATION
1302706Sep 6, 2018CONSTRUCTION DEBEIS ON THE STREET(HOUSE KEEPING)AT THE TIME OF MY INSPOct 25, 2018IN VIOLATION
1302742Sep 6, 2018NO DOT PERMIT FOR STREET STORAGE.AT THE TIME OF INSPECTION OF THE PROPOct 25, 2018IN VIOLATION
1362566Jun 14, 2018FAILURE TO SAFEGUARD. AT TIME OF INSPECTION OF A NEW 8 STORY BLDG AT EJan 24, 2019IN VIOLATION
1340644May 3, 2018INADEQUATE LOG BOOK.AT THE TIME OF MY INSPECTION OF A 8 STORY BLDG AT Aug 16, 2018IN VIOLATION
972177Nov 20, 2013WORK W/O A PERMIT. NOTED: AT 1ST STY NORTH ENTRY DOOR FROM STREET TO Jan 9, 2014IN VIOLATION