| 1499807 | Apr 20, 2026 | FAILURE TO FILE ACCEPTABLE AMENDED CYCLE 7B, 8B, AND 9B REPORT INDICAT | Jul 16, 2026 | IN VIOLATION | $3,125.00 |
| 1815577 | Jan 8, 2026 | AT FRONT OF BUILDING,AT SIDEWALK, METAL GRATE APPROXIMATELY 12' X 6' H | Mar 19, 2026 | IN VIOLATION | — |
| 1609080 | Jan 16, 2024 | FAILURE TO FILE ACCEPTABLE AMENDED CYCLE 7B REPORT INDICATING CORRECTI | May 16, 2024 | IN VIOLATION | — |
| 1507616 | Oct 5, 2023 | WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND/OR APPROV | Dec 14, 2023 | IN VIOLATION | — |
| 1354566 | Oct 19, 2022 | FAILURE TO SUBMIT ACCEPTABLE REQ CYCLE8B REPORT OF CRITICAL EXAM DOC C | May 4, 2023 | IN VIOLATION | — |
| 1560865 | Oct 8, 2021 | FAILURE TO FILE ACCEPTABLE AMENDED CYCLE 7B REPORT INDICATING CORRECTI | Jun 30, 2022 | IN VIOLATION | — |
| 1590399 | Jun 1, 2021 | FAILURE TO SUBMIT ACCEPTABLE REQUIRED CYCLE 8B REPORT OF CRITICAL EXAM | Mar 3, 2022 | IN VIOLATION | — |
| 1586178 | May 6, 2021 | FAILURE TO MAINTAIN BUIDLING EXTEIROR WALLS.FACADE AND APPURTENANCES N | Mar 10, 2022 | IN VIOLATION | — |
| 1481332 | Oct 30, 2019 | BC331482-DEBRIS NETTING.AT THE TIME OF MY INSPECTION OF PROPOSED DEMOL | Mar 19, 2020 | IN VIOLATION | — |
| 1101625 | Oct 29, 2019 | TEMPORARY CONSTRUCTION EQUIPMENT ON SITE-EXPIRED PERMIT. AT TIME OF IN | Apr 16, 2020 | IN VIOLATION | — |
| 1101258 | Oct 29, 2019 | ERECTED OR INSTALLED SUPPORTED PIPE SCAFFOLD 40' OR HIGHER W/O A PERMI | Apr 16, 2020 | IN VIOLATION | — |
| 1051299 | Oct 21, 2019 | TEMPORARY CONSTRUCTION EQUIPMENT ON SITE-EXPIRED EQUIPMENT.NOTED:AT TI | Dec 26, 2019 | IN VIOLATION | — |
| 1552963 | Sep 13, 2019 | TEMPORARY CONSTRUCTION EQUIPMENT SITE-EXPIRED PERMIT.AT THE TIME OF IN | Jul 2, 2020 | IN VIOLATION | — |
| 1471162 | May 16, 2019 | TEMPORARY CONST EQUIPMENT ON SITE EXPIRED PERMIT 11 STY, DEMO-MONITORI | Sep 26, 2019 | IN VIOLATION | — |
| 1536383 | Feb 8, 2019 | TEMPORARY CONSTRUCTION EQUIPMENT EXPIRED. NOTE: AT THE TIME OF MY INSP | Jul 25, 2019 | IN VIOLATION | — |
| 1536409 | Feb 8, 2019 | SEC. 3301.2 FAILURE TO INSTITUTE & MAINTAIN TEMPORARY EQUIPMENT MEASUR | Jul 25, 2019 | IN VIOLATION | — |
| 1536325 | Feb 8, 2019 | SEC. 3309.10 ROOF PROTECTION. NOTE: AT THE TIME OF MY INSPECTION OF AN | Jul 25, 2019 | IN VIOLATION | — |
| 453552 | Oct 22, 2018 | PEDESTRIAN PROTECTION DOES NOT MEET CODE SPECIFICATIONS.NOTE:AT TIME O | Dec 13, 2018 | IN VIOLATION | — |
| 1246236 | Oct 15, 2018 | FAILURE TO SUBMIT A REQUIRED CYCLE 8B REPORT OF CRITICAL EXAMINATION D | Aug 1, 2019 | IN VIOLATION | — |
| 1042699 | Aug 7, 2018 | 3314.8.2 NETTING. AT TIME OF INSPECTION OBSERVED 11 STORY BUILDING INC | Sep 27, 2018 | STIPULATION/IN-VIO | — |
| 1414240 | Jul 6, 2018 | FAILURE TO COMPLY WITH THE COMMISSIONERS ORDER CONTAINED IN SUMMONS/ | Jan 31, 2019 | IN VIOLATION | — |
| 1552109 | Oct 19, 2017 | FAILURE TO POST OR PROPERLY PERMIT FOR WORK AT PREMISES.AT THE TIME OF | Mar 29, 2018 | IN VIOLATION | — |
| 872942 | Oct 18, 2017 | 3314.8.2.DEBRIS NETTING,SCAFFOLD.NOTE:@ TIME OF INSPECTION OBSERVED 11 | Dec 7, 2017 | STIPULATION/IN-VIO | — |
| 873493 | Nov 7, 2016 | FAILURE TO FILE ACCEPTABLE AMENDED REPORT INDICATING COARRECTION OF U | Mar 1, 2017 | IN VIOLATION | — |
| 1114503 | May 29, 2015 | FAILURE TO FILE AN ACCEPTABLE AMENDED CYCLE 7 REPORT TO THIS DEPT INDI | Feb 18, 2016 | IN VIOLATION | — |
| 1100213 | Nov 28, 2014 | FAILURE TO FILE AN ACCEPTABLE AMENDED CYCLE 7 REPORT TO THIS DEPT INDI | Apr 23, 2015 | IN VIOLATION | — |
| 1056236 | Apr 26, 2010 | 97X10 - RETURN TO SERVICE SO THAT A FULL INSP CAN BE MADE BY THIS DEPT | Nov 4, 2010 | WRITTEN OFF | — |